Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Wimbledon Common + (Toeboard removal,, ,,Improved public access, Community Education,,)
- Case study:Voorste Nete at Dessel + (Translocation of original substrate into new channel, Alteration in channel dimensions,,Channel naturalisation, Meandering channel, ,Weed clearance,,)
- Case study:Grantham Blue Green - Urban Reach + (Tree Hinging adding gravel, berm creation, daylighting.,, Urban wetlands and wildflower meadows,,Big engagement programme with local community.,)
- Case study:River Witham Great Ponton + (Tree Hinging, Faggot Mattresses, Flow Deflectors,Fencing, cattle access points,Weir Bypass, new meandering channel planform ,,,)
- Case study:Papermill Weir Section in-channel restoration + (Tree hinging and adding gravel.,, ,,,)
- Case study:Aubourn Rock Ramp and Habitat Works + (Tree hinging over long section and large rock ramp installation to replace existing large weir that was a barrier to fish passage.,, ,,,)
- Case study:Westborough + (Tree hinging work over long section of Witham.,, ,,,)
- Case study:Colne Water Restoration Project + (Tree planting, Bank stabilisation,,,Removing barriers to water organisms migration in the river ,,Awareness raising,,Practical volunteering activities like river clean-ups, Wildlife surveys, Public consultation, Survey work,)
- Case study:Source to Sea Programme – 3. Upper Wenning Restoration + (Tree planting, Barrier removal,,Fencing of riparian zone, Riparian planting,, ,,Media,,Practical volunteering activities, Community engagement,)
- Case study:River Tame at Salford Park ("SMURF") + (Tree planting,, ,,,)
- Case study:Source to Sea Programme – 4. River Kent tributaries + (Tree planting,,Fencing of riparian zone, Riparian planting,, ,,Awareness raising, Media,,Practical volunteering activities like beach cleans, Public consultation,)
- Case study:Limestone Ribble Restoration Project + (Tree planting,Barrier removal, The blocking of certain grips, ,,,)
- Case study:Source to Sea Programme – 1. Leighton Moss Resource Protection + (Tree planting,Creation of wetland, Barrier removal,, Agricultural/Farming improvements,,Farm advice and plans,,,Engagement activities will include face-to-face contact.)
- Case study:Diffusing the Issue in Rural Ribble - River Loud + (Tree planting,Improving fish migration, ,,,)
- Case study:Project Usk River Restoration (PURR) 2012-2013 + (Tree removal, Creation of fish passes,,, ,,,)
- Case study:Syston and Barkston Restoration + (Tree works including hinging and daylighting, creation of log fronted and faggot mattresses, installation of flow deflectors and vanes.,, ,,,)
- Case study:Upper Witham Restoration + (Various in-channel measures e.g brushwood berms, tree hinging,,Bed raising, floodplain lowering and floodplain roughening.,Weir Bypass and removal ,Changes to floodplain management practice,Community engagement and education e,g River School.,)
- Case study:Dove Weir removal + (Vegetation cut back, Weir removal,,Cut back of trees, Introducing large woody debris,,Adding sinuosity, ,,Information for the public,,)
- Case study:Beekherstel Buurserbeek + (Vergraven van de oever,Dood hout inbreng,, ,,,)
- Case study:Upper River Witham : Easton + (Weir Removal, Berms, Flow Deflectors, Tree Hinging,Fencing, ,,,)
- Case study:LIFE 06 NAT/SLO/000069 Intermittent Lake Cerknica + (Weir construction, Bank reprofiling,,Local … Weir construction, Bank reprofiling,,Local deepening, Coves and bays construction, Construction of the overflows between individual meanders,Re-instatement of old course, Creation of backwater, ,late mowing and mulching on the permanently protected land,mapping of habitat types,Student Education,,popularization of the project,Information provision,n of the project,Information provision,)
- Case study:Lowering the weir of the Houël mill on the Leff River + (Weir lowering, Spreading of debris,Trimming of trees, ,,Awareness raising by a sign, Production of a video, Organisation of visits to the sites,)
- Case study:Partial removal of weir on the Sanguèze at Mouzillon + (Weir lowering,,,Topographic and landscape restoration, ,,,)
- Case study:Partial removal of weir on the Thouet at Le Tallud + (Weir lowering,,,allowing hydromorphological diversification upstream in the previously impounded stretch ,,,)
- Case study:Beddington Park Enhancements + (Weir modification, Weir notched, Bank reprofiling,,Tree planting,,Channel narrowing, Cleaning of spawning gravels, Reedbed creation, ,,,)
- Case study:Mill Road Weir, Pontypool + (Weir modification,, ,,,)
- Case study:Thames Lock Weir, Brentford eel pass + (Weir modification,,, ,,,)
- Case study:Osterley Weir, Hanwell eel pass + (Weir modification,,, ,,,)
- Case study:Eel Pass over tilting weir at Ravensbury Park + (Weir modification,,, ,,,)
- Case study:Lugton Water Fish Barrier Easement + (Weir modification,,, ,,,)
- Case study:Water of Dye Fish Pass Project + (Weir modification,,, Creation of fish passes,,,,)
- Case study:Poulter Park Lake Eel Pass + (Weir modification,,,Creation of backwater ,,,)
- Case study:River Wandle: Butter Hill Phase 1 + (Weir modification,,,Creation of fish passes, ,,,)
- Case study:Bell Green Weir fish passage + (Weir modification,,Improving fish migration,, ,,,)
- Case study:Avon Barriers Project + (Weir modification,,Improving fish migration,, ,,,)
- Case study:Avon Barriers Project: Ferengair Weir + (Weir modification,,Improving fish migration,, ,,,)
- Case study:Butter Hill Phase 2 + (Weir notched, Bank reprofiling, Introduction of gravel, Introducing large woody debris, Planting of native species,,Large scale planting of native species,,Channel narrowing, ,,Community consultation, Community Events,,)
- Case study:BALLYMONEY RIVERSIDE PARK RESTORATION PROJECT + (Weir removal, Addition of substrate and in … Weir removal, Addition of substrate and in channel features, Alteration in channel dimensions, Weir removal,,Creation of wetland, Creation of ponds and scrapes,,Diversification of in-channel features, Meandering channel, ,management of wetland by council (new area of work),Community Education, Public amenity and perception, Education, Public amenity and perception,)
- Case study:Removal of the Coupeau impoundment on Vicoin River and riverbed restoration + (Weir removal, Barrier removal, Riverbed restoration,,Creation of wetland,,Creation of new channel, construction of recreational facilities (trails and footbridges),,,)
- Case study:Twineham Weir Removal & In-channel Enhancements + (Weir removal, Creation of backwaters, Habitat restoration, Creation of berms, Gravel augmentation,,Tree planting,,Adding sinuosity, Enhancing flow diversity, ,,Volunteer engagement,)
- Case study:River Somer channel enhancement, Midsomer Norton + (Weir removal, Creation of berms, Bed raisi … Weir removal, Creation of berms, Bed raising, Planting of native species, Removal of sediment,,,Channel naturalisation, Meandering channel, ,management of litter, management of undesirable plant species,creation of River Somer Management Team, fundraising,Participation in maintenance, Participation in works,on in maintenance, Participation in works,)
- Case study:Removal of the Ver mill weir on the Sienne River + (Weir removal, Creation of groynes,,Maintenance of riparian vegetation, Restoration of pond, ,,,)
- Case study:Welland for People and Wildlife Project + (Weir removal, Creation of low flow channel … Weir removal, Creation of low flow channel, Creation of pools, Creation of berms, Introduction of gravel, Marginal planting,,Creation of two stage channel, Create riffle/pool,,Meandering channel, Reconnection of cutoff meander, ,Planting wildflower mixes,Community Events, River open days, School Tours, Community involvement, Engagement with schools, Awareness raising,,Community engagement, Information board erectednity engagement, Information board erected)
- Case study:Irpin river restoration + (Weir removal, Dam removal,,, ,landuse changes,,cooperation with local or regional investors)
- Case study:Hogsmill River Connectivity Project + (Weir removal, Deculverting, Weir modification,,, ,,Community involvement,)
- Case study:River Adur - Shipley weir removal + (Weir removal, Deculverting, Weir modification,,, ,,,)
- Case study:Vén-Duna (Old-Danube) sidearm’s revitalization + (Weir removal, Dredging,Construction of new sluices, ,Ensuring biodiversity,Recreation,Information provision,Consultation)
- Case study:Wandle River Restoration Project: Hackbridge + (Weir removal, Habitat diversification,,Marginal wetland berms created,Increase in-channel hydromorphological diversity, ,,Community involvement, Aesthetics,,)
- Case study:Weir Road + (Weir removal, Introduction of gravel,,Habitat creation,Creation of pools and riffles ,,,)
- Case study:Removal of a pond weir in a tributary of Petersbach + (Weir removal, Pond drainage,, ,,,)
- Case study:Wummewiesen restoration project + (Weir removal, Removal of rip-rap, Bank reprofiling,,Extensive planting, Vegetation management, Increase water retention area,,Creation of new river arm, Creation of fish passes, ,,Land purchase,)