Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Water and Life for Drava and Vuka + (Dredging of sediment (mud), Weir modification,,, ,Ensuring biodiversity,Recreation,Information provision,Consultation)
- Case study:Conservation of alluvial + (Dredging, Removal of rock-fill weir, Reloc … Dredging, Removal of rock-fill weir, Relocation of the drinking water pipes,Control of invasive species,, ,Protection of the island, Ensuring biodiversity,Recreation, Improvement of drinking water quality, Land purchase,Information provision, Consultation, Participation in workssion, Consultation, Participation in works)
- Case study:Revitalisation of branch ’Felsőszentmártoni’ at River Dráva + (Dredging, Weir modification, Creation of pipelines,,Cut back of trees,, ,Ensuring biodiversity,Recreation,Consultation,Information provision)
- Case study:Hadfield Weir Fish Pass + (Eel pass, Creation of fish passes,,, ,,,)
- Case study:Restoration of the stream of the Partido + (Elimination of the pipeline on the left bank,Removal of sediment,Revetmens with local species,Habitat restoration,Improvement of channel morphology, ,,Comprehensive environmental restoration of a large area in contact with the National Park,)
- Case study:Increased biodiversity, river Llobregat, Sallent. + (Embankment creation, Revetments with local species,Silvicultural treatments, Habitat creation,, ,,New pahts near the river,)
- Case study:Braid Burn at Inch Park + (Embankment creation,,Floodplain reconnection,,Adding sinuosity, ,,,)
- Case study:Regelsbrunner Aue + (Embankment lowering,,Connection to wider floodplain,,Re-instatement of old course ,,Land purchase,)
- Case study:River Alt at Knowsley + (Embankment lowering,,Floodplain reconnecti … Embankment lowering,,Floodplain reconnection, Protect/restore riparian zone, Riparian planting,,Creation of braided channel, Channel naturalisation, ,Tree management works and re-opening of choked side channels is planned as part of 'Knowsley 2020' project. The site would have benefited from a long term tailored management plan.,Improved public access, Engagement with schools,,Community engagement,gement with schools,,Community engagement,)
- Case study:Kirkstone Beck River Restoration + (Embankment removal, Diversification of in- … Embankment removal, Diversification of in-channel features,,Rejuvination of river delta, widening of river channel,Widening to allow wandering sections ,,partnership working with organisations including the EA, NE & LDNPA, as well as the tenant farmer; site visits hosted to share project success and lessons,s hosted to share project success and lessons,)
- Case study:PROGETTO WETLAND - Volturno + (Embankment renaturalization, Bank reprofiling,,Excavation for floodplain creation, Floodplain creation, Buffer strips,, ,,Improved public access,,)
- Case study:Austria Upper Mur - River widening St. Peter Au (LIFE+ (LIFE+ 08 NAT A 614) Inner-Alpine river basin management – Upper River Mur - murerleben II 2010-2015) + (Embankment renaturalization, Restoration of the connection of side arms,,, ,,,)
- Case study:Elimination of a pond along the Erve River and conservation of the historical heritage in Sainte-Suzanne-et-Chammes + (Emptying reservoir, Removal of flap gate, Removal of spillway, Dam removal, Creation of side leats, Implementation of distribution structures,Planting of banks, ,,,)
- Case study:Creation of spawning ground for Baltic salmon, anadromous brown trout and river lamprey at Veneküla rapid, river Pirita + (Excavation of bedrock, Introduction of spawning gravels, Creation of pools, Creation of fish refuge areas,,, ,,,)
- Case study:Markway Stream Restoration + (Excavation of bedrock,,,Creation of meanders, Installation of a clay plug,,,)
- Case study:River Valency at Boscastle + (Excavation of bedrock,Construction of flood wall,Change in bed profile, Creation of pools, embayments and cascades created ,,,)
- Case study:Marine Colliery river blockage + (Excavator used to remove blockage,, ,,,)
- Case study:Recreation of a low-flow sinuous channel in an urban stretch of the Montvaux stream + (Extensive planting, Introduction of gravel,,,Adding sinuosity, ,,Improved public access,Information provision,Participation in design)
- Case study:Gottar Water weir fish barrier easement + (Feasibility and Optioneering study nearing completion. Preferred option yet to be identified.,, ,,,)
- Case study:Wansbeck 100 + (Fenced off riverbank, Weir removal,,Creation of wet woodland, Creation of wetland, Riparian planting,, Hardened crossing points,,Community involvement, Engagement with schools,,Work with farmers and land managers)
- Case study:Delivering Multiple Benefits for Water on Foston Brook + (Fenced off riverbank,,, Hardened crossing points, drinking bays,Farm advice and plans,,,)
- Case study:Source to Sea Programme – 8. River Keer Restoration + (Fenced off riverbank,,Fencing of riparian zone,, ,,Awareness raising, Media,,Practical volunteering activities like beach cleans, Public consultation,)
- Case study:WHIP - The Wye Habitat Improvement Project + (Fencing, Creation of fish passes, Cut back of trees,,, ,,,)
- Case study:Wyre Riparian Restoration Initiative + (Fencing, Livestock fencing,,, Soft engineering methods, restored machinery track,,,)
- Case study:Rural Enterprise Scheme + (Fish habitat restoration,, ,Increased fishing rights,,,)
- Case study:Tottenham Lock Floating Ecosystem + (Floating vegetated bank structures,, ,,,)
- Case study:MediCyn + (Grand Clos” site: hydraulic isolation of 3 temporary ponds to delay the date of autumn water fill in,“Relai” site: digging of 9 temporary ponds, ,Hydraulic calendars controlled by pumping and irrigation network,Users (hunters and farmers) consultation,)
- Case study:The South Hams River Improvement Project (SHRImP) + (Gravel augmentation,Fencing, Alternative d … Gravel augmentation,Fencing, Alternative drinkers, Nutrient management, Cut back of trees,,Improvement of channel morphology, Creation of fish passes, Avon dam fisheries water releases, Fish tracking, Fish biomanipulation, Nutrient modelling, Fish surveys, Heavy metal investigations,Farm advice and plans,Valuing social benefits of works, Community Education,,Community engagement,Community Education,,Community engagement,)
- Case study:Habitat improvement project in Segre river, in Alòs de Balaguer + (Gravel bar,,Re-instatement of old course, Channel narrowing, ,,,)
- Case study:Longstreet A 91a + (Gravel berms, Riffle creation, Bank reprofiling,,,Lowering of impoundment, Introducing large woody debris, Tree management, ,,,)
- Case study:Bird Reserve “Tancat de la Pipa” (Valencia) + (Green filters creation and two shallow, pe … Green filters creation and two shallow, permanent lagoons,, ,Channels, vegetation and maintenance active, daily management,Sensitization, environmental education of scholars, public use and elaboration of dissemination materials,Improvement of the socio-economic and other culture heritage networkconomic and other culture heritage network)
- Case study:Salmonid, coarse fish and wetland bird habitat and flood plain linkage project, Hampshire Avon + (Habitat restoration, Cleaning of spawning gravels, Creation of backwaters,,, ,The project enhanced 300m2 of riffle gravel salmonid spawning habitat at 9 sites.The project also carried out an additional 100m2 of gravel cleaning.,,)
- Case study:Snettisham River Ingol Woody Habitat Project + (Habitat restoration, Introducing large woody debris, faggot berms,,,Channel narrowing, ,,Community involvement, Community Education,,)
- Case study:Restoration of the river Akerselva + (Habitat restoration, Re-introducing spawning gravel, Reopening of side channels,,, ,Reduced pollution,,,)
- Case study:European Fisheries Fund + (Habitat restoration, Removal of fish barriers, Cut back of trees,,, ,,,)
- Case study:Ironbridge Farm + (Habitat restoration,,Creation of backwaters, Creation of wetland, Creation of pond,,Habitat restoration, Creation of backwater, UK BAP habitat creation/restoration,,Ensuring biodiversity, Woodland management, Promoting riparian vegetation,,,)
- Case study:Beekherstel Keersop + (Hout in de beek,Beschaduwing, ,,,)
- Case study:Restoration of the previous riverbed of the Dadon + (Implementation of rip rap,Habitat diversification,Implementation of vegetated boxes,Depth variation, Riverbed restoration,,,Creation of meanders, Adding sinuosity, ,,,)
- Case study:Whit Beck River Restoration Project + (Improvement of natural flows, Recovery of channel morphology, Introducing sediment,,Connection to wider floodplain,,Channel naturalisation, Re-meandering, ,,Community involvement, Community consultation,,)
- Case study:Opijnen- Side channel + (Improvement of natural flows,,Creation of side channel ,,,)
- Case study:South Calder Water deculverting and habitat restoration + (Improvement of natural flows,,Deculverting, Improve longitudinal connectivity,,Improvement of channel morphology, Habitat restoration, Improving water quality,,,,)
- Case study:Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas + (Installation of a distribution structure a … Installation of a distribution structure and monks, Creation of a bypass, Filling of drainage ditches, rehabilitation of ponds, Three tresholds are removed or redevelopped, Removal of ponds, Bank protection,,Meandering channel, ,The level of the water bodies is lowered during two months in summer and are completely drained every three to five years.,,etely drained every three to five years.,,)
- Case study:Restoration in river Tajo and tributaries after kaolin spillage + (Installation of bioengineering elements, Creation of fish passes,,Removal of sediments from the mines, Vegetation management,, ,,New paths near the river, Information panels for people,,)
- Case study:River Ogwen and Nant Francon + (Installation of cascades, Creation of pools and riffles,,,Morphology of the bed altered ,,,)
- Case study:River Pinn Enhancement near Ickenham + (Installation of coir rolls, Deflectors,,Creation of backwater, Creation of pools and riffles ,,,)
- Case study:Habitat Improvements on the River Colne at West Drayton + (Installation of coir rolls, Introduction of gravel,,,Creation of backwater ,,,)
- Case study:Lidl + (Installation of coir rolls, Introduction of gravel,,Habitat creation, Reedbed creation, Tree management, ,,Community Education,,)
- Case study:River Shuttle Enhancement Works - Love Lane + (Installation of coir rolls,, ,,,)
- Case study:Shaping and protecting water-mud biotopes in Garwolin Forest division through development of small retention + (Installation of damming valves, Creation of islands, Creation of irregular shaped shore line,, ,,,)
- Case study:Restoration of Grobruelva + (Installation of gravel habitat (gravel and stones),Removal of retainment structure (Rotubekken), improvement of fish migration (at Sagvollfossen), New pipe for sewage runoff along a side beck of Grobruelva,Removal of litter (especially car tires),,)
- Case study:The Irfon Special Area of Conservation Project + (Installation of watergates, Fencing, Erosion Repair, Cut back of trees,,, ,Stocking,,,)