Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Blackhorse Lane Waterfront Park + (Deculverting,, ,,,)
- Case study:Friern Barnet Former Sewage Works + (Deculverting,, ,,Aesthetics, Recreation, Community Education,,)
- Case study:Goodmayes Park, Mayes Brook + (Deculverting,, ,,Improved public access,)
- Case study:Aston Clinton River Restoration + (Deculverting,,,Bypass channel, Creation of new channel, ,,Engagement with a wide range of stakeholders,Information board erected,)
- Case study:Shepley Mill Fish Pass + (Deculverting,,Creation of fish passes, ,,,)
- Case study:New South Quarter - Croydon + (Deculverting,,Creation of pools and riffles ,,,)
- Case study:Grovelands Park Wetlands + (Deculverting,,Creation of swales and wetland basin, stream allowed to find new course,Meandering channel, ,,Community consultation, Community involvement, Community Education, Interpretation boards, Improved public access,,Reedbed creation in lake)
- Case study:DUMMY TEST Daylighting Sorum + (Deculverting,,Erosion protection,, construction of recreational facilities (trails and footbridges),,,Volunteer engagement,,)
- Case study:TEST Daylighting the Texas Valley stream + (Deculverting,,Erosion protection,, construction of recreational facilities (trails and footbridges),,,Volunteer engagement,,)
- Case study:TEST Deculverting the Texas Valley Stream + (Deculverting,,Erosion protection,, construction of recreational facilities (trails and footbridges),,,Volunteer engagement,,)
- Case study:Reopening of a section of the River Bièvre in an urban environment + (Deculverting,,Planting,,Re-meandering, Elimination of wastewater connections,Creation of a park,Management of vegetation,,)
- Case study:Parsloes Park + (Deculverting,Creation of wetland, ,,,)
- Case study:Norbury Brook in Norbury Park + (Deculverting,Creation of wetland, ,,Aesthetics, Improved public access,Climate change adaptation)
- Case study:Mayes Brook River Restoration, Mayesbrook Park, East London + (Deculverting,Floodplain creation, Sustainable urban drainage ponds (SUDs), Creation of backwaters, ,,,)
- Case study:Wickes – Harford retail site + (Deculverting,Tree management,Creation of meanders ,,Improved public access,)
- Case study:Isar-Plan + (Deepening of river floor, Removal of bank … Deepening of river floor, Removal of bank reinforcements, Creation of gravel banks, Bank reprofiling,,Large scale planting of native species, Creation of a flood expansion area,,Channel widening,Creation of willow island,Creation of braided channel, Channel naturalisation, embedding of rootballs and tree trunks, Creation of new bicycle path, natural seating stones places on banks,Waste management, provision of temporary toilet facilities,Information for the public,let facilities,Information for the public,)
- Case study:Recreation of a sinuous low-flow channel in the Merloz + (Deflectors, Bank reprofiling,,,Adding sinuosity, ,,,)
- Case study:Drayton + (Deflectors, Bank stabilisation, Cattle drinkers, Introduction of gravel,,Tree planting, Tree management,,Channel narrowing, ,Fencing,,,)
- Case study:Habitat improvement measures in Bortneelva + (Deflectors, Creation of fish passes, Removal of fish barriers, Creation of pools, Creation of fish refuge areas, introduction of blocks, Big rocks are placed in the stream, Creation of low flow channel,,Improving fish migration,, ,,,)
- Case study:Enler River enhancement project + (Deflectors, Creation of groynes, Riffle creation, Introduction of spawning gravels, Fish habitat restoration,,, ,,,)
- Case study:Restoration of dry riverbeds in Røssåga in conjunction with relocation of power plant outlets + (Deflectors, Creation of low flow channel, … Deflectors, Creation of low flow channel, Creation of fish spawn nursing places, Introduction of spawning gravels,,Construction of flood wall,,In-channel placement of boulders to provide flow diversity, ,Habitat improvement through water and vegetation management, Flow management,,, vegetation management, Flow management,,,)
- Case study:Hackbridge weir notch + (Deflectors, Installation of coir rolls, Removal of sediment,, ,,,)
- Case study:Catford Greyhound Stadium + (Deflectors, Introduction of gravel,,, ,,,)
- Case study:Yeading Brook fields - Reedbed creation + (Deflectors, Toeboard removal,Creation of wetland, Reedbed creation,, UK BAP habitat creation/restoration,,,,)
- Case study:The Bowmont Catchment + (Deflectors,,Tree planting,,leaky woody dams, ,,,)
- Case study:Cranford Park Phase 2 + (Deflectors,Tree management, ,,,)
- Case study:River Avon at East Chisenbury + (Deflectors,Tree management,Bed raising,Marginal planting, Introducing large woody debris,,Reconnection to the riparian zone,Creation of wooden deflectors, Channel narrowing, ,,,)
- Case study:Restoration of Ingarskilanjoki River + (Depth variation,Re-introducing stones, Introduction of gravel, Creation of fish passes,,Buffer strips, ,,,Participation in design,Information provision)
- Case study:Herefordshire Asset Restoration Project (HARP) + (Developing angling infrastructure,, ,,Resolving angler/ canoeist conflict,)
- Case study:Démantèlement de neuf ouvrages sur le cours de l’Aa + (Dismantling of the gates that block the water current, Creation of fish pass,,, One gate was kept in the river to prevent erosion, Bottom racks and banks were kept in order to prevent erosion,,,)
- Case study:Arasement du vannage du moulin de Réveillon et réaménagement du lit mineur de la Blaise + (Dismantling of the mill, Leveling threshold with the water level, Helophytes planted, Bank stabilisation, Installation of geotextile,,,Creation of a sinuous channel ,,,)
- Case study:Fairham Brook Restoration Project + (Diversification of in-channel features, Creation of fish passes, Cut back of trees,,Tree management,, ,,,)
- Case study:Great Ryburgh End Restoration Scheme + (Diversification of in-channel features, Soft erosion solutions, Introducing large woody debris,,Tree planting, Creation of backwaters,, ,,,)
- Case study:Beekherstel Beekloop BmN + (Dood hout, 6 Vispassages, Beschaduwing,,, ,,,Afspraken met belanghebbende over waterverdeling)
- Case study:Herinrichting beekdal Tongelreep + (Dood hout, Grind bedden,, Bouwen met Natuur,,,)
- Case study:Herinrichting Beekloop + (Dood hout, Vispassages,Beschaduwing, ,,Afspraken met belanghebbende waterverdeling,)
- Case study:Water and Life for Drava and Vuka + (Dredging of sediment (mud), Weir modification,,, ,Ensuring biodiversity,Recreation,Information provision,Consultation)
- Case study:Conservation of alluvial + (Dredging, Removal of rock-fill weir, Reloc … Dredging, Removal of rock-fill weir, Relocation of the drinking water pipes,Control of invasive species,, ,Protection of the island, Ensuring biodiversity,Recreation, Improvement of drinking water quality, Land purchase,Information provision, Consultation, Participation in workssion, Consultation, Participation in works)
- Case study:Revitalisation of branch ’Felsőszentmártoni’ at River Dráva + (Dredging, Weir modification, Creation of pipelines,,Cut back of trees,, ,Ensuring biodiversity,Recreation,Consultation,Information provision)
- Case study:Hadfield Weir Fish Pass + (Eel pass, Creation of fish passes,,, ,,,)
- Case study:Restoration of the stream of the Partido + (Elimination of the pipeline on the left bank,Removal of sediment,Revetmens with local species,Habitat restoration,Improvement of channel morphology, ,,Comprehensive environmental restoration of a large area in contact with the National Park,)
- Case study:Increased biodiversity, river Llobregat, Sallent. + (Embankment creation, Revetments with local species,Silvicultural treatments, Habitat creation,, ,,New pahts near the river,)
- Case study:Braid Burn at Inch Park + (Embankment creation,,Floodplain reconnection,,Adding sinuosity, ,,,)
- Case study:Regelsbrunner Aue + (Embankment lowering,,Connection to wider floodplain,,Re-instatement of old course ,,Land purchase,)
- Case study:River Alt at Knowsley + (Embankment lowering,,Floodplain reconnecti … Embankment lowering,,Floodplain reconnection, Protect/restore riparian zone, Riparian planting,,Creation of braided channel, Channel naturalisation, ,Tree management works and re-opening of choked side channels is planned as part of 'Knowsley 2020' project. The site would have benefited from a long term tailored management plan.,Improved public access, Engagement with schools,,Community engagement,gement with schools,,Community engagement,)
- Case study:Kirkstone Beck River Restoration + (Embankment removal, Diversification of in- … Embankment removal, Diversification of in-channel features,,Rejuvination of river delta, widening of river channel,Widening to allow wandering sections ,,partnership working with organisations including the EA, NE & LDNPA, as well as the tenant farmer; site visits hosted to share project success and lessons,s hosted to share project success and lessons,)
- Case study:PROGETTO WETLAND - Volturno + (Embankment renaturalization, Bank reprofiling,,Excavation for floodplain creation, Floodplain creation, Buffer strips,, ,,Improved public access,,)
- Case study:Austria Upper Mur - River widening St. Peter Au (LIFE+ (LIFE+ 08 NAT A 614) Inner-Alpine river basin management – Upper River Mur - murerleben II 2010-2015) + (Embankment renaturalization, Restoration of the connection of side arms,,, ,,,)
- Case study:Elimination of a pond along the Erve River and conservation of the historical heritage in Sainte-Suzanne-et-Chammes + (Emptying reservoir, Removal of flap gate, Removal of spillway, Dam removal, Creation of side leats, Implementation of distribution structures,Planting of banks, ,,,)
- Case study:Creation of spawning ground for Baltic salmon, anadromous brown trout and river lamprey at Veneküla rapid, river Pirita + (Excavation of bedrock, Introduction of spawning gravels, Creation of pools, Creation of fish refuge areas,,, ,,,)
- Case study:Markway Stream Restoration + (Excavation of bedrock,,,Creation of meanders, Installation of a clay plug,,,)