Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Herefordshire Asset Restoration Project (HARP) + (December 31, 2011)
- Case study:Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas + (December 31, 2011)
- Case study:London Olympics Parklands + (January 1, 2012)
- Case study:River Wandle: Butter Hill Phase 3 + (January 1, 2012)
- Case study:Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras + (January 1, 2012)
- Case study:Restoration of the lowland river system Grote Nete + (March 31, 2012)
- Case study:Mill house private hydroelectric power generation scheme and fish pass + (April 1, 2012)
- Case study:Manor Park + (April 28, 2012)
- Case study:River Pool Linear Park Enhacement + (May 31, 2012)
- Case study:Lodge Burn cascade fish pass and culvert bed restoration (as part of the Lodge Burn FAS) + (May 31, 2012)
- Case study:Lodge Burn Flood Alleviation Scheme + (July 1, 2012)
- Case study:Albbruck-Dogern (bypass and nature-like pool pass) + (July 1, 2012)
- Case study:Braid Burn at Inch Park + (August 1, 2012)
- Case study:European Fisheries Fund + (August 1, 2012)
- Case study:March Burn at Riding Mill + (August 31, 2012)
- Case study:River Nith Diversion at Greenburn Surface Mine + (August 31, 2012)
- Case study:Hedleyhope Burn + (September 1, 2012)
- Case study:Borrowash fish pass + (September 21, 2012)
- Case study:Abaissement et démantèlement de trois clapets sur l’Orge aval + (September 30, 2012)
- Case study:Effacement du seuil du moulin du Bourg sur le Vicoin + (October 31, 2012)
- Case study:River Wandle Restoration Project + (December 1, 2012)
- Case study:Gunville Phase I + (December 13, 2012)
- Case study:Reméandration du Geer à Grand-Axhe + (December 31, 2012)
- Case study:Restoring sea-trout and salmon habitat in Aurlandselva + (December 31, 2012)
- Case study:Project Usk River Restoration (PURR) 2011-2012 + (December 31, 2012)
- Case study:River Ouse at Sharpsbridge Rock Ramp Fish Easement Project + (December 31, 2012)
- Case study:Reconstitution du matelas alluvial de la Vesgre à Houdan + (December 31, 2012)
- Case study:Tanners Brook + (January 1, 2013)
- Case study:Longstreet A 91a + (January 1, 2013)
- Case study:Austria cross-border section - Monitoring sediment transport and Habitat modelling (ETZ-Project “DraMurCi” 2009-2013) + (January 1, 2013)
- Case study:Restoration of spawning grounds for trout in Bjornesfjorden (Hardangervidda) + (January 1, 2013)
- Case study:Off-Channels Restauration + (January 15, 2013)
- Case study:Hadfield Weir Fish Pass + (February 11, 2013)
- Case study:Eddleston water + (May 1, 2013)
- Case study:Septic Tank Survey in the Clun Forest + (May 1, 2013)
- Case study:Creation of spawning ground for Baltic salmon, anadromous brown trout and river lamprey at Veneküla rapid, river Pirita + (September 30, 2013)
- Case study:France Farm (Phase 1) A 9 + (October 1, 2013)
- Case study:Medmerry Managed Realignment Scheme + (October 1, 2013)
- Case study:Eastridge Estate restoration project + (October 1, 2013)
- Case study:The San Marcos weir removal + (October 1, 2013)
- Case study:River Fugla + (October 31, 2013)
- Case study:Restoration of the rivers connected to the Lake Kitkajärvi + (October 31, 2013)
- Case study:Unit 1b - Long Bridge to Downstream of Louds Mill + (October 31, 2013)
- Case study:Hogsmill River Connectivity Project + (October 31, 2013)
- Case study:River Avon Habitat Enhancement, Fifield + (November 1, 2013)
- Case study:River Wid restoration scheme + (December 1, 2013)
- Case study:Timber float restorations at River Iijoki + (December 31, 2013)
- Case study:Lower Aurino river: Molini di Tures riverbed widening + (December 31, 2013)
- Case study:Chambers Wharf + (December 31, 2013)
- Case study:The Environmental River Enhancement Programme + (December 31, 2013)
- Case study:Restoration of Wandle Park + (December 31, 2013)
- Case study:Newe Fish Pass Improvements project + (December 31, 2013)
- Case study:The Irfon Special Area of Conservation Project + (December 31, 2013)
- Case study:Knepp Rewilding Project + (December 31, 2013)