Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Kennet Restoration at Durnsford + (Management of organic and inorganic sediments)
- Case study:Haltwhistle burn; a total catchment approach + (Management of organic and inorganic sediments)
- Case study:Rio Tepice urban restoration + (Management of paths)
- Case study:Strengthening associated biodiversity of habitat 92A0 and control of Invasive Alien Species in the Segura River (LIFE + Ripisilvanatura) + (Management of undesirable plant species)
- Case study:LIFE Segura Riverlink (Through rivers) + (Management of undesirable plant species)
- Case study:Reopening of a section of the River Bièvre in an urban environment + (Management of vegetation)
- Case study:Restoring the river continuity of the Bresle River by returning it to its original bed in Sénarpont + (Adjusting discharges and creating a monophogenetic discharge)
- Case study:LIFE Saramugo + (Implementation of a Nature Custody network for the Saramugo)
- Case study:The San Marcos weir removal + (Materials removed from the weir were used to fill the pool produced downstream the weir)
- Case study:River Don Restoration project + (Misconnections campaign)
- Case study:Valtellina 2005 – New green system + (Monitoring strategy)
- Case study:Timber float restorations at River Iijoki + (fish stockings)
- Case study:HPP Blanca + (Monitoring strategy)
- Case study:Skjern River Project + (Monitoring strategy)
- Case study:River restoration in the irrigation area Lobón (Badajoz) + (Monitoring strategy)
- Case study:Mayesbrook Climate Change Park restoration project + (Fencing)
- Case study:Černý potok stream restoration scheme + (Management of vegetation)
- Case study:Conservation strategies for forest and wild river in Gesaeuse: the River Enns restoration + (Monitoring strategy)
- Case study:Spring Meadow Meander Restoration + (Monitoring strategy)
- Case study:Beverley Brook Flow control structures + (Modelling)
- Case study:Improving conservation condition of the National Trust managed river test SSSI + (Monitoring strategy)
- Case study:Healthy Rivers + (Walkover surveys and water sample data collection)
- Case study:Letting the Dove Flow 2 + (Monitoring strategy)
- Case study:Broadwater Brook + (Agricultural business changed its way of working)
- Case study:Bird reserve “Los Albardales” (Madrid) + (Monitoring the species of birds)
- Case study:Adaptive management of hydraulic structures in the Sèvre nantaise and Thouet basins + (More natural reservoir releases)
- Case study:Beneden-Leeuwen-Side channel + (More natural water retention)
- Case study:Černý potok stream restoration scheme + (More natural water retention)
- Case study:Stroud Rural Sustainable Drainage Project + (More natural water retention)
- Case study:South Esk restoration + (More sensitive channel maintenance)
- Case study:Test and Itchen River Restoration Strategy + (More sensitive channel maintenance)
- Case study:Old Station Beat restoration, River Test at Bossington + (More sensitive channel maintenance)
- Case study:River Skerne- Life project + (More sensitive floodplain maintenance)
- Case study:Soest - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort + (More sensitive floodplain maintenance)
- Case study:Lippeaue Klostermersch + (More sensitive grazing)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (Quiet zone establishment (fishing is forbiden)
- Case study:Hierdense Beek + (Mowing management)
- Case study:River Bure + (No longer remove naturally occurring LWD)
- Case study:Diffusing the Issue in rural Ribble + (Fencing)
- Case study:The Pow Beck Improvement Project + (Non/agricultural business changed its way of working)
- Case study:Taw River Improvement Project – Taw Access over Weirs + (Fencing)
- Case study:Upper Welland Water Friendly Farming Project + (Fencing)
- Case study:Improving water quality in Loweswater + (Non/agricultural business changed its way of working)
- Case study:Diffusing the Issue in rural Ribble - Swanside + (Fencing)
- Case study:Wye Herefordshire Improvement Project + (Fencing)
- Case study:Rétablissement de la continuité écologique sur la Luire + (Occasionally)
- Case study:Glenbrook Wetlands + (Opening of tree canopy to encourage varied ground flora)
- Case study:Houndsden Road Rain Gardens + (Opening of tree canopy to encourage varied ground flora)
- Case study:Gunnerside Gill: Abandoned metal mines + (Catchment Characterisation Programme)
- Case study:Gategill Beck: Abandoned Metal Mines + (Clean up pollution with Defra funding)
- Case study:Ontpoldering Noordwaard + (Placing buildings on terps)
- Case study:Welland for People and Wildlife Project + (Planting wildflower mixes)
- Case study:Chinbrook Meadows Wetlands + (Planting wildflower mixes)