Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Floodplain recreation on the Montone River at San Tomè (Forlì) + (12271)
- Case study:Quaggy channel improvements + (1229)
- Case study:Floodplain recreation on the Montone River at the confluence with the Rabbi Stream + (12296)
- Case study:Restoration of the original riverbed of the Steinbaechlein + (12313)
- Case study:More space for the river Orbigo + (12366)
- Case study:Habitat Management and Raptor Conservation in Nestos Delta and Gorge - LIFE02 NAT/GR/008489 + (12369)
- Case study:Removal of the Retuerta dam in the Aravalle river: + (12370)
- Case study:Unit 1b - Long Bridge to Downstream of Louds Mill + (12395)
- Case study:River Frome Rehabilitation Plan + (12396)
- Case study:Unit 3a – Hurst Bridge 2013 + (12399)
- Case study:Unit 4 - North Channel Phase 1 + (12400)
- Case study:Strategic Framework for Restoration of the River Avon (SFfRRA) + (12401)
- Case study:Charlton St Peter A 8 + (12402)
- Case study:France Farm (Phase 1) A 9 + (12403)
- Case study:Longstreet A 91a + (12404)
- Case study:Day Brook Rain Gardens + (12411)
- Case study:River of Life + (12425)
- Case study:River Nene Nature Improvement Area + (12442)
- Case study:Wensum River Restoration and Floodplain Enhancement + (12450)
- Case study:Sculthorpe Moor Restoration Scheme + (12461)
- Case study:Great Ryburgh End Restoration Scheme + (12469)
- Case study:Pearls in Peril LIFE+ GB Project + (12473)
- Case study:Newe Fish Pass Improvements project + (12475)
- Case study:Bow Brook Living Landscape + (12485)
- Case study:QUERCUS Ravensbourne + (12488)
- Case study:QUERCUS Dee + (12494)
- Case study:Bastion Maria (QUERCUS) + (12496)
- Case study:River Tame in Perry Hall playing fields ("SMURF") + (12499)
- Case study:River Tame at Salford Park ("SMURF") + (12501)
- Case study:Holnicote multi-objective flood risk management demonstration project + (12506)
- Case study:SMURF Tame + (12507)
- Case study:Holmsley Inclosure Stream Restoration + (12511)
- Case study:Improving the Conservation Status of Freshwater Pearl Mussel Targeting the Clun SAC and Upstream Waters + (12513)
- Case study:Markway Stream Restoration + (12515)
- Case study:Clugston Burn (CASS) + (12519)
- Case study:South Calder Water deculverting and habitat restoration + (12531)
- Case study:Trees on the River Uck + (12556)
- Case study:Day Brook Restoration - Gedling + (12567)
- Case study:Babbs Mill reed bed + (12573)
- Case study:Platt Brook Restoration + (12575)
- Case study:Goshen Weir removal project, River Roch, Bury + (12579)
- Case study:The Middle Ouse Restoration of Physical Habitats (MORPH) + (12584)
- Case study:River Tat Restoration Scheme + (12588)
- Case study:River Worfe Restoration Initiative + (12592)
- Case study:Queensbury Recreation Ground + (12609)
- Case study:Boston Manor + (12610)
- Case study:Crane Park + (12611)
- Case study:Thames Lock Weir, Brentford eel pass + (12612)
- Case study:Amwell Loop + (12613)
- Case study:Hollyoak Wood and Willersley Park + (12614)
- Case study:Lea Bridge Waterway Wall Improvements + (12615)