Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Measures values" with value "Aforestation,, ,,,". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • Case study:Letting the Dove Flow  + (Allowing stone weirs and bank reinforcemenAllowing stone weirs and bank reinforcements to break down, removing or breaching weirs and reinforcements,, Installing large woody material,Encouraging tree growth and natural supply of large woody material,Engagement with a wide range of stakeholders - more planned.,ide range of stakeholders - more planned.,)
  • Case study:The Middle Ouse Restoration of Physical Habitats (MORPH)  + (Alteration in channel dimensions, Bank improvement, Weir removal, Rock ramp construction, Restoring gravel bed,,Creation of wet woodland, Control of invasive species,,Creation of fish passes, Meandering channel, ,,,)
  • Case study:Spring Meadow Meander Restoration  + (Alteration in channel dimensions, Bank improvement, Improvement of natural flows, Introducing large woody debris,,Creation of wet woodland,,Improvement of channel morphology, Meandering channel, ,Monitoring strategy,,,)
  • Case study:Stainby Road, Colsterworth  + (Bank Lowering, gravel and wood added,Ground water fed wetlands,In-set floodplains created, bend widening, bank reprofiling. ,Conservation grazing,,)
  • Case study:Pearls in Peril LIFE+ GB Project - River South Esk  + (Bank improvement, Bank reprofiling,,Riparian planting,, ,Land management,,Engagement with a wide range of stakeholders,,)
  • Case study:Mill house private hydroelectric power generation scheme and fish pass  + (Bank improvement, Bank stabilisation, Bank protection,,water meadow creation,Bypass channel, ,,,)
  • Case study:River Nene Nature Improvement Area  + (Bank improvement, Bank stabilisation, CreaBank improvement, Bank stabilisation, Creation of fish refuge areas, Fenced off riverbank, Habitat diversification,,Installing riverside fencing, Reduce diffuse pollution, Creation of backwaters, Installing riverside fencing, Riparian planting,,Creation of backwater, ,,,arian planting,,Creation of backwater, ,,,)
  • Case study:Elgin Flood Alleviation Scheme  + (Bank improvement, Channel reprofiling, Creation of berms, Depth variation,,Lowering of floodplain, Creation of wetland, Removal of embankments,,Creation of new channel, ,,Community Education, Community consultation,,)
  • Case study:SMURF Tame  + (Bank improvement, Channel reprofiling, Tree planting,,, ,,Improved public access,,)
  • Case study:River Tame in Perry Hall playing fields ("SMURF")  + (Bank improvement, Channel reprofiling,,, ,,Improved public access,,)
  • Case study:River Stour at Glen's weir (Throop fisheries)  + (Bank improvement, Creation of gravel deflectors, Creation of pools and riffles, Introduction of gravel,,, ,,,project undertaken with The Barbel Society and The Ringwood & Distric Angling Association)
  • Case study:River Fugla  + (Bank improvement, Introduction of gravel, Adding sinuosity, Bank stabilisation,,, ,,,)
  • Case study:Pearls in Peril LIFE+ GB Project - River Dee  + (Bank improvement, Removal of croys and embankments, Bed load addition,Riparian planting, Water margin fencing, ,Diffuse pollution mitigation,Raise awareness of the problems pearl mussels face among land managers and river users, Engagement with schools,,)
  • Case study:Removal of the Stalapos weir over the river Alagnon  + (Bank improvement, Weir removal, Bed reprofiling, Riverbank revegetation,,, ,,,)
  • Case study:Greenwich Peninsula  + (Bank improvement, creation of intertidal terraces,, ,,,)
  • Case study:Rheinauen bei Rastatt  + (Bank improvement, island restoration,reconnection of oxbow, ,,,)
  • Case study:River Rea Restoration Project  + (Bank improvement,,Barrier removal,, ,RiparBank improvement,,Barrier removal,, ,Riparian Management to increase the amount of light getting through the canopy, promote natural re-growth of bankside plants and increase levels of bank stability and stabilise the spread of Phytophthora amongst the Alders, reducing bank side collapse (another main source of sediment),,Integrated catchment management approach, Community engagement, Local supportroach, Community engagement, Local support)
  • Case study:Rams Brewery  + (Bank improvement,,Displacement of flood defenses,, SUDS, green roofs,,,Riverside walkway,,)
  • Case study:Rio Tepice urban restoration  + (Bank improvement,,Riparian planting, ,Management of paths,Public green area,Participation in monitoring)
  • Case study:Chambers Wharf  + (Bank improvement,,removal of jetty roosting posts, Brownfield land regeneration, green roofs, SUDS, nesting boxes,,Riverside walkway,,)
  • Case study:Knepp Rewilding Project  + (Bank modification, Re-profiling, Creation Bank modification, Re-profiling, Creation of low flow channel, Habitat restoration, Creation of low flow channel, Barrier removal, Creation of backwaters, Introducing large woody debris, Riverbed restoration,,Floodplain reconnection, Scrapes, Increase water retention area, Wetland habitat,,Channel realignment, Re-meandering, Enhancing flow diversity, Habitat restoration, Meandering channel, Selective removal of organic muds and sludge contaminated with toxic, Create more natural flow regime, Improvement of natural flows, Improving fish migration,,Flow management,,,proving fish migration,,Flow management,,,)
  • Case study:River Idle Restoration Project  + (Bank modification,Buffer strips, Tree planting,,Introducing large woody debris, ,,Engagement with a wide range of stakeholders - more planned.,,Survey work)
  • Case study:River Wensum Restoration, Reach 10 Lenwade  + (Bank reprofiling, Bank stabilisation, Bed reprofiling,,Tree management,,Brushwood berms to increase scour on the gravels, Introducing large woody debris, ,,,)
  • Case study:Unit 1b - Long Bridge to Downstream of Louds Mill  + (Bank reprofiling, Bed reprofiling,,Riparian planting,,Introducing large woody debris, Cleaning of spawning gravels,,,,)
  • Case study:Valentines Park  + (Bank reprofiling, Deculverting,, ,,,)