Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Guadiamar Green Corridor Project + (Recovering connectivity longitudinal and t … Recovering connectivity longitudinal and transversal,Buffer strips,Recovery of dynamic river system, Restoring riparian vegetation,,Remove drains and pipes Elimination of pollutants due to the discharge of toxic sludge,Recovering natural habitats,Recovering natural landscapes,,, habitats,Recovering natural landscapes,,,)
- Case study:The Pentney Restoration Project + (Recovery of channel morphology, Introduction of spawning gravels,,Habitat creation, Habitat enhancement, Riparian habitat restoration, Riparian planting,, ,,,)
- Case study:Environmental restoration of the river Zújar + (Recovery of channel morphology,,Protecting and promoting wildlife, Assessment and monitoring program Conditioning of recreational areas,,,)
- Case study:River Wandle: Silt & SuDs + (Reduce diffuse pollution,,, ,,Community involvement,)
- Case study:Upper Welland Water Friendly Farming Project + (Reduce diffuse pollution,,, UK BAP habitat creation/restoration, Non BAP habitat creation/restoration, Farm infrastructure interventions,,Fencing, Non/agricultural business changed its way of working,,,)
- Case study:Improving the structure of the Lahn-patak in Hungary + (Reduction of bank slope, Deflectors,Planti … Reduction of bank slope, Deflectors,Planting,Creation of fish ladders, Depth variation,,Creation of a lake,,Re-instatement of old course, Adding sinuosity, Creation of meanders, ,Ensuring biodiversity,Landscape,Improved public access,Information provision,Consultation access,Information provision,Consultation)
- Case study:Rinya water-system reconstruction + (Reduction of bank slope,Reventment renewal,Creation of fish ladders,Riverbed stabilization, Weir construction,,Riparian planting, Removal of exotic plants,,Channel widening ,Ensuring biodiversity,Recreation,Decreased flood risk,)
- Case study:Vester Nebel Restoration + (Regrading, Introduction of spawning gravels,,,Creation of new channel, Adding sinuosity, ,,,Information provision,Consultation,Participation in design,Participation in monitoring)
- Case study:River Kennet Restoration at Durnsford + (Regrading,Removal of invasive species,Cut … Regrading,Removal of invasive species,Cut back of trees,Depth variation, Introducing large woody debris, Introduction of gravel,,Connection to wider floodplain, Creation of wetland,Channel narrowing, Adding sinuosity, ,Management of organic and inorganic sediments,Improved public access,norganic sediments,Improved public access,)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Construction of green infrastructures in the Fondazione Caetani farm – Restoration of the Fosso Epitaffio + (Remodeling and extension of the river bank … Remodeling and extension of the river bank; Remodeling also some sections of the riverbed for the creation of different conditions of the river flow speed and morpho-bathymetric heterogeneity functional to fauna, especially amphibious.,Creation of a riparian arboreous shrubland; Planting of hygrophilous shrub species, and a first band of elophytes (Phragmites australis, Typha latifolia) and a second with shrubby and planar shrubby and arboreal species (Salix spp, Populus spp, Ulmus minor, Quercus robur). , ,Landsteward agreement,,Quercus robur). , ,Landsteward agreement,,)
- Case study:Removal of twenty small structures and diversification of the Main Channel of the River Couasnon + (Removal of 22 flaps,Introducing sediment,Creation of a flood expansion area, Prohibition of pumping of water,,,)
- Case study:Effacement partiel du seuil Cros sur la Dunière + (Removal of a part of the dam up to 1 m, In … Removal of a part of the dam up to 1 m, Installation of three mini tresholdsto prevent erosion, realization of a fishery backup and dry work with the installation of a cofferdam to temporarily deflect the flows, Installation of geotextile, Bank protection,,, ,,,tion of geotextile, Bank protection,,, ,,,)
- Case study:Inchewan Burn Bed restoration + (Removal of artificial wire/stone bed, Replicated upstream boulder bed step/pool sequence,,Removal of non-native species, Large scale planting of native species,,In-channel placement of boulders to provide flow diversity ,,Student Education,,Local support,)
- Case study:Austria Upper Mur - River widening Lässer Au (LIFE+ (LIFE+ 08 NAT A 614) Inner-Alpine river basin management – Upper River Mur - murerleben II 2010-2015) + (Removal of bank reinforcements, Restoration of the connection of side arms,,, ,,,)
- Case study:Aaijen- Removal of bank fixation + (Removal of bank reinforcements,,, ,,,)
- Case study:R Derwent Abutment & Buttress Removal + (Removal of bank reinforcements,,, ,,,)
- Case study:Ems floodplain + (Removal of bank reinforcements,,Develop riparian forest, Protect/restore riparian zone,,Lengthening of channel, Channel widening, ,,Wildlife improvement,)
- Case study:Agreed definition of mobility area for the Adour + (Removal of bank reinforcements,,Develop riparian forest,, ,Definition of erodble corridor,,Consultation)
- Case study:Restoring Brent Rivers and Communities + (Removal of bank reinforcements,,Restoration of pond, Maintenance of riparian vegetation,, ,Litter picking,,Community Education, Community Events, Community Litter-picking work, Community involvement,,)
- Case study:Soest - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort + (Removal of bank reinforcements,Creation of natural floodwater dynamics, ,More sensitive floodplain maintenance,,)
- Case study:Effacement du seuil du moulin du Bourg sur le Vicoin + (Removal of central slab, valves and spillway, Creation of ramp, Placing of mini-treshold in order to stabilise banks, Tree planting, Planting of grass,, ,,,)
- Case study:QUERCUS Ravensbourne + (Removal of concrete banks and bed, Bank reprofiling, Planting, Depth variation, Removal of fencing,Buffer strips, Creation of backwaters, Creation of terraces, New footpaths,Improvement of channel morphology, Creation of meanders ,,,)
- Case study:Cornmill Gardens (QUERCUS) + (Removal of concrete banks and bed, Bank reprofiling,,Buffer strips,,Improvement of channel morphology, ,,,)
- Case study:Upper Emscher + (Removal of concrete banks and bed, Opening … Removal of concrete banks and bed, Opening the river about 2 km, Bed raising,,Increase water retention area, Connection to wider floodplain, Wetland habitat,Removal of concrete bank protection, Adding sinuosity, Channel widening, ,,Information for the public, New bicycle path,ormation for the public, New bicycle path,)
- Case study:Doñana 2005 + (Removal of contaminated material,Restoring … Removal of contaminated material,Restoring function of wetlands,,Landscape improvement of the area of the spill Creating the post of Coordinator to drive the project "Doñana 2005",,,Quantity & dynamics of flow,Continuity of sediment transport,Structure & condition of riparian zonesnsport,Structure & condition of riparian zones)
- Case study:Clugston Burn (CASS) + (Removal of debris,, ,,,)
- Case study:Chiese river upstream Idro lake – Trentino region + (Removal of embankment separating Lora stream from Chiese river,Excavation for floodplain creation,, ,,,)
- Case study:Lugg & Arrow, Radnorshire + (Removal of fish barriers, Fencing,,, ,Supporting local fisheries through marketing initiatives,,)
- Case study:UP! - The Usk Project + (Removal of fish barriers, Livestock fencing, Habitat restoration,, ,,,)
- Case study:Water Framework Directive Funding + (Removal of fish barriers,,, ,,,)
- Case study:Rétablissement de la continuité écologique sur la Luire + (Removal of hydrological structures, Draini … Removal of hydrological structures, Draining of the brooks, Reconstitution of the alluvial mattress, Scattering of blocks, Creation of three fording and two water troughs, Riparian planting,,,Meanders are conserved favouring sinousity, Laying of 2,600 m of electric fences,Occasionally, adjustments are made to keep a flooding of the wet micro-wetlands which had developed upstream of the works;,,ich had developed upstream of the works;,,)
- Case study:Allt Lorgy River Restoration + (Removal of in stream boulders and replacem … Removal of in stream boulders and replacement with wood structures, Additional strategic wood structures introduced, Graded extracted gravel to be used for sediment reintroduction, Embankment lowering,Removal of 3 culvert pipes. Infilling of a large drainage ditch., Site fenced to enable natural regeneration to take place. Supplementary planting planned for Spring 2013. Long term site monitoring programmed planned.,,,Demonstration site for natural flood management techniqueste for natural flood management techniques)
- Case study:Friends of Afon Llwyd (FOAL) + (Removal of invasive plants, Gravel traps, Bank improvement, Cut back of trees,,, ,Litter picking,,)
- Case study:Fluvial river restoration of Tordera in Sant Celoni + (Removal of invasive plants, Riverbank revegetation,Riparian planting, Habitat creation,, ,,Awareness raising,,)
- Case study:River North Esk Maintenance + (Removal of invasive species,,, ,,Citizen participation in the restoration project, Improved public access,,Community engagement,)
- Case study:River Monnow (Going Native) + (Removal of invasive species,,, ,,Engagement with schools,,Information board erected,)
- Case study:South Esk restoration + (Removal of invasive species,Depth variation, Livestock fencing,,Adding sinuosity, ,More sensitive channel maintenance,Awareness raising,)
- Case study:Reactivating river dynamics in the Vieux-Rhône River (non-navigable section) at Cornas, Roubion and Petite Île + (Removal of lateral dikes, Reactivating river margins,, ,,,)
- Case study:Bio-engineering techniques for bank protection on the Moselle River in Villey-le-Sec + (Removal of metal sheet piles, Installation of geotextile,Planting of helophytes at the foot of banks,, ,,,)
- Case study:Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras + (Removal of metal sheet piles, installation … Removal of metal sheet piles, installation of bio-engeneering bank protection, Helophytes planted, Installation of geotextile, Gabion bed,,Planting of helophytes at the foot of banks, Seeding of work areas with a mix of herbaceous plant, restoration of wooded areas by planting white willows, Elimination of the invasive species found on site, Creation of pond,, ,,,cies found on site, Creation of pond,, ,,,)
- Case study:Thur + (Removal of northern overbank,Reconnection of the alluvial forest to the active floodplain,Creation of braided channel ,,,)
- Case study:Création d’un bras de contournement de plusieurs étangs sur le Fliez et restauration du marais de Contes + (Removal of nozzles which provided a connec … Removal of nozzles which provided a connection hydraulics and fish farming directly between Fliez and ponds, Creation of a bypass, Riverbed restoration, Bank modification,,,Adding sinuosity, ,,An educational trail is set up to improve access to the site and facilitate leisure activities,he site and facilitate leisure activities,)
- Case study:Restoration of the longitudinal continuity along the Canche and its classified tributaries + (Removal of obstructions to flow,,Creation of fish passes, ,,,)
- Case study:Habitat and water flow restoration on River Rábca + (Removal of reed, Removal of small bars, Weir removal,,Riparian planting, Removal of fallen trees,Ensuring biodiversity,,)
- Case study:2e Lower Woodsford River and Floodplain Enhancement + (Removal of revetments,,Tree planting, Lowering of embankments,,Re-profiled ditch ,,Community involvement, Engagement with schools,,Raised interest in future projects)
- Case study:River Roding at Ray Lodge Park + (Removal of revetments,Depth variation,Planting,Re-profiling,Removal of embankments,Creation of backwater,Creation of pond, Adding sinuosity, ,,,Participation in maintenance,Consultation,Participation in design)
- Case study:SCI Parga-Ladra-Támoga: recovery of bog woodland and dystrophic lake + (Removal of revetments,Depth variation,Revetmens with local species,, ,,Awareness raising,,)
- Case study:River Quaggy- Chinbrook meadows + (Removal of revetments,Introduction of gravel,Planting of native species,Removal of embankments,Creation of wetland,Creation of pond,Adding sinuosity, ,,,Information provision,Consultation)
- Case study:Room for the River + (Removal of revetments,Reduction of bank slope,, ,,,Information provision,Consultation,Participation in works,Participation in design)
- Case study:Ecological restoration of The Arboleda and the Meander of Santes Creus. Aiguamúrcia municipality (Alt Camp). Gaia River Basin + (Removal of rip-rap,Bank stabilisation,Removal of exotic plants, Removal of rubbish,,,)
- Case study:Fluvial improvement in Riera de Caldés + (Removal of rip-rap,New bioengineering elements in order to stabilize slope banks,Riparian planting,Removal of exotic plants, ,,,)