Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Lessons learnt" with value "To add". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • Case study:Louds Mill (Downstream)m Enhancement  + (The technique of installing Large Woody DeThe technique of installing Large Woody Debris at this site involved digging a trench securing up to a third of the limb in the trench with the remaining in the channel. By using the thicker end of the limb in the trench it left only the thinner branches in the river.</br></br>Ideally the wood shoul dbe as large as possible when in the river to ensure it will be long lasting and have as big an impact on the flows lcoally as possible.n impact on the flows lcoally as possible.)
  • Case study:Pearls in Peril LIFE+ GB Project - River South Esk  + (The timescales involved from conception to completion were longer than anticipated. The site presents a range of environmental sensitivities and land uses that required further consideration as part of the planning and physical works processes.)
  • Case study:BALLYMONEY RIVERSIDE PARK RESTORATION PROJECT  + (The value of a multi-benefit scheme, through joint funding and agreed outcomes. The value of good PR and information from an early stage in project development.)
  • Case study:North Devon Riverlands  + (The video summarising project work so far can be seen on YouTube: https://www.youtube.com/watch?v=1TcxL3JD6UQ&t=153s)
  • Case study:Grovelands Park Wetlands  + (The wetland basin is quite large, sized foThe wetland basin is quite large, sized for greater flows than have been experienced so far. This means that the water in the treatment basin overflows only during very heavy rainfall events. This is not a significant problem, it just means that the basin is acting more as an infiltration basin rather than a temporary storage basin. The system still functions to prevent polluted water entering the stream. </br></br>The plug planted sedges in the basin are thriving in this environment as the system was not fully activated until the plants were well established. However in the more shaded swales with greater velocity of flows and concentration of pollution the plugs have failed and need to be replanted. </br></br>Sedges have grown lush and verdant in the basin and water is cleaned and returned to the stream as expected or returned to the water table. Although perhaps not as aesthetically pleasing as in the design, the boulder arrangement at the head of the swales has worked well to slow water and prevent excessive erosion in the swales. </br></br>Water quality issues were far more significant than we had anticipated on commencement of the project, particularly in relation to domestic misconnections. High pollutant levels were evident beginning of our swales. We also found that although we proved our systems had a beneficial impact on water quality, just downstream of each project were outfalls which would bring in yet more pollutants. Therefore wetlands and SuDS alone could not demonstrate catchment level water improvements needed under WFD. Small scale interventions have a place in a suite of wider measures that need to be tackled with more drive, especially pollutant impacts from misconnections and vehicle use.pacts from misconnections and vehicle use.)
  • Case study:Lowering the weir of the Houël mill on the Leff River  + (The wide-ranging discussions held at the sThe wide-ranging discussions held at the start of the project served to reconcile the different expectations and to allay the concerns of users. The solid technical feasibility study and the realistic impact assessment facilitated the acceptance of the project by all stakeholders and local residents.t by all stakeholders and local residents.)
  • Case study:Upper River Nairn restoration project  + (The work has resulted in rapid evolution oThe work has resulted in rapid evolution of the site to a condition of improved physical heterogeneity (in-channel and wetland areas), with associated ecological responses. This has also resulted in a general aesthetic improvement, from a very simple canalised, embanked and perched channel to one that is much more physically variable, natural-looking and connected with standing water features (i.e. wetlands). The planting of trees in the riparian zone also benefits the site in this regard.</br></br>A practical benefit of the works was the improved protection of key areas of farming land from local flood risk. This was achieved through the removal of embankments on river right, permitting greater floodplain connectivity (with associated physical/ ecological benefits) to the east/ south of the channel while reducing pressure on the opposite bank. Furthermore, the implemented works greatly improved agricultural drainage; the bed of the restored channel was over 1 m lower than the previously perched condition, meaning that field drains could flow freely where they had previously been backed-up. Although not a primary objective of the project, considering these design objectives was essential to achieving buy-in by the local farmer.</br></br>There are also more general Natural Flood Management (NFM) benefits of the project. With greater floodplain/ wetland connectivity, there is greater inundation of areas adjacent to the channel under certain flood magnitudes. The storage of water in such areas will provide an increased level of protection to downstream areas. Furthermore, the re-establishment of native woodland will also contribute to NFM, adding roughness to the floodplain (slowing flows and increasing water storage times) and increasing the interception of water (surface flow and rainfall) through slowing flows and water absorption. Through such processes, the works will provide greater resilience to the effects of climate change. This is also the case for drought conditions; the previously homogenous condition of the channel has been replaced with a much more diverse morphology (particularly considering the wetland areas) that provides far greater potential for biotic refugia.</br>The work has generally improved the understanding of the benefits of such projects and the appropriate methods of their delivery. This has been a key case study for this type of work for SEPA and, with monitoring ongoing, dissemination of information will provide an invaluable resource to the wider river restoration community. </br></br>Given the explicit development of an integrated steering group and the associated project management approach, challenges during the project were minimised. Also, experience from previous construction projects by the design/ build team meant that many potential issues were avoided. There was careful planning of the construction phase of the project such that the most intrusive works (i.e. construction of the realigned channel and large wood implementation) were conducted ‘offline’, minimising the risk of high flow events impacting the works and fine sediment pollution. Such ‘assisted recovery’ designs explicitly require a degree of ‘field fitting’, allowing for unexpected issues encountered to be managed through appropriate short notice design variations. This was the case in the furthest downstream section of the site where, due to wet ground, it was not safe for construction machinery to excavate the initially proposed realigned channel in this area. It was therefore decided that the proposed design be modified such that the third (furthest downstream) wetland feature would be instated through this ~200 m long section, subsequently proving to be an appropriate revision. Such a short notice adjustment was only possible due to the close and established working relationship between the designer, regulator (i.e. SEPA) and contractor.ner, regulator (i.e. SEPA) and contractor.)
  • Case study:Habitat Enhancements, River Glaven at Wiveton, Norfolk  + (The work was carried out by a joint NRT/RGFA work party which enabled sharing of expertise between the two parties.)
  • Case study:Kensworth Quarry Chalk Pit Restoration  + (There are no lessons learnt as yet. We are keen to get insights from any similar projects targeting river flow restoration/support through perched reservoirs derived from upland mining operations.)
  • Case study:Ironbridge Farm  + (There are some significant limitations to There are some significant limitations to Manning's equation, especially in waters that are heavily impounded as most Essex rivers are. This means that any attempts to use this equation to work out the flow and height of the water is limited, this adds a degree of complication to any water height and flow calculations. If this is the case, then water heights from specific days or contact with the local EA hydrologist is recommended to allow real time calculations to be taken at times of known flow.ations to be taken at times of known flow.)
  • Case study:Bocking Blackwater River Restoration  + (There is significant Archaeological intereThere is significant Archaeological interest on the site. With an identified Roman Villa remains in the local area. This adds a significant cost element to the project. Investigations are currently underway to identify the implications for this project but this may make the pond and wetland enhancement uneconomic. Early contact with the local Archaeological unit is recommended. local Archaeological unit is recommended.)
  • Case study:Herinrichting beekdal Tongelreep  + (These measurements show the potential of sThese measurements show the potential of stimulating the origination of gravel beds. Actively introducing gravel would be a technological approach, which may be undesirable. If gravel is already naturally present in the stream, extra gravel may be added, but otherwise, a Building with Nature approach is considered more desirable.</br></br>Flow velocity variation can also be stimulated by main channel mowing or by introducing dead wood. When there is insufficient space for these natural measures, (as is the case for the Tongelreep), introducing gravel is an option. Providing sufficient shade over the gravel area is important.t shade over the gravel area is important.)
  • Case study:River Idle Restoration Project  + (This has been a 3-year project. The partnership has taken that time to become established with clear objectives for the future. Partnerships of this size do take time.)
  • Case study:Prologis Midpoint Park river restoration scheme  + (This has demonstrated that river restoratiThis has demonstrated that river restoration can be achieved by private developers as a cost-effective mitigation measure. The construction cost of the scheme, mostly earthworks, was approximately 5% of the total. </br></br>It is important to show that these types of schemes can be delivered effectively by private developers, in close consultation with other stakeholders. This complements other river restoration work being undertaken by the public sector. </br></br>Finally, in the process of facilitating development (which assists in economic regeneration) these types of restoration schemes can contribute a range of ecosystem services including supporting services (habitat creation; biodiversity); regulating services (flood control) and cultural services (potential recreation and amenity through riverside walkway; tranquillity; and educational services through being used as a demonstration project).gh being used as a demonstration project).)
  • Case study:River Soar Floating Pennywort Eradication  + (This is a constant battle, it is somethingThis is a constant battle, it is something that needs to be undertaken each year. There was no action in 2008 and this saw a huge increase in the presence of pennywort. As the occurrence of the plant becomes less the time and cost associated with the project also decreases.ssociated with the project also decreases.)
  • Case study:Plough Hill Farm Meander and Wet meadow restoration  + (This is a small project, total cost is expThis is a small project, total cost is expected to be less than 5k. However, it still has to be treated as if it is a major project. This has led to a very bottom heavy project with a substantially more spent on the consenting process rather than the delivering the project. There is a strong argument to suggest that any river restoration project must be worth the consenting process and smaller projects may not offer value for money.er projects may not offer value for money.)
  • Case study:Soaring connections: restoring people, wildlife & place  + (This is the start of a 6-year programme ofThis is the start of a 6-year programme of flood risk management works within Leicester. The Soar is navigable in Leicester and as most work was undertaken to improve conveyance we were limited in what improvements to marginal habitat could be undertaken. Most work involved wetland creation within the river corridor and creation of backwaters. Going forward future flood schemes on the Soar tributaries should look at the in-channel and marginal habitat improvements which should help to have a greater impact on WFD classifications. </br></br>Leicester is home to surprising amount of protected species for an urban environment. A lot of monitoring work was undertaken and careful consideration given to this during construction. This is something that will feed into future work to ensure that new foraging habitat created is not affected by subsequent work.</br></br>Leicester has a very diverse community which speak a large number of languages and for many English isn't their first language. A lot of the information we are trying to convey is in English which means that especially in tackling issues around diffuse pollution the message may be lost. We are looking at ways we can be more effective in getting the message out by doing work with schools and community groups who can then pass the message on.y groups who can then pass the message on.)
  • Case study:Lower Otter Restoration Project  + (This makes LORP a shining example of how nThis makes LORP a shining example of how natural processes can be harnessed to provide multiple benefits to wildlife, the environment, and people. By working with nature, the project is helping to create a more resilient, sustainable, and brighter future for the Otter Valley, its estuary, and surrounding communities.</br></br>Through these natural solutions, LORP demonstrates that it is possible to adapt to the challenges of climate change, reverse significant habitat and biodiversity loss, and improve degraded systems by working alongside nature, rather than against it.</br></br>The project is not only improving the ecological health of the Otter Valley and Estuary, but also providing important socio-economic benefits for local communities, such as improved flood resilience and infrastructure, and enhanced wellbeing, health, and recreational activities.eing, health, and recreational activities.)
  • Case study:Fish pass in Las Librerías weir on the Guadiela River  + (This permeabilization represent an improvement in the longitudinal connectivity of this river reach, however it is considered necessary to permeabilize the weir located 3 km downstream in order to achieve a more complete reconnection.)
  • Case study:Unit 3a – Hurst Bridge 2013  + (This project did pose some issues during iThis project did pose some issues during its delivery. The extent of the berm creation and bed reprofiling was limited due to the presence of overhead power lines. A safe working method was implemented by the Ops Delivery team. Initially the excavator to be used had an 8m reach; this was also used on the North Channel job. However this reach was wider and to maximise the benefits of the project a long reach had to be brought to site. This came at additional cost but enabled effective delivery of the project. The long reach machine was also used on a few parts of the North Channel project which were out of reach form the original machine. The tree works described above were also able to be carried out with the larger machine.to be carried out with the larger machine.)
  • Case study:Unit 4 - North Channel Phase 1  + (This project did pose some issues during iThis project did pose some issues during its delivery. The generally narrow nature made any changes made to the bed more sensitive than in other reaches of the Frome. The existence of gravels within the river bed was not as extensive as first thought. There were sections that were mostly clays which made it harder to reprofile effectively. The decision made on site was to minimise or exclude any works to the bed if gravel quantities were low.</br>The banks of the channel were high and steep; they were also quite soft so when trenches were dug to install LWD structures the banks in places seemed quite fragile. This limited the angle which could be dug and did restrict the use of this technique in places on the reach.</br>The benefit of adding value as described above cannot be under estimated. As described it can give a project additional materials (tree limbs etc) but can also gain acceptance of the project by other stakeholders such as the tenant farmer or river keeper. These can be achieved with minimal additional cost to the project.th minimal additional cost to the project.)
  • Case study:Restoration of Wandle Park  + (This project had a range of key challengesThis project had a range of key challenges that were overcome through the design process, including:</br>• The restoration of natural hydromorphological processes whilst minimising the potential for large scale channel migration. This was resolved through the design of a multi-stage channel which allows the low flow channel to adjust within a more permanent high flow bank line. Seeded gravels were also allowed to rework naturally to create a wide range of in-channel habitat niches. The two stage channel safely accommodates both the low dry weather flows and the high flood flows.</br>• Ensuring that the river could be re-meandered through contaminated land at the site without increasing remobilisation of in situ contaminated sediments and leachate. An uncontaminated capping layer using uncontaminated soils was used to protect the environment and park users from contaminated materials. </br>• Minimising the need for expensive off-site disposal of contaminated materials and the need to import uncontaminated soils for capping. Soils on the site were categorized as contaminated and less contaminated (i.e. with contaminant concentrations below hazardous levels), and the former were used as a base layer for landscape features within the park. These were capped with less contaminated soils from the site to prevent exposure to the wider environment.prevent exposure to the wider environment.)
  • Case study:Wallasea (North) Managed Realignment  + (This project has benefited from detailed iThis project has benefited from detailed investigative work and consultations that were undertaken as part of the site selection, scheme design and impact assessment work as well as for the preparation of the monitoring programmes. However, the need to find such a large site that met all the requirements was a long-term and costly exercise. There has been a full time project manager with supporting teams including representatives from statutory and non-statutory authorities and these aspects have enabled problems to be foreseen and rapidly addressed. The team approach has also allowed innovative new design elements to be identified which should provide high value at low cost (e.g. the island features in the site and a new ‘heterogenic’ borrow-dyke design).</br>The initial monitoring is still ongoing, and the full results from the first five-year monitoring programme have not been reported yet. However, from the interim progress reports that have been produced by ABPmer and Jacobs up to the end of 2010 (i.e. up to four years after the breaching), the following general observations have been made:</br>Breaches and channels: The breaches and channels through them are very stable which confirms the effectiveness of the approaches that were taken to design them.</br>Accretion: Within the site, sediment accretion has occurred relatively consistently and evenly due to the slow flows and stable internal creek/channel configurations. In the first year after breaching (2006 to 2007), accretion was around 10cm (of which about 50% is considered internally relocated materials and 50% externally imported sediments). In each subsequent year, the annual accretion is considered to be predominantly related to imported sediments and amounted to 3 to 5cm on average (specifically 5cm in both 2008 and 2009, and 3cm in 2010).</br>Invertebrates: The accretion and the relatively stable and depositional nature of the environment has helped to promote rapid benthic invertebrate colonisation of the mudflat (approx 80ha in extent). After the first, year invertebrates abundance was at 20,000 organisms/m2 and has ranged between 10,000 and 20,000 organisms/m2 in each successive year. The benthic assemblages have been dominated by large numbers of mud snail (Hydrobia ulvae) and although the patterns of organism recruitment are clearly complex and variable, there is evidence that the assemblages are maturing over time. This is indicated by the bivalve species becoming an increasingly important component over time (representing 2%, 4%, 14% and 26% of the populations in each successive year).</br></br>Birds: The bird monitoring (by CJT Ecology) shows that over the course of the four completed years of the monitoring programme the site has been supporting very good numbers of waterbirds. This was the case even from the first winter survey (2006/07) when the site supported around 7,000 waterbirds and included good numbers (i.e relatively high in a national or international context) of many key species such as shelduck, dunlin, black-tailed godwit, ringed plover and golden plover. In the following two winters the value of the site continued to improve as the abundance of waterbirds increased to around 10,000 and then 12,000. For the most recent winter (2009/10) however the overall abundance levels declined slightly. These broad trends are strongly influenced by some major inter-annual changes in the abundance of certain species which, in turn, are likely to be influenced by the weather conditions (e.g. particularly bad weather conditions were experienced in 2009/10 when compared with other years) and/or a range of other factors that influence the natural dynamics of bird populations (e.g. breeding success, timing of migrations, national population trends and inter-annual or inter-generational changes in roosting/feeding site selection). It is of note however, that the numbers of birds using the site as a roost reduced in 2009/10 while the number of birds feeding increased. This may indicate that the habitat and the relationship with migratory birds is still maturing and developing or that under adverse weather</br>conditions the site’s value as a feeding site as opposed to a roosting site increases.</br>Saltmarsh: Saltmarsh coverage of elevated areas of the sites (approx 25ha in extent) has occurred relatively rapidly. On average plant coverage (i.e the amount of marsh plant compared to bare mud at any given location) has rapidly increased from less than 1% in 2007 to 6% in 2008, 60% in 2009 and finally at or around 100% in 2010.009 and finally at or around 100% in 2010.)
  • Case study:Experimental flood in the Pisuerga river  + (Thus, the experimental flood release showeThus, the experimental flood release showed limited geomorphic</br>benefit, despite reaching (or even overtopping) the channel banks. Most</br>changes were related to the transport of fine sediments, but they did not</br>enhance habitat variation, or create new fluvial forms. Cebrián et al.</br>(2015) suggested that the results may have been associated with</br>extensive modification of the channel after six decades of dam management.</br>Bed incision or unbalanced river morphology could be hampering</br>the geomorphic influence of ordinary flows, requiring higher flows than</br>theorised to enhance sound morphological and ecological changes.ound morphological and ecological changes.)
  • Case study:East Devon Diffuse Pollution Project  + (Timing of the project - advice would have been more beneficial if delivered during 2015 earlier in the season. Also, the length of the project limits the scope of work which can be carried out.)
  • Case study:Re-establishing a natural water flow level in the "Mølleåen" river system  + (To be used as a reference in river restoration science on how to re-establish a natural flow regime in other European river systems near urban areas.)
  • Case study:Upper Witham Restoration  + (To get maximum benefit from projects, in aTo get maximum benefit from projects, in areas with less constraints, we needed to look wider than interventions focused just within the channel and consider the floodplain as well. Further learning for individual projects can be found in the project specific case studies.ound in the project specific case studies.)
  • Case study:River Glyme Stratford Restoration  + (Too soon to say - this section will be updated when monitoring reults have been evaluated.)
  • Case study:R Derwent Abutment & Buttress Removal  + (Undertake a Level 2 archaeological survey prior to demolition Ensure landowners and fishery owners are on board in the early stages Evaluate likely channel impacts from proposed modifications prior to demolition so no significant supprises)
  • Case study:LIFE Segura Riverlink (Through rivers)  + (Upon completion of the project, the followUpon completion of the project, the following results have been listed:</br></br>+ More than 10,000 fish are using the fish passages. 80% of fishes which try to use the vertical-slot fishway achieves it, 50% does it in less than half an hour.</br></br>+ First weir removal within the Segura Basin</br></br>+ Volunteer collaboration and the landstewardship scheme are essential for the achievement of a favorable development of the riparian vegetation. In case of volunteers, thanks to its implication in plantation and refered to landowners for their commitment to properly mantain riversides and to avoid the development of alien species spots as in the case of Arundo Donax.</br></br>+ Results obtained by the removal of Arundo Donax have been diverse, depending on the area and the technique applied. </br></br>+ Plantation has been more effective for willows (Salix sp), poplars (Populus sp.), elms (Ulmus minor), mastic trees (Pistacia lentiscus) and rosebay (Nerium oleander). </br></br>+ A proper implementation of the plantations, a good size of the holes, the location of each plant and the time of plantig are essential for the succes of the works.</br></br>+ One of the most succesful achievements has been giving visibility to the problem and to the project and the social awareness about it.project and the social awareness about it.)
  • Case study:Cannop catchment natural flood management  + (Use larger woody material for leaky dams. Ensure stone blockages are installed above flood level to prevent scour and the the clay covering the bund from being washed away.)
  • Case study:River Irwell Restoration Project  + (Utilise the material within the channel where possible to reduce the costs and impacts of importing foreign material.)
  • Case study:Reest  + (Water board Drents Overijsselse Delta obseWater board Drents Overijsselse Delta observes that it is important to plan and time maintenance well and to communicate well with water managers. Most notably, the developing vegetation caused the water to smell when water levels were high, so that weeds had to be cut along the entire stream.eds had to be cut along the entire stream.)
  • Case study:Tidal Dee Love my Estuary  + (Water pollution is a difficult topic to enWater pollution is a difficult topic to engage and enthuse members of the public about. More people were engaged about the topic when we held stands at already existing events that people would be going to rather than hoping people would attend an event specifically held by this project. We found that making the events aimed at homeowners targeted to families meant that more people attended and we could discuss general water management and water pollution with the adults whilst the children did craft activities. Relating water pollution to wildlife on the estuary (which is a prominent feature locally) meant it was easier to engage members of the public about the topic. </br></br>The walkover surveys were a success in gathering information to inform future delivery projects and in engaging partner organisations in Water Framework Directive project delivery.</br></br>The quality of the Pollution Prevention Pack was highly regarded by partners including stakeholders from other Catchment Partnerships. Enthusiasm for the packs has come from stakeholders in Devon, Gloucestershire, Northumberland, Derbyshire, Sussex, Shropshire and Bedfordshire. We know of two organisations from neighbouring Catchment Partnerships that are making minor amendments to the electronic version so they can use them locally.onic version so they can use them locally.)
  • Case study:Hoveton Wetlands Restoration Project  + (We can provide data to NE to support and inform restoration works. We will continue to work with partners to improve WFD status.)
  • Case study:Wild Wylye Phase 1  + (We did not encounter any major issues. YesWe did not encounter any major issues. Yes there were small hiccups during the delivery side of things (wrong gravel delivered, last-minute change of contractor), but not something that truly endangered the project.</br></br>The approach we took - project delivery mainly by volunteers - was so successful that we will endeavour to make that an important part from all future projects.n important part from all future projects.)
  • Case study:Stroud Rural Sustainable Drainage Project  + (We have learned a number of lessons: 1. ImWe have learned a number of lessons:</br>1. Importance of Bottom up approach and community support for Natural Flood Management. It is impossible to undertake this work on the scale needed to make a difference to both natural processes or flood risk if widespread community support is not given.</br>2. We think it is important to start work quickly to create momentum and inspire communities that the approach is feasible rather than theoretical.</br>3. Even small interventions can make a difference quickly in a degraded stream system, creating habitat complexity, refugia, and allowing light into a heavily shaded area.</br>4. Use local contractors to increase buy-in and capacity for undertaking works.</br>5. Start at the most upstream location feasible and work your way downstream. Working on smaller water courses has less risk and less requirement for modelling and feasibility work.rement for modelling and feasibility work.)
  • Case study:Delivering Multiple Benefits for Water on Foston Brook  + (We have yet to review the lessons learnt.)
  • Case study:Grange Farm  + (We worked with the landowner, built a bespoke design, and with the landowner's support, held an event to share the successes and lessons learnt with other farmers. There was huge value in facilitating a farmer to farmer discussion.)
  • Case study:Restoring sea-trout and salmon habitat in Aurlandselva  + (What we have learned so far is the importance of having reliable discharge data, and also the need to target monitoring to measure any specific restoration work being carried out.)
  • Case study:Martins River Island  + (When adding gravels to the river bed to prWhen adding gravels to the river bed to previously dredged sectiosn be aware ofg the imapct this may have on flood connection during higher flows. Follwing the addition of gravel the two following winters have experienced very high flwos whith significant prolonged out of bank flows for severals months each winter. In this case thelandowner was ok with this but in other projects this may have become a significant issue. this may have become a significant issue.)
  • Case study:Belton Floodplain Reconnection and River Restoration  + (When planning a large-scale project of thiWhen planning a large-scale project of this nature, the first consideration should be what is the lowest cost and least disruptive way of achieving the objectives. Previous habitat works have focussed on lowering the floodplain to meet the water surface. This is often costly with excess spoil to move and spread and has a high initial impact on site both ecologically and aesthetically. It can also be very effective to work up projects in several phases over several years to allow interventions to be in and establish e.g channel narrowing followed by gravel introduction.narrowing followed by gravel introduction.)
  • Case study:Woughton on the Green bank stabilization  + (While the project was successful at stabilWhile the project was successful at stabilizing the bank where it was most at risk (i.e. steep and close to public footpath), the bank poaching caused by dogs has just moved to another location. This should be considered in any similar project that seeks to restore bank that is deteriorating as a result of livestock or recreational activity. Consider where dogs or livestock will next enter the river, and consider whether the river at that point will be sensitive to the pressure. Are there any other unstable banks or important habitats such as spawning gravels that may be impacted? Consider whether fencing or formal drinking bathing points may be required.l drinking bathing points may be required.)
  • Case study:Slow the Flow, Broadland Rivers, Norfolk  + (With close liaison with permitting and enforcement colleagues it is essential to apply the relevant legislation appropriately. This is used as a pilot scheme for other projects which are linked with WWF/Waterlife/Coca Cola over the next 3 years.)
  • Case study:The San Marcos weir removal  + (With this action, an extraordinary flood wWith this action, an</br>extraordinary flood was</br>prevented (the year after</br>the dam removal) that</br>would have flooded part</br>of the city of León.</br></br>The realization of this</br>removal in an urban area</br>is a great success since it</br>increases the awareness</br>of the society because</br>they will demand this type</br>of actions when seeing the</br>results.</br></br>The location of the weir</br>near a bridge forced to</br>use more costly removal</br>techniques, which</br>increased the final price of</br>the project. increased the final price of the project.)
  • Case study:Houghton 'trout stream' enhancements  + (Wood for construction of deflectors was soWood for construction of deflectors was sourced locally and work was undertaken by hand. Therefore the size of deflectors were limited to what could be manoeuvred by hand. Despite their size, careful consideration of the prevailing flow and sediment conditions meant they could be placed to achieve optimum benefit.</br></br>In November 2014 some of the wooden posts, used to hold deflectors in place, had to be replaced. The posts were 75 mm diameter and it is thought that the staples and screws used to secure wire to these posts were too large, causing the post to be weakened and split under load. We have since replaced posts with 20 mm re-bar drilled through the deflectors. Post diameter and staple size should be considered when planning how to secure LWD.onsidered when planning how to secure LWD.)
  • Case study:River Slea Rehabilitation  + (Work could not be carried out in section 3Work could not be carried out in section 3 due to the firmness of the riverbed. It is reccomended in the future that the firmness of the riverbed should be tested to ensure habitat improvement works can be carried out. </br>Install coir matting vegetation at the same time as installing brushwood, we had to rely on individual plug plants when planting. Although plugs are cheaper than matting.. Although plugs are cheaper than matting.)
  • Case study:Cain weir removal  + (Working with a local contractor Seed and Spur, we were able to complete the works within the timescale and under budget of £750 in addition to SRT staff costs to prepare the consents, engage the business and monitor the work.)
  • Case study:Lower River Roding Regeneration Project  + (You can set back flood defences even in highly constrained locations. In particular the A13 site is located next bridge supporting a major road into London. The steel sheet piling has been removed and intertidal banks have been restored.)
  • Case study:Greenwich Peninsula  + (cost neutral)