Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Roe and Ive + (Land management)
- Case study:Rookery Brook Pollution Prevention Project + (Land management)
- Case study:Hills to Levels + (Soil managment and land use to improve infiltration and water quality)
- Case study:Gunnerside Gill: Abandoned metal mines + (Catchment Characterisation Programme)
- Case study:The Irfon Special Area of Conservation Project + (Stocking)
- Case study:Lugg & Arrow, Radnorshire + (Supporting local fisheries through marketing initiatives)
- Case study:Improving the Conservation Status of Freshwater Pearl Mussel Targeting the Clun SAC and Upstream Waters + (Livestock exclusion)
- Case study:Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot + (The banks are maintained if necessary by vegetal engineering)
- Case study:Retour dans son talweg d’origine de la Souffel à Reichstett et création de mares + (The banks are not not stabilized in order to let the stream create its preferential flow channel and facilitate overflows in the meadow with each rising water)
- Case study:Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas + (The level of the water bodies is lowered during two months in summer and are completely drained every three to five years.)
- Case study:Salmonid, coarse fish and wetland bird habitat and flood plain linkage project, Hampshire Avon + (The project enhanced 300m2 of riffle gravel salmonid spawning habitat at 9 sites.The project also carried out an additional 100m2 of gravel cleaning.)
- Case study:Reméandrage de la Veyre en amont du lac d’Aydat + (Before the works)
- Case study:Effacement partiel de cinq seuils sur le ruisseau du Bagas + (The work was carried out dry by temporary diversion of the watercourse (cofferdam)
- Case study:Bird reserve “Las Marismas Blancas” (Cantabria) + (Town hall workers)
- Case study:Bird reserve “Finca San Miguel” (Huesca) + (Grants from the Administration)
- Case study:Tittesworth Catchment Project + (Training events)
- Case study:River Alt at Knowsley + (Tree management works and re-opening of choked side channels is planned as part of 'Knowsley 2020' project. The site would have benefited from a long term tailored management plan.)
- Case study:Rookhope Burn: Abandoned Metal Mines + (Trials)
- Case study:LakeAdmin - Chadwick lakes - Plan to improve the surface water quality and reservoir restoration in the Chadwick lakes area + (Vegetation management plan;)
- Case study:Minsterley Brook Abandoned Metal Mines + (Walkover surveys and water sample data collection)
- Case study:Love My River + (Walkover surveys and water sample data collection)
- Case study:Sediment Pathways Project + (Walkover surveys and water sample data collection)
- Case study:Healthy Rivers + (Walkover surveys and water sample data collection)
- Case study:Isar-Plan + (Waste management)
- Case study:Revitalisation of Nagy-Pándzsa watersystem + (Watersupply for Natura 2000 habitats)
- Case study:Voorste Nete at Dessel + (Weed clearance)
- Case study:Parish Wood Park + (Woodland management)
- Case study:Ironbridge Farm + (Woodland management)
- Case study:Reméandrage de la Veyre en amont du lac d’Aydat + (Before the works)
- Case study:INTERREG MED WETNET- Albufera de Valéncia Memorandu of Cooperation for Wetland Contract + (Improvement of agri-environmental practice … Improvement of agri-environmental practices; Establish a protocol for the use of the ditches of the Sueca Irrigators Community to connect the Sueca irrigation system to the lagoon out of the rice growing season; The approval of the legal management instruments: plans related to the Water Framework Directive (Júcar River Basin Plan) and the Nature Directives (Natura 2000 SAC); the maintenance of the productivity of the agricultural system and the actions to deal with salinization and the negative effects of climate change on cropsegative effects of climate change on crops)
- Case study:Rétablissement de la continuité écologique sur la Luire + (Occasionally)
- Case study:River Soar Floating Pennywort Eradication + (aerial sureys)
- Case study:River Don Restoration project + (Misconnections campaign)
- Case study:Watercress Farm Rewetting Project + (Confined works traffic to designated haul road routes to minimize impact on local habitats and species)
- Case study:INTERREG MED WETNET – Memorandum of Cooperation towards a Wetland Contract for the Island of Gozo + (Preserve and store more water)
- Case study:INTERREG MED WETNET – Negotiated Planning Agreement “Wetland Contract of the Caorle lagoon system” + (defining and recognizing a "representative institutional model" of single reference for the coordination of the various actors)
- Case study:Blanice River + (bypass maintenance)
- Case study:La Gotera dam removal + (capture of fish prior to the works)
- Case study:River Gelsa at Bevtoft + (ceased maintenance regime)
- Case study:Rehabilitation of Benta stream + (channel maintenance)
- Case study:INTERREG MED WETNET - Memoradum on Participation in Wetland Conservation in Ljubljansko Barje Nature Park + (control of drainage of water from secondar … control of drainage of water from secondary arrester to main dams (river) with locks; control of drainage of water from tertiary arrester; coordinated maintenance of ditches; control of the use of fertilizers and preservatives on agricultural land; respect of the prohibition of the meadows plowing from the KPLB Regulation (also for organic farmers); establishing a zoning of individual subregions where priorities are defined in cooperation with land owners and managers of the protected area and NATURA 2000 (KPLB and ZRSVN); payment for the implementation of the adjusted use on agricultural landn of the adjusted use on agricultural land)
- Case study:Bird Reserve “Tancat de la Pipa” (Valencia) + (Channels)
- Case study:TerraSeixe + (definition and implementation of good management practices that ensure the conservation of biodiversity and the restoration of ecosystems in the context of emerging global change)
- Case study:The San Marcos weir removal + (Materials removed from the weir were used to fill the pool produced downstream the weir)
- Case study:LIFE RISORGIVE – Bacino Castellaro + (Contract of Resurgences (multilevel governance tool))
- Case study:INTERREG MED WETNET – Melides Lagoon Environmental Agreement for Wetland Contract + (Creation of a fishing reserve and legal establishment of a recreational fishing zone in the Melides Lagoon; Creation of a local multi-stakeholder association - agriculture)
- Case study:Removing a weir and renaturalising the Iton River on the Plis industrial site in Hondouville + (extension of water treatment outlet)
- Case study:Upper River Nairn restoration project + (Riparian tree planting)
- Case study:Timber float restorations at River Iijoki + (fish stockings)
- Case study:INTERREG MED WETNET – Management Plan for the Cañizar Lagoon (ARAGON) + (Environmental integration measures and agricultural uses; Environmental integration measures and livestock uses; Environmental integration measures and tourism uses; Environmental integration measures and public uses (hunting)
- Case study:LIFE RISORGIVE – Roggia Tergola Sud + (Contract of Resurgences (multilevel governance tool); engagement of farmers (agreements of collaboration in the management of the intervention)
- Case study:LIFE RISORGIVE – Fontane Marzare + (Contract of Resurgences (multilevel governance tool); engagement of farmers (agreements of collaboration in the management of the intervention)