Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Pearls in Peril LIFE+ GB Project - River Dee + (Map of instream restoration sites - Aboyne & Banchory)
- Case study:Gilev's Grove reconstruction + (Klyuchi stream rehabilitation)
- Case study:River Rhee + (The created backwater, April 2004)
- Case study:River Idle Restoration Project + (Aerial photo of erosion at Scaftworth)
- Case study:Twineham Weir Removal & In-channel Enhancements + (Twineham Tilting Gate Pre-Removal)
- Case study:Restoration of Kalajoki River + (Catchment of River Kalajoki (Jouni Näpinkangas))
- Case study:Trees on the River Uck + (Trees on the River Uck Project catchment map)
- Case study:LIFE RISORGIVE – Roggia Girosa + (Risorgiva)
- Case study:Belton Floodplain Reconnection and River Restoration + (Channel before any of the works.)
- Case study:Burn of Mosset, Forres + (Chapelton Dam control structure (2013))
- Case study:Sågarsfors + (Before dam removal (Jukka Jormola))
- Case study:Reopening of a section of the River Bièvre in an urban environment + (Work in progress on the park in Fresnes in 2003.)
- Case study:Haltwhistle burn; a total catchment approach + (Electro-fishing with volunteers)
- Case study:Westborough + (Works being undertaken.)
- Case study:LIFE REWETLAND - A wide-area programme for improving the quality of surface water in the agro pontino by means of natural purification techniques + (LIFE REWETLAND (LIFE+08 env/it/000406))
- Case study:Upper Witham Restoration + (Colsterworth just after restoration.)
- Case study:Fairham Brook Restoration Project + (Prior to the stakes being cut and wiring in the coir rolls.)
- Case study:Zero river restoration project + (Zero river after restoration)
- Case study:Habitat improvement project in Segre river, in Alòs de Balaguer + (Area of action in Segre River)
- Case study:Zújar river restoration in the reach between the Chapel of St Mary of Zújar and the ford of "Entrerríos", Badajoz. + (Aerial view of the restoration area)
- Case study:Zújar river restoration in the reach between the Chapel of St Mary of Zújar and the ford of "Entrerríos", Badajoz. + (Zujar River before works)
- Case study:Zújar river restoration in the reach between the ford of "Entrerríos" and its mouth, Badajoz. + (Zujar River before works)
- Case study:Enler River enhancement project + (pre works channel)
- Case study:Lullingstone Castle + (before (A))
- Case study:River Hogsmill Restoration Project + (The River Hogsmill at Watersedge - February 2007)
- Case study:Stabilization of hydrological situation on the Neznaika River + (bank enforcement)
- Case study:Stage 0 channel restoration + (before works)
- Case study:Highland Water at Warwickslade Lawn + (Addition of woody debris to the river to significantly reduce flow velocities, October 2009)
- Case study:River Somer channel enhancement, Midsomer Norton + (channel prior to restoration (woodland water and gardens))
- Case study:Lodge Burn cascade fish pass and culvert bed restoration (as part of the Lodge Burn FAS) + (Culvert outlet pre-works was causing a major obstruction to fish passage (Rivers Agency))
- Case study:Medmerry Managed Realignment Scheme + (credit to RSPB)
- Case study:Cornmill Gardens (QUERCUS) + (prior to works)
- Case study:Greenwich Peninsula + (during construction)
- Case study:Fairham Brook Restoration Project + (Prior to the stakes being cut and wiring in the coir rolls.)
- Case study:River Bure + (Phase 1 site 2 before restoration (D.Brady, The National Trust))
- Case study:Černý potok stream restoration scheme + (excavation of the new channel)
- Case study:Borrowash fish pass + (Borrowash weir 121m long (image courtesy of J.Finnegan at the Environment Agency))
- Case study:BALLYMONEY RIVERSIDE PARK RESTORATION PROJECT + (for comparison with post works)
- Case study:Aston Clinton River Restoration + (Flooding over BCC and ACPC land)
- Case study:Rottal Burn + (Prior to restoration - channel had been straightened)
- Case study:Letting the Dove Flow + (An example of weir breaching)
- Case study:East Tullos Burn Environment Improvements Project + (Selection of images of site before construction phase of project.)
- Case study:Manor Park + (just downstream of the park)
- Case study:Houghton 'trout stream' enhancements + (River Lamprey spawining on clean gravels)
- Case study:March Burn at Riding Mill + (mill weir on the March Burn before fish pass installation (picture courtesy of P.Atkinson from the Tyne Rivers Trust))
- Case study:Vindel River LIFE + (nVindel River Lifen Lidsbacken_before restoration)