Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Welton Farm Landfill/Riverbank Works + (Perth and Kinross Council)
- Case study:Prologis Midpoint Park river restoration scheme + (Prologis)
- Case study:The Ciobarciu Wetland Project + (Prut - Barlad River Basin Authority)
- Case study:Swindale Beck Restoration + (RSPB)
- Case study:Rheinauen bei Rastatt + (Regierungspraesidium Karlsruhe)
- Case study:Room for the River + (Rijkswaterstaat Oost-Nederland)
- Case study:Resilient River + (River Nene Regional Park)
- Case study:Lugton Water Fish Barrier Easement + (Royal HaskoningDHV)
- Case study:Reméandration du Geer à Grand-Axhe + (SAR Consult)
- Case study:Zújar river restoration in the reach between the ford of "Entrerríos" and its mouth, Badajoz. + (SEFOEX, S.A.)
- Case study:River Dulais Restoration Project + (Salix)
- Case study:Upper River Nairn restoration project + (Salix - McGowan)
- Case study:River Cole Restoration + (Sanctus Ltd)
- Case study:Habitat improvement project in Segre river, in Alòs de Balaguer + (Societat de Pescadors d'Alòs de Balaguer)
- Case study:Water is Environmental Pearl (WEP) - SLO-HU ETE 2007-2013 + (Solvex co., Hungary)
- Case study:Revitalisation of branch ’Felsőszentmártoni’ at River Dráva + (South Transdanubian Regional Development Council and Agency)
- Case study:Rinya water-system reconstruction + (South-Transdanubian Environmental Protection and Water Management Directorate)
- Case study:River Calder Large Wood Structure installation + (Spey Catchment Initiative)
- Case study:Isar-Plan + (State Office for Water Management Munich)
- Case study:Stroud Rural Sustainable Drainage Project + (Stroud District Council)
- Case study:Rio Tepice urban restoration + (Studio Blanchard-Gallo)
- Case study:Restoration of the longitudinal continuity along the Canche and its classified tributaries + (Syndicat mixte pour le SAGE de la Canche)
- Case study:Remediation and revitalization of Séd-Nádor stream + (Séd-Nádor 2009 Consortium)
- Case study:Zújar river restoration in the reach between the dam and the ford of "El Espolón" , Badajoz. + (TALHER, S.A.)
- Case study:Actions for environmental regeneration and flow control in Odra's Basin, Burgos + (TECONSA (Tecnología de la Construcción, SA))
- Case study:RESTORATION OF THE GORIŠKI BREŽIČEK STREAM + (TGM Bizjak)
- Case study:Hampton Court Palace + (Thames Landscape Strategy)
- Case study:River Pool Linear Park Enhacement + (Thames21)
- Case study:Saving Chiswick Eyot + (Thames21)
- Case study:Rewilding the Rom + (Thames21)
- Case study:Chinbrook Meadows Wetlands + (Thames21)
- Case study:The Babina Restoration Project + (The Danube Delta Biosphere Reserve Authority, Tulcea)
- Case study:The Fortuna Restoration Project + (The Danube Delta Biosphere Reserve Authority, Tulcea)
- Case study:Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes + (Tragsatec)
- Case study:Restoration of the stream of the Partido + (Tragsatec)
- Case study:Recovery of the functionality of Brazo de la Torre + (Tragsatec)
- Case study:Recovery "CañoTravieso" + (Tragsatec)
- Case study:Haltwhistle burn; a total catchment approach + (Tyne Rivers Trust)
- Case study:River Don Restoration project + (Tyne Rivers Trust)
- Case study:International recovery of the river Minho: an example of sustainable hydraulic exploitation + (Unión Fenosa S.A.)
- Case study:Restoration of Grobruelva + (Vannområdet Indre Oslofjord Vest; For some measures: Lierskogen Vel, Lier municipality and Buskerud JFF)
- Case study:Environmental regeneration project in Magro river bed + (Vielca Ingenieros S.A.)
- Case study:South Calder Water deculverting and habitat restoration + (WSP group)
- Case study:Conservation of alluvial + (WWF Hungary, Cargill Hungary, Transdanubian Regional Waterworks Public Company (DRV Zrt.))
- Case study:Agreed definition of mobility area for the Adour + (Water Agency)
- Case study:Removal of twenty small structures and diversification of the Main Channel of the River Couasnon + (Water Agency)
- Case study:Recreation of a low-flow sinuous channel in an urban stretch of the Montvaux stream + (Water Agency)
- Case study:Recreation of a sinuous low-flow channel in the Merloz + (Water Agency)
- Case study:Restoration of the previous riverbed of the Dadon + (Water Agency)
- Case study:Improving the structure of the Lahn-patak in Hungary + (West-Transdanubian Water Management Directorate)
- Case study:River Avon Habitat Enhancement, Fifield + (Wild Trout Trust)
- Case study:Manthorpe Floodplain Reconnection + (Wild Trout Trust)
- Case study:Wild Wylye Phase 1 + (Wiltshire Wildlife Trust)
- Case study:Cudworth dyke restoration project + (Yorkshire Water)