Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Bijloop + (Mark)
- Case study:Thamesmead Canal Corridor Masterplan + (Marsh Dykes (Woolwich))
- Case study:Parsloes Park + (Mayes Brook East/Gores Brook)
- Case study:Goresbrook Park + (Mayes Brook East/Gores Brook)
- Case study:Goresbrook and Ship and Shovel Sewer + (Mayes Brook East/Gores Brook)
- Case study:Recreation of a sinuous low-flow channel in the Merloz + (Merloz)
- Case study:Marsh restoration on the Merlue + (Merlue)
- Case study:Meers - Floodplain lowering + (Meuse)
- Case study:Rijkelse Bemden - River bed widening + (Meuse)
- Case study:Aaijen- Removal of bank fixation + (Meuse)
- Case study:Voorste Nete at Dessel + (Meuse)
- Case study:Reméandration du Geer à Grand-Axhe + (Meuse)
- Case study:River Darent at Hawley Manor + (Mid Darent)
- Case study:Lullingstone Castle + (Mid Darent)
- Case study:Lullingstone Castle phase 2 + (Mid Darent)
- Case study:Darent Valley Path + (Mid Darent)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Environmental restoration of the wet ecosystem along the Ufente river + (Middle Appenines - Badino)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Construction of green infrastructures in the Fondazione Caetani farm – Restoration of the Fosso Epitaffio + (Middle Appenines - Epitaffio)
- Case study:LIFE REWETLAND - A wide-area programme for improving the quality of surface water in the agro pontino by means of natural purification techniques + (Middle Appenines -Rio Martino)
- Case study:River Kennet Restoration at Durnsford + (Middle Kennet (Marlborough to Newbury))
- Case study:Habitat Improvement: Stonebridge River Reserve, Og and Marlborough Fish Migration + (Middle Kennet (Marlborough to Newbury))
- Case study:Eastridge Estate restoration project + (Middle Kennet (Marlborough to Newbury))
- Case study:River Rhee + (Mill River)
- Case study:International recovery of the river Minho: an example of sustainable hydraulic exploitation + (Minho)
- Case study:Minsterley Brook Abandoned Metal Mines + (Minsterley Bk - source to conf Rea Bk)
- Case study:MisbourneRiverAction + (Misbourne)
- Case study:Floodplain recreation on the Montone River at San Tomè (Forlì) + (Montone)
- Case study:Floodplain recreation on the Montone River at the confluence with the Rabbi Stream + (Montone)
- Case study:Recreation of a low-flow sinuous channel in an urban stretch of the Montvaux stream + (Montvaux)
- Case study:Morava restoration project + (Morava)
- Case study:De-culverting Moselle Brook at Lordship Recreation Ground + (Moselle Brook)
- Case study:Moselle Brook - Brook Road + (Moselle Brook)
- Case study:Mulkear Life Project + (Mulkear River)
- Case study:Nine Chalk Rivers Project - Mun Catchment + (Mun)
- Case study:River Mun Community Nature Reserve + (Mun)
- Case study:Biomura LIFE06NAT/SI/000066 + (Mura River)
- Case study:Restoration of Myllypuro brook + (Myllypuro brook)
- Case study:Afon Merin Natural Process Restoration + (Mynach - headwaters to confluence with Rheidol)
- Case study:Černý potok stream restoration scheme + (Müglitz)
- Case study:Restoration of Naarkoski Torrent + (Naarkoski Torrent)
- Case study:Revitalisation of Nagy-Pándzsa watersystem + (Nagy-Pándzsa)
- Case study:Weir demolition in river Nansa, Cantabria + (Nansa)
- Case study:The Pentney Restoration Project + (Nar DS Blackborough Drain)
- Case study:Emmanuel’s Common Reconnection Project + (Nar DS Blackborough Drain)
- Case study:Nar SSSI project + (Nar to confl with Blackborough Drain)
- Case study:West Lexham Rehabilitation Project + (Nar to confl with Blackborough Drain)
- Case study:Castle Acre Rehabilitation Project + (Nar to confl with Blackborough Drain)
- Case study:Narborough Rehabilitation Project + (Nar to confl with Blackborough Drain)
- Case study:River Nar Restoration Project + (Nar to confl with Blackborough Drain)
- Case study:River Nar, Mileham River Restoration Project + (Nar to confl with Blackborough Drain)
- Case study:River Nar Castle Acre Common WEG project + (Nar to confl with Blackborough Drain)