Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Idle Hallcroft (Tiln) Weir Fish Pass + (July 1, 2015)
- Case study:Grovelands Park Wetlands + (July 10, 2015)
- Case study:Twineham Weir Removal & In-channel Enhancements + (September 15, 2015)
- Case study:River Leith Restoration Project, Thrimby, Penrith, Cumbria + (November 2, 2015)
- Case study:Room for the River + (December 31, 2015)
- Case study:Rheinauen bei Rastatt + (December 31, 2015)
- Case study:Amerongse Bovenpolder + (December 31, 2015)
- Case study:Sherborne Windrush Restoration Project + (December 31, 2015)
- Case study:Habitat restoration of the Kleine Net Valley + (December 31, 2015)
- Case study:Ontpoldering Noordwaard + (December 31, 2015)
- Case study:Wye (Herefordshire) Improvement Project (WHIP2) + (December 31, 2015)
- Case study:Création d’un bras de contournement de plusieurs étangs sur le Fliez et restauration du marais de Contes + (December 31, 2015)
- Case study:Inturia dam removal + (January 1, 2016)
- Case study:Nursery habitat for the freshwater pearl mussel in Haukåsvassdraget + (January 1, 2016)
- Case study:Teglverksdammen + (January 1, 2016)
- Case study:River Stour Habitat Enhancements at Great and Little Bradley + (February 1, 2016)
- Case study:Bourne End Recreation Ground River Enhancement Project + (February 24, 2016)
- Case study:The Pentney Restoration Project + (March 31, 2016)
- Case study:Alma Road Rain Gardens + (March 31, 2016)
- Case study:Stony Stratford Sluices Bypass Channel + (March 31, 2016)
- Case study:Glaisdale Beck Restoration Project + (May 31, 2016)
- Case study:Salmonid, coarse fish and wetland bird habitat and flood plain linkage project, Hampshire Avon + (May 31, 2016)
- Case study:Wyre Riparian Restoration Initiative + (May 31, 2016)
- Case study:Restoration of dry riverbeds in Røssåga in conjunction with relocation of power plant outlets + (July 26, 2016)
- Case study:East Devon Diffuse Pollution Project + (August 1, 2016)
- Case study:Marine Colliery river blockage + (September 14, 2016)
- Case study:Swindale Beck Restoration + (September 23, 2016)
- Case study:Bidasoa Dam removal 2 + (October 4, 2016)
- Case study:River Glyme Stratford Restoration + (November 30, 2016)
- Case study:The Upper Raba River Spawning Grounds + (December 1, 2016)
- Case study:Pearls in Peril LIFE+ GB Project + (December 31, 2016)
- Case study:Sir Maesyfed Salar 2012 (SMS 12) + (December 31, 2016)
- Case study:Habitat improvement measures in Bortneelva + (January 1, 2017)
- Case study:Austria Upper Mur - LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-2015 + (February 1, 2017)
- Case study:Pearls in Peril LIFE+ GB Project - River Dee + (March 2, 2017)
- Case study:River Eye + (March 20, 2017)
- Case study:Dunston Beck Restoration + (March 29, 2017)
- Case study:Markeaton and Mackworth Brook (MMB) Project + (March 31, 2017)
- Case study:Castle Irwell Urban Wetland + (July 10, 2017)
- Case study:LIFE Segura Riverlink (Through rivers) + (July 30, 2017)
- Case study:Southington River Restoration Project + (December 21, 2017)
- Case study:Soaring connections: restoring people, wildlife & place + (December 31, 2017)
- Case study:Gilev's Grove reconstruction + (December 31, 2017)
- Case study:LIFE Charcos - Conservação de Charcos Temporários na Costa Sudoeste de Portugal (Conservation of Med Temporary Ponds in SW Portugal) + (December 31, 2017)
- Case study:Habitat measures in Strynevassdraget + (January 1, 2018)
- Case study:Upper River Nairn restoration project + (April 1, 2018)
- Case study:Forest Halt, Saltburn Valley Gardens + (September 4, 2018)
- Case study:Reopening the River Roch in Rochdale and Reducing Flood Risk + (January 1, 2019)
- Case study:TerraSeixe + (February 28, 2019)
- Case study:Transboundary Management Programme for the planned 5-country Biosphere Reserve “Mura-Drava-Danube” - COOP MDD + (June 30, 2019)
- Case study:Ennerdale Mill Weir Removal + (July 31, 2019)