Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Butter Hill Phase 2 + (Weir notched, Bank reprofiling, Introduction of gravel, Introducing large woody debris, Planting of native species,,Large scale planting of native species,,Channel narrowing, ,,Community consultation, Community Events,,)
- Case study:BALLYMONEY RIVERSIDE PARK RESTORATION PROJECT + (Weir removal, Addition of substrate and in … Weir removal, Addition of substrate and in channel features, Alteration in channel dimensions, Weir removal,,Creation of wetland, Creation of ponds and scrapes,,Diversification of in-channel features, Meandering channel, ,management of wetland by council (new area of work),Community Education, Public amenity and perception, Education, Public amenity and perception,)
- Case study:Removal of the Coupeau impoundment on Vicoin River and riverbed restoration + (Weir removal, Barrier removal, Riverbed restoration,,Creation of wetland,,Creation of new channel, construction of recreational facilities (trails and footbridges),,,)
- Case study:Twineham Weir Removal & In-channel Enhancements + (Weir removal, Creation of backwaters, Habitat restoration, Creation of berms, Gravel augmentation,,Tree planting,,Adding sinuosity, Enhancing flow diversity, ,,Volunteer engagement,)
- Case study:River Somer channel enhancement, Midsomer Norton + (Weir removal, Creation of berms, Bed raisi … Weir removal, Creation of berms, Bed raising, Planting of native species, Removal of sediment,,,Channel naturalisation, Meandering channel, ,management of litter, management of undesirable plant species,creation of River Somer Management Team, fundraising,Participation in maintenance, Participation in works,on in maintenance, Participation in works,)
- Case study:Removal of the Ver mill weir on the Sienne River + (Weir removal, Creation of groynes,,Maintenance of riparian vegetation, Restoration of pond, ,,,)
- Case study:Welland for People and Wildlife Project + (Weir removal, Creation of low flow channel … Weir removal, Creation of low flow channel, Creation of pools, Creation of berms, Introduction of gravel, Marginal planting,,Creation of two stage channel, Create riffle/pool,,Meandering channel, Reconnection of cutoff meander, ,Planting wildflower mixes,Community Events, River open days, School Tours, Community involvement, Engagement with schools, Awareness raising,,Community engagement, Information board erectednity engagement, Information board erected)
- Case study:Irpin river restoration + (Weir removal, Dam removal,,, ,landuse changes,,cooperation with local or regional investors)
- Case study:Hogsmill River Connectivity Project + (Weir removal, Deculverting, Weir modification,,, ,,Community involvement,)
- Case study:River Adur - Shipley weir removal + (Weir removal, Deculverting, Weir modification,,, ,,,)
- Case study:Vén-Duna (Old-Danube) sidearm’s revitalization + (Weir removal, Dredging,Construction of new sluices, ,Ensuring biodiversity,Recreation,Information provision,Consultation)
- Case study:Wandle River Restoration Project: Hackbridge + (Weir removal, Habitat diversification,,Marginal wetland berms created,Increase in-channel hydromorphological diversity, ,,Community involvement, Aesthetics,,)
- Case study:Weir Road + (Weir removal, Introduction of gravel,,Habitat creation,Creation of pools and riffles ,,,)
- Case study:Removal of a pond weir in a tributary of Petersbach + (Weir removal, Pond drainage,, ,,,)
- Case study:Wummewiesen restoration project + (Weir removal, Removal of rip-rap, Bank reprofiling,,Extensive planting, Vegetation management, Increase water retention area,,Creation of new river arm, Creation of fish passes, ,,Land purchase,)
- Case study:Restoring sea-trout and salmon habitat in Aurlandselva + (Weir removal, Reopening of side channels, Creation of fish passes, Introduction of spawning gravels,,, ,,,)
- Case study:West End Brook - weir removal and track management + (Weir removal, Weir modification, Culvert modification,diversion of flow into surrounding wet woodland,Introducing large woody debris, Habitat creation, Creation of fish refuge areas ,,,)
- Case study:Tolka Valley Park at Finglas + (Weir removal, Weir modification,,, ,,Increased number of facilities,)
- Case study:Healthy Rivers + (Weir removal, Weir modification,,Barrier removal, Habitat creation,, ,Walkover surveys and water sample data collection, Monitoring strategy,,Community involvement, Community Education,,)
- Case study:Kentchurch Weir Removal + (Weir removal, Weir modification,,Improving fish migration,, ,,,)
- Case study:Demolition of weir on the River Nora, Nalón Basin + (Weir removal,, ,,,)
- Case study:Removal of the Cussy weir on the Maria stream + (Weir removal,, ,,,)
- Case study:Manor House Gardens Gauging Station + (Weir removal,, ,,,)
- Case study:EDF Weir removal + (Weir removal,, ,,,)
- Case study:Mill Road Weir + (Weir removal,, ,,,)
- Case study:Horne Way Weir + (Weir removal,, ,,,)
- Case study:Weir removal at Tile Kiln Park + (Weir removal,, ,,,)
- Case study:Ennerdale Mill Weir Removal + (Weir removal,, ,,,)
- Case study:Weir demolition in river Nansa, Cantabria + (Weir removal,,, ,,,)
- Case study:Clayton Vale + (Weir removal,,, ,,,)
- Case study:Creamery Weir fish barrier easement + (Weir removal,,, ,,,)
- Case study:River Bulbourne at Boxmoor Weir Removal + (Weir removal,,, ,,,)
- Case study:Lower Darwen Weir Removal + (Weir removal,,, ,,,)
- Case study:Removal of Carleton Hall weir, Eamont Bridge, Penrith, Cumbria + (Weir removal,,, ,,,)
- Case study:Removing Sheepmount weir, River Caldew, Carlisle, Cumbria + (Weir removal,,, ,,,)
- Case study:River Trent, Bucknall Park + (Weir removal,,, ,,Partnerships,,)
- Case study:Removal of the Brosses weir on the Soanan River + (Weir removal,,, ,Rescue fishing campaign, temporary diversion of river,,)
- Case study:Fluvial longitudinal continuity recovery in river Aguanaz, Cantabria, Spain + (Weir removal,,, Improvement of local paths and river banks,,,)
- Case study:Refilling the meanders of the Colostre + (Weir removal,,Removal of poplars in old meanders,Re-meandering ,,Agreement with the owners,Public meeting,River contract)
- Case study:Biodiversity conservation and recovery in the river basin Asón + (Weir removal,Removal of exotic plants,, ,Management for increase species like Lepus europaeus, Capreolus capreolus, Columba palumbus andAguila chrysaetos,Surveillance patrols managed fire risk and hunting,Interpretive centre was set up)
- Case study:Mulkear Life Project + (Weir removal/modification for easement of fish passage, Cattle drinkers,,Protect/restore riparian zone, Removal of exotic plants, Replacement of conifers with deciduous woodland,, Best practice for river habitat restoration,,Community Education,,)
- Case study:Strategic Framework for Restoration of the River Avon (SFfRRA) + (Weir removal/modification for easement of … Weir removal/modification for easement of fish passage, Bed raising, Creation of berms, Embankment lowering,,Fencing, Tree planting,,Re-meandering, Channel narrowing, Introducing large woody debris, Adding sinuosity, Enhancing flow diversity, Re-instatement of old course, ,,,versity, Re-instatement of old course, ,,,)
- Case study:River Irwell Restoration Project + (Weir removal/modification for easement of fish passage, Bank reprofiling,,, ,,,)
- Case study:Burton Weir (Upper) Fish Pass Project + (Weir removal/modification for easement of fish passage,,, ,,,)
- Case study:Newe Fish Pass Improvements project + (Weir removal/modification for easement of fish passage,,, ,,,)
- Case study:Goshen Weir removal project, River Roch, Bury + (Weir removal/modification for easement of fish passage,,, ,,,)
- Case study:Pearls in Peril LIFE+ GB Project - River Ehen + (Willow spiling, Bank reprofiling,,Tree planting, Livestock fencing,, ,,Engagement with a wide range of stakeholders, Volunteer engagement,,)
- Case study:Remeandering of the Drugeon and integrated management of its catchment + (adding roughness,,,Re-meandering, Reconnection of cutoff meander, ,,,)
- Case study:Gilev's Grove reconstruction + (banks strengthening with geotextile and vi … banks strengthening with geotextile and villow plantening,gabions constructions close to the bridge,Meandering channel two new bridges were constructed over a brook,,sport facilities, educational path along the stream, barbeque places, rent of sporting stuff and accessuaries,, rent of sporting stuff and accessuaries,)
- Case study:Little Ponton + (brushwood mattress installation, Hinged Trees, Log Flow Deflectors and Vanes.,, ,Improved stock fencing and ford refurbishment.,,)
- Case study:Černý potok stream restoration scheme + (construction of nearly completly new strea … construction of nearly completly new streambeds and directing water freely to the alluvial meadows,Creation of pond,Channel naturalisation, Recovering natural landscapes,,Management of vegetation, More natural water retention, Monitoring strategy,,,popularization of the project,rategy,,,popularization of the project,)
- Case study:Lower River Roding Regeneration Project + (construction of new intertidal area,,, ,,Improved public access, Information panels for people,,)
- Case study:Mill Pool + (creation of intertidal terraces,,, ,,Redesign of riverside seating area to improve outlook and convey information about historic importance of the Mill Pool.,worked with local authrotiy and local artist on the designs of the area)
- Case study:Lower Aurino river: Gatzaue riverbed widening + (creation of new branches,Floodplain reconnection,Creation of new channel, Channel widening, Fish habitat restoration,,,Citizen participation in the restoration project,,)
- Case study:The River Deerness Project + (creation of rock pools downstream of culve … creation of rock pools downstream of culvert,,,Remove obstacles in the riverbed, Removing barriers to water organisms migration in the river ,,,Establishment of partnership working and joint delivery to be extended under the auspices of the Wear Catchment Management Plan.ces of the Wear Catchment Management Plan.)
- Case study:Hedleyhope Burn + (creation of rock pools downstream of culvert,, ,,,)
- Case study:Bakenhof Dyke reconstruction + (creation of secondary channel,Creation of backwaters,, ,,,)