Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:WHIP - The Wye Habitat Improvement Project + (Marsh-Smith)
- Case study:The Umbusi River + (Martin)
- Case study:Onga River + (Martin)
- Case study:Rétablissement de la continuité écologique sur la Luire + (Martin)
- Case study:Arborfield nature like bypass and weirs project + (Martyn)
- Case study:Environmental restoration of the lower section of the river Narcea in the municipalities of Salas and Pravia (Asturias) + (Martín Ventura)
- Case study:Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia ) + (Martínez García)
- Case study:Off-Channels Restauration + (Masset)
- Case study:Reméandrage de la Veyre en amont du lac d’Aydat + (Mathevon)
- Case study:Bow Brook Floodplain Restoration + (Matthews)
- Case study:The Verdier marshes + (Mauclert)
- Case study:Langford Lakes project + (Maxwell)
- Case study:Moreton Channel Gravel Reprofiling + (Maxwell)
- Case study:River Frome Rehabilitation Plan + (Maxwell)
- Case study:Unit 1b - Long Bridge to Downstream of Louds Mill + (Maxwell)
- Case study:Unit 4 - North Channel Phase 1 + (Maxwell)
- Case study:Louds Mill (Downstream)m Enhancement + (Maxwell)
- Case study:Woodsford Channel + (Maxwell)
- Case study:Martins River Island + (Maxwell)
- Case study:Lower Woodsford + (Maxwell)
- Case study:Hurst Bridge (downstream) + (Maxwell)
- Case study:North Channel Upper Reach + (Maxwell)
- Case study:2e Lower Woodsford River and Floodplain Enhancement + (Maxwell)
- Case study:River Avon Restoration Project + (Maxwell)
- Case study:Unit 3a – Hurst Bridge 2013 + (Maxwell)
- Case study:Effacement partiel de cinq seuils sur le ruisseau du Bagas + (Maynadie, Ramadier)
- Case study:Markeaton and Mackworth Brook (MMB) Project + (Mayson)
- Case study:Source to Sea Programme – 9. Kent, Leven and Duddon Estuaries beach cleans and volunteer ambassadors + (McColm)
- Case study:Avon Barriers Project + (McCulloch)
- Case study:Avon Barriers Project: Ferengair Weir + (McCulloch)
- Case study:Soaring connections: restoring people, wildlife & place + (McDonald)
- Case study:Roe and Ive + (McIlwraith)
- Case study:Padgate Brook River Restoration - part of the Warrington FRM Scheme + (McIlwrath)
- Case study:INTERREG MED WETNET – Melides Lagoon Environmental Agreement for Wetland Contract + (Mendonça)
- Case study:Creation and restoration of a riparian zone + (Mendoza)
- Case study:Vallacuera Ravine. Removal of a dyke + (Mendoza)
- Case study:Restoration of riparian zone in Aragon River + (Mendoza)
- Case study:RSPB Blean Meander Restoration + (Merriman)
- Case study:Démantèlement de l’ouvrage du Pont Fourneau sur la Selle + (Meunier)
- Case study:Restoring the river continuity of the Bresle River by returning it to its original bed in Sénarpont + (Michel)
- Case study:The Bulgarian Wetlands Restoration and Pollution Reduction Project + (Mihailov)
- Case study:Watercress Farm Rewetting Project + (Miller)
- Case study:Limestone Ribble Restoration Project + (Milne)
- Case study:River Avon Our Water Environment + (Milner)
- Case study:Small Retention - Big Deal, A National Program on Natural Small Water Retention Measures + (Mioduszewski, Okruszko)
- Case study:Gottar Water weir fish barrier easement + (Mitchell)
- Case study:Creamery Weir fish barrier easement + (Mitchell)
- Case study:Restoration, protection and sustainable development of protected area "Zlato pole" + (Mitkov)
- Case study:Restoration and conservation of riparian forests - habitats of European conservation importance on the territory of Dimitrovgrad municipality + (Mitkov)
- Case study:Mains of Dyce + (Moir)
- Case study:Bird reserve “Los Albardales” (Madrid) + (Molina)