Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Measures values" with value "sluice gate removal,, ,,,". Since there have been only a few results, also nearby values are displayed.

Showing below up to 4 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • Case study:Bowston Weir Removal  + (removal of dams, Rock ramp construction,,,Channel naturalisation, ,,Engagement with a wide range of stakeholders,,)
  • Case study:Restoration of the river continuity on the Touques Basin  + (removal of sluices, removal of dams, Creation of fish passes, Weir removal, Weir lowering,,, ,,,)
  • Case study:Letting the Dove Flow 2  + (removing or breaching weirs and reinforcemremoving or breaching weirs and reinforcements, Allowing stone weirs and bank reinforcements to break down, Removal of bank reinforcements,,Improvement of natural flows, Improve longitudinal connectivity, Introducing large woody debris, r,Channel naturalisation, Improvement of channel morphology, Removal of impoundments, ,Monitoring strategy,,Awareness raising, Engagement with a wide range of stakeholders, Improved leisure environment for angling and recreation,,e environment for angling and recreation,,)
  • Case study:Barking Creek near A13  + (retreat and renewal of folld defences, construction of new intertidal area,New footpaths, sand martin nesting tubes, ,,Wheelchair access,)