Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Chiese river upstream Idro lake – Trentino region + (Removal of embankment separating Lora stream from Chiese river,Excavation for floodplain creation,, ,,,)
- Case study:Lugg & Arrow, Radnorshire + (Removal of fish barriers, Fencing,,, ,Supporting local fisheries through marketing initiatives,,)
- Case study:UP! - The Usk Project + (Removal of fish barriers, Livestock fencing, Habitat restoration,, ,,,)
- Case study:Water Framework Directive Funding + (Removal of fish barriers,,, ,,,)
- Case study:Rétablissement de la continuité écologique sur la Luire + (Removal of hydrological structures, Draini … Removal of hydrological structures, Draining of the brooks, Reconstitution of the alluvial mattress, Scattering of blocks, Creation of three fording and two water troughs, Riparian planting,,,Meanders are conserved favouring sinousity, Laying of 2,600 m of electric fences,Occasionally, adjustments are made to keep a flooding of the wet micro-wetlands which had developed upstream of the works;,,ich had developed upstream of the works;,,)
- Case study:Allt Lorgy River Restoration + (Removal of in stream boulders and replacem … Removal of in stream boulders and replacement with wood structures, Additional strategic wood structures introduced, Graded extracted gravel to be used for sediment reintroduction, Embankment lowering,Removal of 3 culvert pipes. Infilling of a large drainage ditch., Site fenced to enable natural regeneration to take place. Supplementary planting planned for Spring 2013. Long term site monitoring programmed planned.,,,Demonstration site for natural flood management techniqueste for natural flood management techniques)
- Case study:Friends of Afon Llwyd (FOAL) + (Removal of invasive plants, Gravel traps, Bank improvement, Cut back of trees,,, ,Litter picking,,)
- Case study:Fluvial river restoration of Tordera in Sant Celoni + (Removal of invasive plants, Riverbank revegetation,Riparian planting, Habitat creation,, ,,Awareness raising,,)
- Case study:River North Esk Maintenance + (Removal of invasive species,,, ,,Citizen participation in the restoration project, Improved public access,,Community engagement,)
- Case study:River Monnow (Going Native) + (Removal of invasive species,,, ,,Engagement with schools,,Information board erected,)
- Case study:South Esk restoration + (Removal of invasive species,Depth variation, Livestock fencing,,Adding sinuosity, ,More sensitive channel maintenance,Awareness raising,)
- Case study:Reactivating river dynamics in the Vieux-Rhône River (non-navigable section) at Cornas, Roubion and Petite Île + (Removal of lateral dikes, Reactivating river margins,, ,,,)
- Case study:Bio-engineering techniques for bank protection on the Moselle River in Villey-le-Sec + (Removal of metal sheet piles, Installation of geotextile,Planting of helophytes at the foot of banks,, ,,,)
- Case study:Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras + (Removal of metal sheet piles, installation … Removal of metal sheet piles, installation of bio-engeneering bank protection, Helophytes planted, Installation of geotextile, Gabion bed,,Planting of helophytes at the foot of banks, Seeding of work areas with a mix of herbaceous plant, restoration of wooded areas by planting white willows, Elimination of the invasive species found on site, Creation of pond,, ,,,cies found on site, Creation of pond,, ,,,)
- Case study:Thur + (Removal of northern overbank,Reconnection of the alluvial forest to the active floodplain,Creation of braided channel ,,,)
- Case study:Création d’un bras de contournement de plusieurs étangs sur le Fliez et restauration du marais de Contes + (Removal of nozzles which provided a connec … Removal of nozzles which provided a connection hydraulics and fish farming directly between Fliez and ponds, Creation of a bypass, Riverbed restoration, Bank modification,,,Adding sinuosity, ,,An educational trail is set up to improve access to the site and facilitate leisure activities,he site and facilitate leisure activities,)
- Case study:Restoration of the longitudinal continuity along the Canche and its classified tributaries + (Removal of obstructions to flow,,Creation of fish passes, ,,,)
- Case study:Habitat and water flow restoration on River Rábca + (Removal of reed, Removal of small bars, Weir removal,,Riparian planting, Removal of fallen trees,Ensuring biodiversity,,)
- Case study:2e Lower Woodsford River and Floodplain Enhancement + (Removal of revetments,,Tree planting, Lowering of embankments,,Re-profiled ditch ,,Community involvement, Engagement with schools,,Raised interest in future projects)
- Case study:River Roding at Ray Lodge Park + (Removal of revetments,Depth variation,Planting,Re-profiling,Removal of embankments,Creation of backwater,Creation of pond, Adding sinuosity, ,,,Participation in maintenance,Consultation,Participation in design)
- Case study:SCI Parga-Ladra-Támoga: recovery of bog woodland and dystrophic lake + (Removal of revetments,Depth variation,Revetmens with local species,, ,,Awareness raising,,)
- Case study:River Quaggy- Chinbrook meadows + (Removal of revetments,Introduction of gravel,Planting of native species,Removal of embankments,Creation of wetland,Creation of pond,Adding sinuosity, ,,,Information provision,Consultation)
- Case study:Room for the River + (Removal of revetments,Reduction of bank slope,, ,,,Information provision,Consultation,Participation in works,Participation in design)
- Case study:Ecological restoration of The Arboleda and the Meander of Santes Creus. Aiguamúrcia municipality (Alt Camp). Gaia River Basin + (Removal of rip-rap,Bank stabilisation,Removal of exotic plants, Removal of rubbish,,,)
- Case study:Fluvial improvement in Riera de Caldés + (Removal of rip-rap,New bioengineering elements in order to stabilize slope banks,Riparian planting,Removal of exotic plants, ,,,)
- Case study:Dagenham Brook de-silting + (Removal of sediment,, ,,,)
- Case study:Ecological Restoration of Vlascuta Lake + (Removal of sediment,,, ,,,Information provision)
- Case study:Blanice River + (Removal of sediment,,,Bypass channel, ,bypass maintenance,,)
- Case study:Effacement du seuil du Moulin d’Hatrize sur l’Orne + (Removal of spillway, Destruction of large part of the dike, Implantation of vegetated banquettes, Bank stabilisation, Planting,,,Development of a flow control structure, tightening of the minor bed, Creation of meanders, ,,,)
- Case study:Effacement du seuil de Carayon sur le Thoré + (Removal of treshold, Removal of supply canal to protect the banks, Arches have been cleared, Placement of stone walls, dry work by setting up a cofferdam to temporarily deflect flow of the watercourse,, ,Realization of an electric fishing of backup,,)
- Case study:Environmental design Mandalsvassdraget + (Removal of weirs (9 weirs), installation o … Removal of weirs (9 weirs), installation of gravel habitat, establishment of shelter in the substrate, sediment harrowing (using an excavator); introduction of larger stones in the riverbed, stream,Activation of sidearms, ,Future increase of minimum discharge still under evaluation,Active involvement of local interests groups and land owners,of local interests groups and land owners,)
- Case study:Suppression de l’étang de Condé-sur-Iton et restauration de zones humides + (Removal of woody vegetation, Creation of w … Removal of woody vegetation, Creation of wetlands, Removal of structures, Filling of pits, Tightening of the bed, Implementation of blocks, Creation of fish pass, Bank protection, Planting, Installation of geotextile,,Creation of meanders, ,,Creation of weir for fishing activity,, ,,Creation of weir for fishing activity,)
- Case study:More space for the river Orbigo + (Removal/retreat of embankments,, ,,,)
- Case study:Haynes Park + (Removing of concrete structures, Weir removal,, ,,,)
- Case study:Frog Island + (Removing of concrete structures,, ,,,)
- Case study:Manor House Gardens + (Removing of concrete structures,, ,,,Economic benefits)
- Case study:Merdian Water development site + (Removing of concrete structures,, ,,Aesthetics,)
- Case study:Teddington Wharf + (Removing of concrete structures,, ,,Improved public access,)
- Case study:Brent River Park Phase II + (Removing of concrete structures,,,Creation of meanders, ,,Improved public access,)
- Case study:Roneo Corner + (Removing of concrete structures,,Creation of meanders, ,,,)
- Case study:Mill Green + (Removing of concrete structures,Creation of wetland, Habitat creation,Creation of meanders, Creation of pools and riffles ,,,)
- Case study:Lewisham College weir + (Removing of concrete structures,Habitat creation, ,,,)
- Case study:Rainham Creek Tidal Sluice Removal + (Removing of concrete structures,Reedbed creation, UK BAP habitat creation/restoration,,,,)
- Case study:River Brent at Brent Cross + (Removing of concrete structures,Reedbed creation,, ,,Aesthetics, Improved public access,)
- Case study:King Georges Park + (Removing of sheet piling,,Creation of meanders ,,,)
- Case study:Lee Navigation by Walthamstow Marshes + (Removing of sheet piling,Creation of wetland, Reedbed creation, Creation of pond, ,,,)
- Case study:Rehabilitation of Benta stream + (Renewal of reventments,Removal of sediment,Planting,Creation of fish spawn nursing places,Creation of pipelines,, Reparation of sluice gates,channel maintenance,Floodprotection,landenhancement,Information provision)
- Case study:Revitalisation of Nagy-Pándzsa watersystem + (Renewal of reventments,Removal of sediment,Creation of reservoirs, ,Reparation of sluice gates,Watersupply for Natura 2000 habitats,Floodprotection,Information provision,Consultation)
- Case study:Reopening of the culverted Redon river + (Reopening of culverted river, Bank stabilisation, Planting,,,Meandering channel, ,,,)
- Case study:Reopening and restoration of the stream Hovinbekken + (Reopening of culverted river, Habitat restoration, habitat creation, Creation of pools and riffles, Sediment trap building,,,Creation of pools and riffles, Creation of pond, ,Reduced pollution,,,)
- Case study:Teglverksdammen + (Reopening of culverted river, Habitat restoration, habitat creation, Creation of pools and riffles, Sediment trap building,,,Creation of pools and riffles, Creation of pond, ,Reduced pollution,,,)