Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Broadwater Brook + (Agricultural business changed its way of working)
- Case study:Bird reserve “Los Albardales” (Madrid) + (Monitoring the species of birds)
- Case study:Adaptive management of hydraulic structures in the Sèvre nantaise and Thouet basins + (More natural reservoir releases)
- Case study:Beneden-Leeuwen-Side channel + (More natural water retention)
- Case study:Černý potok stream restoration scheme + (Management of vegetation)
- Case study:Stroud Rural Sustainable Drainage Project + (Fencing)
- Case study:South Esk restoration + (More sensitive channel maintenance)
- Case study:Test and Itchen River Restoration Strategy + (More sensitive channel maintenance)
- Case study:Old Station Beat restoration, River Test at Bossington + (More sensitive channel maintenance)
- Case study:River Skerne- Life project + (More sensitive floodplain maintenance)
- Case study:Soest - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort + (More sensitive floodplain maintenance)
- Case study:Lippeaue Klostermersch + (More sensitive grazing)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (Quiet zone establishment (fishing is forbiden)
- Case study:Hierdense Beek + (Mowing management)
- Case study:River Bure + (No longer remove naturally occurring LWD)
- Case study:Diffusing the Issue in rural Ribble + (Fencing)
- Case study:The Pow Beck Improvement Project + (Non/agricultural business changed its way of working)
- Case study:Taw River Improvement Project – Taw Access over Weirs + (Fencing)
- Case study:Upper Welland Water Friendly Farming Project + (Fencing)
- Case study:Improving water quality in Loweswater + (Non/agricultural business changed its way of working)
- Case study:Diffusing the Issue in rural Ribble - Swanside + (Fencing)
- Case study:Wye Herefordshire Improvement Project + (Fencing)
- Case study:Rétablissement de la continuité écologique sur la Luire + (Occasionally)
- Case study:Glenbrook Wetlands + (Opening of tree canopy to encourage varied ground flora)
- Case study:Houndsden Road Rain Gardens + (Opening of tree canopy to encourage varied ground flora)
- Case study:Gunnerside Gill: Abandoned metal mines + (Options for remediation)
- Case study:Gategill Beck: Abandoned Metal Mines + (Clean up pollution with Defra funding)
- Case study:Ontpoldering Noordwaard + (Placing buildings on terps)
- Case study:Welland for People and Wildlife Project + (Planting wildflower mixes)
- Case study:Chinbrook Meadows Wetlands + (Planting wildflower mixes)
- Case study:Réduction de l’impact de trois étangs sur cours d’eau dans le bassin du Cousin + (Plots adjacent to streams are managed extensively. Farmers have contracted agri-environmental measures prohibiting the amendments.)
- Case study:Effacement partiel du seuil de Vas sur le Céans + (Preservation of side walls to prevent erosion)
- Case study:INTERREG MED WETNET – Memorandum of Cooperation towards a Wetland Contract for the Island of Gozo + (Preserve and store more water)
- Case study:Rookhope Burn: Abandoned Metal Mines + (Trials)
- Case study:Restoring the River Doquette to its original bed + (Promoting riparian vegetation)
- Case study:Ironbridge Farm + (Ensuring biodiversity)
- Case study:River restoration project in Sella, Asturias + (Promotion and management of tourism in the river)
- Case study:Environmental restoration of the lower section of the river Narcea in the municipalities of Salas and Pravia (Asturias) + (Promotion and management of tourism in the river)
- Case study:Strengthening associated biodiversity of habitat 92A0 and control of Invasive Alien Species in the Segura River (LIFE + Ripisilvanatura) + (Management of undesirable plant species)
- Case study:LIFE Segura Riverlink (Through rivers) + (Management of undesirable plant species)
- Case study:Conservation of alluvial + (Protection of the island)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (Quiet zone establishment (fishing is forbiden)
- Case study:Effacement du seuil de Carayon sur le Thoré + (Realization of an electric fishing of backup)
- Case study:Route water: environmental restoration project for tourist use + (Recovery of the old mill)
- Case study:Source to Sea Programme – 11. River Rawthey + (Reduce diffuse water pollution and over-grazing)
- Case study:River Nent: Abandoned Metal Mines + (Reduce diffuse water pollution and over-grazing)
- Case study:Stroud Rural Sustainable Drainage Project + (Fencing)
- Case study:Vallacuera Ravine. Removal of a dyke + (Reduce the risk of flooding downstream)
- Case study:Rijkelse Bemden - River bed widening + (Reduced dredging)
- Case study:River Restoration at Hunworth (River Glaven) + (Reduced maintenance)
- Case study:River Dearne at Mexborough + (Reduced maintenance)