Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Dam removal at Grönkullen, River Rolfsån + (October 31, 2005)
- Case study:Clugston Burn (CASS) + (December 31, 2005)
- Case study:Lower River Roding Regeneration Project + (March 31, 2006)
- Case study:Barking Creekmouth + (March 31, 2006)
- Case study:Barking Creek near A13 + (March 31, 2006)
- Case study:Cuckolds Haven Nature Area + (March 31, 2006)
- Case study:Mill Pool + (March 31, 2006)
- Case study:River Hogsmill Restoration Project + (July 20, 2006)
- Case study:River Alt at Knowsley + (October 1, 2006)
- Case study:Toce River: conservation of riparian habitats for breeding and migratory birds - LIFE02 NAT/IT/008572 + (December 31, 2006)
- Case study:Holmsley Inclosure Stream Restoration + (December 31, 2006)
- Case study:Markway Stream Restoration + (December 31, 2006)
- Case study:Reopening of the culverted Redon river + (January 1, 2007)
- Case study:Babingley River at Hillington + (February 1, 2007)
- Case study:Rural Enterprise Scheme + (April 1, 2007)
- Case study:Austria Upper Mur - LIFE III (LIFE03 NAT/A/000011) „Inner-Alpine river basin management – Upper River Mur - murerleben I" 2003-2007 + (July 31, 2007)
- Case study:Natura 2000conservation in Alta Tuscia Viterbese LIFE04 NAT/IT/000153 + (August 31, 2007)
- Case study:Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze + (August 31, 2007)
- Case study:Effacement partiel du seuil de Vas sur le Céans + (October 31, 2007)
- Case study:Cornmill Gardens (QUERCUS) + (December 31, 2007)
- Case study:The Lugg & Arrow, Leader + + (December 31, 2007)
- Case study:UP! - The Usk Project + (December 31, 2007)
- Case study:Austria cross-border section - River widening measure Gosdorf I (Interreg IIIa Project "Maßnahmen Unteres Murtal" 2002-2007) + (December 31, 2007)
- Case study:Lower Aurino river: San Giorgio di Brunico riverbed widening + (January 31, 2008)
- Case study:Kvarnekulla nature like bypass channel at River Knipån + (February 1, 2008)
- Case study:QUERCUS Dee + (March 1, 2008)
- Case study:Reopening side channels along the Saône in Jassans-Riottier + (April 1, 2008)
- Case study:Lugg & Arrow, Radnorshire + (June 1, 2008)
- Case study:Restoration and fish migration enhancement in the Wachau Valley + (June 30, 2008)
- Case study:PHish - Powys Habitat Improvement Scheme + (June 30, 2008)
- Case study:Case study:Biological protection shield to control streambank erosion in Ätran 2 + (August 31, 2008)
- Case study:Restauration du matelas alluvial de la Clouère par recharge granulométrique + (August 31, 2008)
- Case study:QUERCUS Ravensbourne + (September 1, 2008)
- Case study:Restoration of Ilabekken brook + (September 1, 2008)
- Case study:River Valency at Boscastle + (September 1, 2008)
- Case study:Burn of Mosset, Forres + (December 31, 2008)
- Case study:Austria/Slovenia cross-border section - Interreg IIIa Project "Maßnahmen Unteres Murtal" 2003-2008 + (December 31, 2008)
- Case study:Marsh protection in Egyek–Pusztakócs + (December 31, 2008)
- Case study:Arasement du vannage du moulin de Réveillon et réaménagement du lit mineur de la Blaise + (December 31, 2008)
- Case study:Réduction de l’impact de trois étangs sur cours d’eau dans le bassin du Cousin + (December 31, 2008)
- Case study:Scolo Desolino restoration project + (January 1, 2009)
- Case study:Martins River Island + (January 1, 2009)
- Case study:Rio Sant'Ambrogio restoration project + (March 1, 2009)
- Case study:Démantèlement de neuf ouvrages sur le cours de l’Aa + (September 30, 2009)
- Case study:Salzano wetland and Marzenego river restoration project + (October 1, 2009)
- Case study:Arasement du seuil des Treize Saules sur la Quilienne + (October 31, 2009)
- Case study:Highland Water at Warwickslade Lawn + (November 1, 2009)
- Case study:Effacement partiel de 14 seuils sur le Mutterbach et l’Hosterbach à Holving et Hoste + (November 30, 2009)
- Case study:Effacement partiel de cinq seuils sur le ruisseau du Bagas + (November 30, 2009)
- Case study:Apelnäs fishway at River Rolfså + (December 31, 2009)
- Case study:Restoration of the Erft-river in Weilerswist + (December 31, 2009)