- Case study:Kimpton Park + (Bank reprofiling,,Creation of new channel, Habitat creation ,,Aesthetics,)
- Case study:Bonesgate Phase 2 + (Bank reprofiling,,Creation of pond,Creation of meanders, ,,Aesthetics, Improved public access,)
- Case study:Dagenham Washlands Phase 2 + (Bank reprofiling,,Creation of wetland,Creation of backwater, Creation of meanders, UK BAP habitat creation/restoration,,,,)
- Case study:Short Heath Brook Project + (Bank reprofiling,,Floodplain reconnection,,Creation of braided channel, Channel widening, ,,Community Education,,Participation in decision process,)
- Case study:Beverley Park + (Bank reprofiling,,Habitat creation, Cut back of trees, Creation of wetland, Floodplain reconnection, Restoring riparian vegetation,,Channel realignment, ,,Public amenity and perception, Improved public access, Community Education,,)
- Case study:Millingerwaard-Floodplain rehabilitation + (Bank reprofiling,,Riparian planting,Creation of river dunes, Increase water retention area,, ,,,)
- Case study:Diffusing the Issue in rural Ribble - Stock Beck + (Bank reprofiling,,Tree planting, Fencing,, UK BAP habitat creation/restoration, Farm infrastructure interventions,,Agricultural business changed its way of working,,Community involvement,Reduce diffuse pollution,)
- Case study:River Soar fish refuge and wetland scrape + (Bank reprofiling,,Wader scrape creation,Creation of fish refuge areas, ,,,)
- Case study:Sydenham Cottages Nature Reserve + (Bank reprofiling,Creation of wetland, ,,,)
- Case study:Hogsmill Sewage Treatment Works phase 1 + (Bank reprofiling,Creation of wetland,Creation of backwater ,,,)
- Case study:River Don Restoration project + (Bank reprofiling,Fish passage improvements, ,Misconnections campaign, Highways England drainage, agricultural land managment, river restoration via development,,)
- Case study:Hampton Court Palace + (Bank reprofiling,Habitat creation, Reedbed creation, ,,Aesthetics,)
- Case study:Wilmer Way School Playing Field + (Bank reprofiling,Habitat enhancement, ,,Improved public access, Community Education,,)
- Case study:Blake Avenue, Mayes Brook + (Bank reprofiling,Reedbed creation, UK BAP habitat creation/restoration,,,Improved public access, Community Education,,)
- Case study:Worcester Park + (Bank reprofiling,Reedbed creation,,Creation of meanders, Creation of pond ,,,)
- Case study:Richmond Park + (Bank reprofiling,Tree management, ,,,)
- Case study:Ravensbourne Tescos + (Bank reprofiling,Tree management, ,,Improved public access, Community Education,,)
- Case study:Ravensbury Park + (Bank reprofiling,Tree management,Creation of backwater ,,,)
- Case study:River Avon Our Water Environment + (Bank stabilisation using engineered wood structures; sediment management,, Set-back fencing & riparian planting,,,)
- Case study:River Ebbw Bank Stabilisation + (Bank stabilisation, Bank protection,,, ,,,)
- Case study:River Calder improvement project + (Bank stabilisation, Partial weir removal, Cobble placement,, ,,'Trout in the Town' project raising the awareness of the river's value in schools,)
- Case study:Saving Chiswick Eyot + (Bank stabilisation, Restoration of natural … Bank stabilisation, Restoration of natural vegetation, Removal of invasive plants, Removal of invasive species, Bank improvement,,, ,Reducing bank side collapse (source of sediment),,Awareness raising, Community involvement, Citizen participation in the restoration project, the site is used by several schools and Thames Explorer Trust,several schools and Thames Explorer Trust,)
- Case study:Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage. + (Bank stabilisation, Restoration of natural vegetation,,Improve longitudinal connectivity, Fish habitat restoration,,,Improved network of trails,Information panels for people,)
- Case study:Hills to Levels + (Bank stabilisation, habitat creation,Flood … Bank stabilisation, habitat creation,Floodplain reconnection, floodplain scrapes, floodplain woodland planting,Opening long sections of culverts, leaky woody dams Run-off interception, diversion, attenuation,Soil managment and land use to improve infiltration and water quality,Working with Parish Councils and Flood Action Groups,h Parish Councils and Flood Action Groups,)
- Case study:Woughton on the Green bank stabilization + (Bank stabilisation,,, ,,,)
- Case study:Hofstadelva + (Bank stabilisation,,,Channelling ,,,)
- Case study:Adams Mill enhancements + (Bank stabilisation,,,Increase in-channel hydromorphological diversity, ,,,)
- Case study:River Dulais Restoration Project + (Bank stabilisation,,Creation of wetland, Vegetation management,,Channel narrowing, ,Fencing,,,)
- Case study:The Manzanares River Restoration: Demolition of an obsolete dam and riverine ecosystem rehabilitation + (Bank stabilisation,Dam removal,Riparian planting, ,,,)
- Case study:Environmental restoration project of the Guadajoz River (Castro del Río, Andalusia) + (Bank stabilisation,New bioengineering elements in order to stabilize slope banks,Revetmens with local species,,Protection and correction of incision problems ,,,)
- Case study:Environmental improvement intervention in a reach Anzur River in the village of El Nacimiento, in the Municipality of Rute (Cordoba) + (Bank stabilisation,Prevent and reduce bank erosion with live stakes,Silvicultural treatments,Protection and correction of incision problems,Improvement of channel morphology ,,,)
- Case study:Restoration of R. Odelouca 2 + (Bank stabilisation,Riparian habitat restoration, Control of invasive species,, ,,,)
- Case study:Returning the Fontenelle to its original bed at Saint-Wandrille-Rançon + (Banks were sloped, Returning of water to the river, Tree planting, Planting, Weir removal, Riverbed restoration, Helophytes planted,,, Fences and animal feeders were installed, Bridges built,Fish were caught before the work began,,)
- Case study:Dam removal at Grönkullen, River Rolfsån + (Barrier removal, Bed raising,,, ,,,)
- Case study:Restoration of Porvoonjoki + (Barrier removal, Creation of gravel banks, Creation of fish passes,,Barrier removal,Creation of meanders, ,,,)
- Case study:Démantèlement de l’ouvrage du Pont Fourneau sur la Selle + (Barrier removal, Creation of mini-treshold, Installation of fish caches, Installation of geotextile, Planting,,, ,,,)
- Case study:Arasement du seuil des Treize Saules sur la Quilienne + (Barrier removal, Planting of hydrophytes, Bank reprofiling,,, ,Filter masses were laid downstream of the dam to limit the impact of the work on the environment,,)
- Case study:Bocq river (Walphy - LIFE project) + (Barrier removal,,Creation of fish spawn nursing places, Improvement culvert bed,Adding sinuosity, ,,,)
- Case study:Skjern River Project + (Barrier removal,,Creation of wetland,,Re-meandering, ,Monitoring strategy,,Creation of a working group and an advisory board were established with representatives from local and national authorities and NGOs.,)
- Case study:Hoffer Brook + (Bed lowering at impoundment and bed raising with gravel (and mesh), Bank reprofiling, Sensitive desilt, Livestock fencing, Tree management, Cattle drinkers,,, ,,,)
- Case study:Harbertonford Flood Alleviation Scheme + (Bed lowering, Creation of pools and riffles, Weir modification,,Containment bund to prevent flooding, Construction of flood wall,,Channel widening, Surface drainage systems improved, SUDS,,,Engagement with schools, Community Education,,)
- Case study:West Amesbury + (Bed raising, Bank reprofiling,,Wetland restoration, Habitat creation,,Re-meandering, Improvement of natural flows, Creation of meanders, ,,,)
- Case study:Renaturierung Untere Havel + (Bed raising, Removal of revetments, Weir removal,,Floodplain reconnection,,Channel narrowing Create more natural flow regime,Re-connect backwater and wetlands, Creation of fish passes,,,,)
- Case study:Lippeaue Klostermersch + (Bed raising, Removal of rip-rap,,Floodplain reconnection,Tree planting, Connection to wider floodplain,,Former channel filled ,More sensitive grazing,,)
- Case study:HLS New Forest + (Bed raising, Removal/retreat of embankments,,,Re-meandering, Re-instatement of old course, ,,,)
- Case study:Wild Wylye Phase 1 + (Bed raising, Riffle creation,,Lowering of floodbanks,Channel realignment, Introducing large woody debris, Flow deflectors, Re-meandering, ,Influence management by fisheries manager,Community involvement,,)
- Case study:Holmsley Inclosure Stream Restoration + (Bed raising, Tree management,,, ,,,)
- Case study:Charlton St Peter A 8 + (Bed raising, Weir modification, Weir remov … Bed raising, Weir modification, Weir removal,,Remeandering, Modifying bank protection, Lowering of embankments, Riparian planting,,Channel narrowing, Fencing, Introducing large woody debris, Enhancing flow diversity, altering flow splits, Re-instatement of old course, ,,, splits, Re-instatement of old course, ,,,)
- Case study:Test and Itchen River Restoration Strategy 2 + (Bed raising, channel narrowing, use of woody material, structure removal,, ,Ideally a reduction in vegetation management on the Test and Itchen by river keepers,Engagement with landowners is key to the success of this long tem project,)
- Case study:Emergency works after breach on Lough Neas Drain (Cloghcor) + (Bed raising, rock groynes, Channel reprofiling, Creation of pools and riffles,,, Removal of a flap valve,,,)
- Case study:River Wensum Rehabilitation Project - Bintree + (Bed raising,,,Channel narrowing, ,,,Participation in maintenance)