Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Stainby Road, Colsterworth + (Bank Lowering, gravel and wood added,Ground water fed wetlands,In-set floodplains created, bend widening, bank reprofiling. ,Conservation grazing,,)
- Case study:Pearls in Peril LIFE+ GB Project - River South Esk + (Bank improvement, Bank reprofiling,,Riparian planting,, ,Land management,,Engagement with a wide range of stakeholders,,)
- Case study:Mill house private hydroelectric power generation scheme and fish pass + (Bank improvement, Bank stabilisation, Bank protection,,water meadow creation,Bypass channel, ,,,)
- Case study:River Nene Nature Improvement Area + (Bank improvement, Bank stabilisation, Crea … Bank improvement, Bank stabilisation, Creation of fish refuge areas, Fenced off riverbank, Habitat diversification,,Installing riverside fencing, Reduce diffuse pollution, Creation of backwaters, Installing riverside fencing, Riparian planting,,Creation of backwater, ,,,arian planting,,Creation of backwater, ,,,)
- Case study:Elgin Flood Alleviation Scheme + (Bank improvement, Channel reprofiling, Creation of berms, Depth variation,,Lowering of floodplain, Creation of wetland, Removal of embankments,,Creation of new channel, ,,Community Education, Community consultation,,)
- Case study:SMURF Tame + (Bank improvement, Channel reprofiling, Tree planting,,, ,,Improved public access,,)
- Case study:River Tame in Perry Hall playing fields ("SMURF") + (Bank improvement, Channel reprofiling,,, ,,Improved public access,,)
- Case study:River Stour at Glen's weir (Throop fisheries) + (Bank improvement, Creation of gravel deflectors, Creation of pools and riffles, Introduction of gravel,,, ,,,project undertaken with The Barbel Society and The Ringwood & Distric Angling Association)
- Case study:River Fugla + (Bank improvement, Introduction of gravel, Adding sinuosity, Bank stabilisation,,, ,,,)
- Case study:Pearls in Peril LIFE+ GB Project - River Dee + (Bank improvement, Removal of croys and embankments, Bed load addition,Riparian planting, Water margin fencing, ,Diffuse pollution mitigation,Raise awareness of the problems pearl mussels face among land managers and river users, Engagement with schools,,)
- Case study:Removal of the Stalapos weir over the river Alagnon + (Bank improvement, Weir removal, Bed reprofiling, Riverbank revegetation,,, ,,,)
- Case study:Greenwich Peninsula + (Bank improvement, creation of intertidal terraces,, ,,,)
- Case study:Rheinauen bei Rastatt + (Bank improvement, island restoration,reconnection of oxbow, ,,,)
- Case study:River Rea Restoration Project + (Bank improvement,,Barrier removal,, ,Ripar … Bank improvement,,Barrier removal,, ,Riparian Management to increase the amount of light getting through the canopy, promote natural re-growth of bankside plants and increase levels of bank stability and stabilise the spread of Phytophthora amongst the Alders, reducing bank side collapse (another main source of sediment),,Integrated catchment management approach, Community engagement, Local supportroach, Community engagement, Local support)
- Case study:Rams Brewery + (Bank improvement,,Displacement of flood defenses,, SUDS, green roofs,,,Riverside walkway,,)
- Case study:Rio Tepice urban restoration + (Bank improvement,,Riparian planting, ,Management of paths,Public green area,Participation in monitoring)
- Case study:Chambers Wharf + (Bank improvement,,removal of jetty roosting posts, Brownfield land regeneration, green roofs, SUDS, nesting boxes,,Riverside walkway,,)
- Case study:Knepp Rewilding Project + (Bank modification, Re-profiling, Creation … Bank modification, Re-profiling, Creation of low flow channel, Habitat restoration, Creation of low flow channel, Barrier removal, Creation of backwaters, Introducing large woody debris, Riverbed restoration,,Floodplain reconnection, Scrapes, Increase water retention area, Wetland habitat,,Channel realignment, Re-meandering, Enhancing flow diversity, Habitat restoration, Meandering channel, Selective removal of organic muds and sludge contaminated with toxic, Create more natural flow regime, Improvement of natural flows, Improving fish migration,,Flow management,,,proving fish migration,,Flow management,,,)
- Case study:River Idle Restoration Project + (Bank modification,Buffer strips, Tree planting,,Introducing large woody debris, ,,Engagement with a wide range of stakeholders - more planned.,,Survey work)
- Case study:River Wensum Restoration, Reach 10 Lenwade + (Bank reprofiling, Bank stabilisation, Bed reprofiling,,Tree management,,Brushwood berms to increase scour on the gravels, Introducing large woody debris, ,,,)
- Case study:Unit 1b - Long Bridge to Downstream of Louds Mill + (Bank reprofiling, Bed reprofiling,,Riparian planting,,Introducing large woody debris, Cleaning of spawning gravels,,,,)
- Case study:Valentines Park + (Bank reprofiling, Deculverting,, ,,,)
- Case study:Land at Buzzards Mouth Creek + (Bank reprofiling, Deculverting,,Creation of backwater ,,,)
- Case study:Goresbrook Park + (Bank reprofiling, Deculverting,Creation of wetland, ,,,)
- Case study:Hackbridge Restoration + (Bank reprofiling, Deflectors, Installation of coir rolls,, ,,,)
- Case study:Colliers Row + (Bank reprofiling, Deflectors,, ,,,)
- Case study:Essex Healthy Headwaters River Restoration Project + (Bank reprofiling, Diversification of in-channel features,,, Farm infrastructure interventions,,Community involvement,Presentations to instutions, Monitoring and survey projects)
- Case study:Ravensbury Park back channel + (Bank reprofiling, Installation of coir rolls, Deflectors,Tree management,Creation of backwater ,,,)
- Case study:Sainsburys, Hertford + (Bank reprofiling, Installation of coir rolls, Removing of sheet piling,, ,,,)
- Case study:Plough Lane weir removal + (Bank reprofiling, Introducing large woody debris, Introduction of gravel,,,Creation of pools and riffles ,,,)
- Case study:Chertsey meads + (Bank reprofiling, Introduction of gravel,,, ,,,)
- Case study:Beddington Park + (Bank reprofiling, Planting, Removal of sediment, Toeboard removal,,Reedbed creation,, ,,,)
- Case study:Louds Mill (Downstream)m Enhancement + (Bank reprofiling, Re-profiling, Cleaning of spawning gravels, Introducing large woody debris, Tree planting, Marginal planting,,, ,,,)
- Case study:Diffusing the Issue in rural Ribble + (Bank reprofiling, Reduce diffuse pollution … Bank reprofiling, Reduce diffuse pollution,,Barrier removal, Small scale easement installation, Tree plantation, Creation of fish passes, Fish habitat restoration,, UK BAP habitat creation/restoration, Farm infrastructure interventions,,Fencing, Non/agricultural business changed its way of working,,Community involvement,Economic benefitsg,,Community involvement,Economic benefits)
- Case study:Diffusing the Issue in rural Ribble - Swanside + (Bank reprofiling, Reduce diffuse pollution … Bank reprofiling, Reduce diffuse pollution,,Barrier removal, Small scale easement installation, Tree plantation, Creation of fish passes, Fish habitat restoration,, UK BAP habitat creation/restoration, Farm infrastructure interventions,,Fencing, Non/agricultural business changed its way of working,,Community involvement,Economic benefitsg,,Community involvement,Economic benefits)
- Case study:Taw River Improvement Project – Taw Access over Weirs + (Bank reprofiling, Reduce diffuse pollution,,Barrier removal,Diversification of in-channel features, ,Fencing, Non/agricultural business changed its way of working,,Community involvement,Monitoring and survey projects)
- Case study:Wye Herefordshire Improvement Project + (Bank reprofiling, Reduce diffuse pollution … Bank reprofiling, Reduce diffuse pollution,Barrier removal,, UK BAP habitat creation/restoration, Non BAP habitat creation/restoration, Farm infrastructure interventions,Fencing, Non/agricultural business changed its way of working,Community involvement,Economic aspectsing,Community involvement,Economic aspects)
- Case study:Diffusing the Issue in rural Ribble - Easington + (Bank reprofiling, Reduce diffuse pollution … Bank reprofiling, Reduce diffuse pollution, Weir removal/modification for easement of fish passage,,Tree planting, Fencing,, UK BAP habitat creation/restoration, Farm infrastructure interventions,,Agricultural business changed its way of working,,Community involvement,its way of working,,Community involvement,)
- Case study:Habitat Improvement: Stonebridge River Reserve, Og and Marlborough Fish Migration + (Bank reprofiling, Removal of fish barriers, Creation of fish passes,,, ,,,)
- Case study:Ladywell Fields to Cornmill Gardens + (Bank reprofiling, Removing of concrete structures,,Creation of meanders, Creation of pools and riffles, Tree management ,,Improved public access,)
- Case study:Mottingham Farm + (Bank reprofiling, Removing of concrete structures,,Creation of meanders ,,,)
- Case study:Linear Park + (Bank reprofiling, Removing of concrete structures, Toeboard removal,Tree management,Creation of meanders ,,,)
- Case study:Colfes School + (Bank reprofiling, Removing of concrete structures,,,Creation of meanders, ,,Aesthetics, Improved public access, Community Education,,)
- Case study:Ladywell Fields Phase 2 + (Bank reprofiling, Removing of concrete structures, Weir removal,Creation of wetland,Creation of meanders, Creation of pools and riffles ,,,)
- Case study:Fordmill weir + (Bank reprofiling, Removing of concrete structures, Weir removal,, ,,,)
- Case study:Broadway Fields/ Seagers Distillary + (Bank reprofiling, Removing of concrete structures,, ,,,)
- Case study:Broom Road Recreation Ground + (Bank reprofiling, Removing of sheet piling,, ,,,)
- Case study:Garratt Park + (Bank reprofiling, Removing structures,, ,,,)
- Case study:Ladywell Fields toeboarding + (Bank reprofiling, Toeboard removal,, ,,,)
- Case study:Morden Hall Park Water Vole Habitat Enhancement + (Bank reprofiling, Toeboard removal,, ,,,)
- Case study:Silk Stream toeboard removal + (Bank reprofiling, Toeboard removal,, ,,,)