Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Greenwich Peninsula + (during construction)
- Case study:Fairham Brook Restoration Project + (Prior to the stakes being cut and wiring in the coir rolls.)
- Case study:River Bure + (Phase 1 site 2 before restoration (D.Brady, The National Trust))
- Case study:Cornmill Gardens (QUERCUS) + (prior to works)
- Case study:Černý potok stream restoration scheme + (excavation of the new channel)
- Case study:Stage 0 channel restoration + (before works)
- Case study:Borrowash fish pass + (Borrowash weir 121m long (image courtesy of J.Finnegan at the Environment Agency))
- Case study:BALLYMONEY RIVERSIDE PARK RESTORATION PROJECT + (for comparison with post works)
- Case study:Aston Clinton River Restoration + (Flooding over BCC and ACPC land)
- Case study:Enler River enhancement project + (pre works channel)
- Case study:Rottal Burn + (immediately post-restoration)
- Case study:Letting the Dove Flow + (An example of weir breaching)
- Case study:East Tullos Burn Environment Improvements Project + (Selection of images of site before construction phase of project.)
- Case study:Manor Park + (just downstream of the park)
- Case study:River Hogsmill Restoration Project + (The River Hogsmill at Watersedge - February 2007)
- Case study:Houghton 'trout stream' enhancements + (River Lamprey spawining on clean gravels)
- Case study:Stage 0 channel restoration + (before works)
- Case study:River Somer channel enhancement, Midsomer Norton + (channel prior to restoration (woodland water and gardens))
- Case study:March Burn at Riding Mill + (mill weir on the March Burn before fish pass installation (picture courtesy of P.Atkinson from the Tyne Rivers Trust))
- Case study:Vindel River LIFE + (nVindel River Lifen Lidsbacken_before restoration)
- Case study:Lodge Burn cascade fish pass and culvert bed restoration (as part of the Lodge Burn FAS) + (Culvert outlet pre-works was causing a major obstruction to fish passage (Rivers Agency))
- Case study:Arborfield nature like bypass and weirs project + (Small fixed-crest weir prior to lowering. Courtesy of Wild Trout Trust and the Environment Agency.)
- Case study:Greenwich Peninsula + (during construction)
- Case study:Borova Stream and its Revitalisation + (post restoration)
- Case study:Rottal Burn + (Prior to restoration - channel had been straightened)
- Case study:Enler River enhancement project + (pre works channel)
- Case study:Cornmill Gardens (QUERCUS) + (prior to works)
- Case study:Gilev's Grove reconstruction + (Klyuchi stream rehabilitation)
- Case study:Restoration of R. Odelouca 2 + (restored section: invasive species were erradicated and replaced by a willow after a cribwall structure)
- Case study:Welton Farm Landfill/Riverbank Works + (Historic Landfill)
- Case study:River Varde Valley and the meadows of Ho Bay (Ho Bugt) environment improvement project + (Tarphage +Holmen25mar 005)
- Case study:Wandsworth Riverside Quarter + (terrace just after constuction)
- Case study:Remeandering of the Drugeon and integrated management of its catchment + (A distribution weir allows to get water into the meander (October 2008).)
- Case study:Černý potok stream restoration scheme + (excavation of the new channel)
- Case study:Ålgårda nature-like bypass channel at River Rolfsån + (Ålgårda Hyro power plant (photo. Outi Laamanen))
- Case study:Démantèlement de l’ouvrage du Pont Fourneau sur la Selle + (L’ouvrage du Pont Fourneau sur la Selle. Mars 2005 (Source: SIAHSA).)