Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Restoration of the Erft-river in Weilerswist + (December 31, 2009)
- Case study:Wandsworth Riverside Quarter + (December 31, 2009)
- Case study:Effacement partiel du seuil Cros sur la Dunière + (December 31, 2009)
- Case study:Splash + (March 31, 2010)
- Case study:Bastion Maria (QUERCUS) + (May 29, 2010)
- Case study:Rétablissement de la continuité écologique sur la Luire + (June 30, 2010)
- Case study:Effacement du seuil de Chelles Basse sur le Miodet + (July 31, 2010)
- Case study:Elimination of a pond along the Erve River and conservation of the historical heritage in Sainte-Suzanne-et-Chammes + (August 31, 2010)
- Case study:Mains of Dyce + (September 1, 2010)
- Case study:Removal of the Brosses weir on the Soanan River + (September 30, 2010)
- Case study:Lowering the weir of the Houël mill on the Leff River + (September 30, 2010)
- Case study:River Wensum Rehabilitation Project - Bintree + (October 1, 2010)
- Case study:Butter Hill Phase 2 + (October 31, 2010)
- Case study:Removal of the Ver mill weir on the Sienne River + (October 31, 2010)
- Case study:River Bure + (November 1, 2010)
- Case study:Odder Stream Restoration + (November 1, 2010)
- Case study:Černý potok stream restoration scheme + (November 30, 2010)
- Case study:LARA (Lugg and River Arrow) + (November 30, 2010)
- Case study:Sågarsfors + (December 31, 2010)
- Case study:Meander reinstatement on the River Wensum at the Ryburgh Loop + (December 31, 2010)
- Case study:River Aggregate Sustainability Project (RASP) + (December 31, 2010)
- Case study:Small Retention - Big Deal, A National Program on Natural Small Water Retention Measures + (December 31, 2010)
- Case study:Shaping and protecting water-mud biotopes in Garwolin Forest division through development of small retention + (December 31, 2010)
- Case study:River Restoration at Hunworth (River Glaven) + (January 1, 2011)
- Case study:Tungelroyse beek + (January 1, 2011)
- Case study:Knock Burn low flow channel + (January 25, 2011)
- Case study:Conservation strategies for forest and wild river in Gesaeuse: the River Enns restoration + (February 1, 2011)
- Case study:Démantèlement de l’ouvrage du Pont Fourneau sur la Selle + (February 28, 2011)
- Case study:Loutre BeLu: Restoration of European otter habitats (Belgium & Luxemburg) + (March 1, 2011)
- Case study:West Lexham Rehabilitation Project + (March 4, 2011)
- Case study:Retour dans son talweg d’origine de la Souffel à Reichstett et création de mares + (March 31, 2011)
- Case study:Reméandrage de la Veyre en amont du lac d’Aydat + (April 30, 2011)
- Case study:River Somer channel enhancement, Midsomer Norton + (May 31, 2011)
- Case study:Returning the Fontenelle to its original bed at Saint-Wandrille-Rançon + (June 1, 2011)
- Case study:River Stour at Glen's weir (Throop fisheries) + (August 1, 2011)
- Case study:Conservation strategies for forest and wild river in Gesaeuse: the Johnsbach Beck restoration + (August 1, 2011)
- Case study:Massadammen-dam removal in River Tabergsån + (October 31, 2011)
- Case study:Mayesbrook Climate Change Park restoration project + (October 31, 2011)
- Case study:Restauration du matelas alluvial du ruisseau de Trémeret à Ambon + (October 31, 2011)
- Case study:Effacement du seuil du Moulin d’Hatrize sur l’Orne + (October 31, 2011)
- Case study:Abbey Brook Weir + (November 1, 2011)
- Case study:Effacement du seuil de Carayon sur le Thoré + (November 30, 2011)
- Case study:Drayton + (December 1, 2011)
- Case study:Environment-friendly Reduction of Flood Risk in the Multi-thread Reach of the Czarny Dunajec River + (December 1, 2011)
- Case study:Reactivating river dynamics in the Vieux-Rhône River (non-navigable section) at Cornas, Roubion and Petite Île + (December 1, 2011)
- Case study:Bio-engineering techniques for bank protection on the Moselle River in Villey-le-Sec + (December 1, 2011)
- Case study:Barnes Common improvements + (December 20, 2011)
- Case study:Lullingstone Castle + (December 31, 2011)
- Case study:NERETVA RIVER CORRIDOR – TWO CASE STUDIES OF ECOSYSTEM SERVICES VALUATIONS + (December 31, 2011)
- Case study:Herefordshire Asset Restoration Project (HARP) + (December 31, 2011)
- Case study:Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas + (December 31, 2011)