Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:LIFE+ “Sipontine Wetlands” + (,Riparian habitat restoration, Wetland habitat, Restoration of riparian marshes,, ,,,)
- Case study:Cuckolds Haven Nature Area + (,Riparian planting,, ,,Viewing platform, Wheelchair access, Interpretation boards,)
- Case study:Borova Stream and its Revitalisation + (,Riparian planting,,Meandering channel, ,,,)
- Case study:Reppisch + (,Riparian planting,Channel widening ,,,)
- Case study:Cumbria River Restoration Program - Whitbeck restoration project - West Cumbria + (,River channel diversion, Floodplain reconnection, Habitat creation,, Tree planting,,,,)
- Case study:Glaisdale Beck diversion scheme + (,River channel diversion,, ,,,)
- Case study:River Leith Restoration Project, Thrimby, Penrith, Cumbria + (,River naturalisation, Remeandering,, ,,,Work with farmers and land managers, Survey work,)
- Case study:Petersham Meadows + (,Scrapes, ,,,)
- Case study:Bird reserve “Riet Vell” (Tarragona) + (,Stablish crops of ecologic rice, regenerate habitats of wetlands enviroments, recover local vegetation and conserve aquatic birds, ,,Sensitization, awareness campaigns and elaboration of dissemination materials,Advice from farmers)
- Case study:Day Brook Rain Gardens + (,Sustainable urban drainage ponds (SUDs),, ,,Awareness raising,,)
- Case study:Alma Road Rain Gardens + (,Sustainable urban drainage ponds (SUDs),, Rain gardens,,,)
- Case study:Colne Brook + (,Tree management, ,,,)
- Case study:Parks between A10 and Melville Gardens + (,Tree management, ,,,)
- Case study:Cray River Enhancement + (,Tree management, ,,,)
- Case study:Three Bridge, Kingston + (,Tree management, ,,,)
- Case study:Barnes Common improvements + (,Tree management, Riparian planting, mowing regime,Reedbed creation, Flow deflectors, ,,,)
- Case study:King Georges Playing Field + (,Tree management,Creation of backwater ,,,)
- Case study:Medland Close, River Wandle + (,Tree management,Creation of pools and riffles ,,,)
- Case study:River Gaywood – Seven Sisters Drain + (,Vegetation management, Restoring riparian vegetation, Large scale planting of native species,,Improvement of channel morphology, Channel naturalisation, ,,,)
- Case study:Manor Park + (,Vegetation management,, ,,Citizen participation in the restoration project, Awareness raising,,Participation in works,)
- Case study:Traditioneel Beekherstel Koffiegoot + (,Vermoerassing/de beek het bos ingestuurd, ,,,)
- Case study:Force Crag Mine Remediation + (,Vertical flow pond which uses compost, limestone and woodchips to remove metals from the water without the need for added energy or chemicals, ,,,)
- Case study:Buiten Ooij + (,Water release into floodplain in winter,Closing of sluice in summer,Future floodplain lowering,Creation of side channel, ,more natural reservoir releases,,)
- Case study:Minsterley Brook Abandoned Metal Mines + (,Water treatment methods,, ,Walkover surveys and water sample data collection,,,Ecological survey,)
- Case study:River Seaton: Abandoned Metal Mines + (,Water treatment methods,, Improving water quality,,,,)
- Case study:Oasi naturale delle pittime di Cascina Oschiena + (,Wetland restoration, ,,,)
- Case study:LIFE+ Traisen + (,Within the construction process the river was extended by 7.6 kilometres and the estuary of the Traisen River was relocated, ,,,)
- Case study:LIFE Charcos - Conservação de Charcos Temporários na Costa Sudoeste de Portugal (Conservation of Med Temporary Ponds in SW Portugal) + (,conservation and restoration of ponds, ,CTM management guidelines,conservation and restoration of ponds for public awareness,)
- Case study:INTERREG MED WETNET – Negotiated Planning Agreement “Wetland Contract of the Caorle lagoon system” + (,ensuring the hydraulic protection of the … ,ensuring the hydraulic protection of the area from the risk of flooding and sediment from the canals, as well as from the upstream inputs, ,defining and recognizing a "representative institutional model" of single reference for the coordination of the various actors, by stimulating and activating actions for the management, protection, in the Caorle lagoon system; establishing an operational programme that takes account of all components of the system, through an integrated approach capable of restoring lagoon dynamics, ensuring and consolidating the protection, promotion and development of the wetland area,,creating a network of meters to monitor all the data needed to define and know the current lagoon dynamics, in order to plan and plan the interventions on an extended and integrated knowledge base; consolidating and/or promoting instruments and actions for the protection and enhancement of the territory, as well as for the protection of habitats as well as for the protection of habitats)
- Case study:Sussex Flow Initiative + (,establishment of woodland,, ,,,)
- Case study:Investigating the impact of upland conifer afforestation on catchment hydrology at Coalburn, northern England + (,establishment of woodland,, ,,,)
- Case study:Inspiring Water Action in the Torne (iWAIT) + (,establishment of woodland,, ,,,)
- Case study:Investigating the Impacts of Upland Land Use Management on Flood Risk at Pontbren, Wales + (,establishment of woodland,, ,,,)
- Case study:Investigating the impact of floodplain woodland on flood flows in the River Cary catchment, Somerset + (,establishment of woodland,, ,,,)
- Case study:Investigating the interaction between semi-natural floodplain woodland and flood flows at Great Triley Wood + (,establishment of woodland,, ,,,)
- Case study:Brackenhurst Natural Flood Management + (,establishment of woodland,, Runoff pathway management,,,)
- Case study:3Rivers - Lumburn:Walkham:Tavy + (,floodplain woodland planting,, ,Land management,,Volunteer engagement,,Survey work,)
- Case study:River Soar Floating Pennywort Eradication + (,herbicide spraying, Removal of invasive plants,, ,aerial sureys,,)
- Case study:INTERREG MED WETNET - Memoradum on Participation in Wetland Conservation in Ljubljansko Barje Nature Park + (,mowing, adapted to the conservation of sp … ,mowing, adapted to the conservation of species and habitat types; adequate maintenance of borders and green belts (selective logging, preservation of trees, maintaining adequate width of green belts along ditches and watercourses), building of tourist infrastructure, which will provide a targeted visit;,control of drainage of water from secondary arrester to main dams (river) with locks; control of drainage of water from tertiary arrester; coordinated maintenance of ditches; control of the use of fertilizers and preservatives on agricultural land; respect of the prohibition of the meadows plowing from the KPLB Regulation (also for organic farmers); establishing a zoning of individual subregions where priorities are defined in cooperation with land owners and managers of the protected area and NATURA 2000 (KPLB and ZRSVN); payment for the implementation of the adjusted use on agricultural land,awareness of stakeholders on the importance of adequate maintenance of the arrester;,establishment of monitoring of qualifying species and habitat types; prepare an analysis of the development possibilities and the restructuring plan for individual agricultural holdings in cooperation with agricultural institutions and with the financial support of agricultural policy; designing common tourism products; joint marketing of products;ism products; joint marketing of products;)
- Case study:INTERREG MED WETNET – Memorandum of Understanding for the realization of the Wetland Contract for the Vercelli rice plain + (,protecting and increasing biodiversity, i … ,protecting and increasing biodiversity, improving the landscape and the quality of water resources, ,Custody agreements,,Development of environmentally sustainable rice farming, to the increase of soft tourism and to the increase of citizens' awareness of environmental issues.tizens' awareness of environmental issues.)
- Case study:Afon Merin Natural Process Restoration + (15 leaky dams and scrapes.,, ,,,)
- Case study:Gadebridge park river restoration + (1:3 and 1:6 banks, Introduction of spawnin … 1:3 and 1:6 banks, Introduction of spawning gravels, Creation of pools and riffles, creation of buffer zones, Creation of low flow channel, gravel river access point, preservation of historic mill leat,Creation of multi stage channel, Improving fish migration, Lowland meadow, Maintenance of riparian vegetation, Introduction of spring flow, New ultrasonic gauging station,Improvement of channel morphology, Improving fish migration, restoring more sinuous planform Introduction of 2 foot bridges,,Engagement with a wide range of stakeholders, 2 events in the park, Junior river wardens programme, school visits, tours and presentations for local interest groups, social media video, Information boards, mailing list, project website, project mailbox, community satisfaction survey,Ecological survey, Monitoring via Fixed Point Photography, Climate change adaptation, Definition of environmental objectives and indicators and monitoring program., Removal of Stevenson Stones for display., Removal of Stevenson Stones for display)
- Case study:Effacement du seuil de Chelles Basse sur le Miodet + (Abundant sand was being put on the banks, Barrier removal, Blocks were used to diversify the flow,, ,Cutting trees that could be a potential danger, Setting up of a diversion channel,,,)
- Case study:PHish - Powys Habitat Improvement Scheme + (Acidic water amelioration, Creation of fish passes,,, Fish stocking,,,)
- Case study:Environmental Restoration of the Lower Section of the Bembézar River and its River Environment (Phase 1) + (Actions to improve the natural environment … Actions to improve the natural environment: Cleaning of the riverbed and the riverbank; Removal of dead vegetation and cleaning of rubbish.,Actions to improve the natural environment: Restoration of the autochthonous riverside vegetation in the sections in which the reedbed is present. It is responsible for the degradation of the autochthonous vegetation, in an area which should be a riverside forest with species closer to the ecological climax; Removal of ailanthus and other invasive exotic species., ,,Actions of integration in a river area: Construction of a pedestrian path 2 meters wide and 3,080 meters long along the riverside forest of the Bembézar River; Construction of a footbridge over the river and improvement of difficult passageways along the path. Improvement of infrastructures for public use: Cleaning of vegetation of the existing Medieval Bridge in the Bembézar riverbed.,Medieval Bridge in the Bembézar riverbed.,)
- Case study:Wyndham Park, Grantham + (Adding Gravel, Berm Creation, tree management,, Public access to river,,,)
- Case study:Rottal Burn + (Adding sinuosity, Decrease sedimentation, Bank reprofiling,,Floodplain reconnection, Removal of embankments,,Adding sinuosity, Channel widening, ,,,)
- Case study:River Dearne at Mexborough + (Adding sinuosity,,Creation of backwaters,,Channel narrowing, Creation of backwater, ,Reduced maintenance,,,)
- Case study:River Wid restoration scheme + (Adding sinuosity,,Floodplain reconnection,,Channel narrowing, ,,,)
- Case study:Restoration of Myllypuro brook + (Adding sinuosity,,Re-instatement of old course ,,,)
- Case study:Restorations of Ritobäcken brook + (Adding sinuosity,Re-introducing stones, Introduction of gravel,,, ,,,)