Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:The San Marcos weir removal + (October 1, 2013)
- Case study:River Fugla + (October 31, 2013)
- Case study:Restoration of the rivers connected to the Lake Kitkajärvi + (October 31, 2013)
- Case study:Unit 1b - Long Bridge to Downstream of Louds Mill + (October 31, 2013)
- Case study:Hogsmill River Connectivity Project + (October 31, 2013)
- Case study:River Avon Habitat Enhancement, Fifield + (November 1, 2013)
- Case study:River Wid restoration scheme + (December 1, 2013)
- Case study:Timber float restorations at River Iijoki + (December 31, 2013)
- Case study:Lower Aurino river: Molini di Tures riverbed widening + (December 31, 2013)
- Case study:Chambers Wharf + (December 31, 2013)
- Case study:The Environmental River Enhancement Programme + (December 31, 2013)
- Case study:Restoration of Wandle Park + (December 31, 2013)
- Case study:Newe Fish Pass Improvements project + (December 31, 2013)
- Case study:The Irfon Special Area of Conservation Project + (December 31, 2013)
- Case study:Knepp Rewilding Project + (December 31, 2013)
- Case study:Austria/Slovenia cross-border section - ETZ-Project “DraMurCi” 2009-2013 + (December 31, 2013)
- Case study:Austria cross-border section - River widening measure Gosdorf II (ETZ-Project “DraMurCi” 2009-2013) + (December 31, 2013)
- Case study:Austria cross-border section - River widening Sicheldorf (ETZ-Project “DraMurCi” 2009-2013) + (December 31, 2013)
- Case study:Bocq river (Walphy - LIFE project) + (December 31, 2013)
- Case study:Mulkear Life Project + (January 1, 2014)
- Case study:River Monnow (Going Native) + (January 1, 2014)
- Case study:2e Lower Woodsford River and Floodplain Enhancement + (January 1, 2014)
- Case study:Assessing the habitats outcomes of Floodplain Forest restoration: the case study of the floodplain forest at the Ouse Valley Park + (January 1, 2014)
- Case study:River Mease Waterside Care + (January 1, 2014)
- Case study:Guash Habitat Restoration Project (Phase 1 and 2) + (March 1, 2014)
- Case study:Craigton Riparian and NFM Orchard Planting + (March 8, 2014)
- Case study:Restoring connectivity of the ecological corridor in the Biała River valley + (March 31, 2014)
- Case study:Enler River enhancement project + (April 25, 2014)
- Case study:Houghton 'trout stream' enhancements + (May 1, 2014)
- Case study:Hoffer Brook + (May 1, 2014)
- Case study:Widening and sediment reloading of the Drac riverbed in Saint-Bonneten-Champsaur + (June 1, 2014)
- Case study:Snettisham River Ingol Woody Habitat Project + (June 12, 2014)
- Case study:Kirkstall Valley Weir Fish Passes Project + (June 25, 2014)
- Case study:Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot + (June 30, 2014)
- Case study:River Tat Restoration Scheme + (July 1, 2014)
- Case study:Keent + (July 4, 2014)
- Case study:River Wye Habitat Restoration Project + (July 11, 2014)
- Case study:Cumbria River Restoration Program - Whitbeck restoration project - West Cumbria + (September 1, 2014)
- Case study:Peffery Project Phase 3 + (September 1, 2014)
- Case study:Ouzel habitat improvement + (September 10, 2014)
- Case study:Robledo de Chavela dam removal + (September 29, 2014)
- Case study:SEE River Project + (October 1, 2014)
- Case study:Urban River Enhancement Scheme (URES) in Burnley + (October 1, 2014)
- Case study:Glaisdale Beck diversion scheme + (October 1, 2014)
- Case study:Enhancement of the River Crouch following a pollution incident + (October 10, 2014)
- Case study:River Nar Restoration Project + (October 31, 2014)
- Case study:Re-Engaging Children With Rivers (REACH) + (October 31, 2014)
- Case study:River restoration on the River Brett at Shelley + (November 14, 2014)
- Case study:Emmanuel’s Common Reconnection Project + (November 14, 2014)
- Case study:Rehabilitation of the River Brett at Shelley, Suffolk + (November 21, 2014)
- Case study:LIFE08NAT/IT/000352 CRAINat + (December 31, 2014)