Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Effacement du seuil du Moulin d’Hatrize sur l’Orne + (Apparition d’une brèche dans la digue en 2008 (Source: Agence de l’eau Rhin-Meuse).)
- Case study:Arasement du seuil des Treize Saules sur la Quilienne + (Le seuil des Treize Saules avant ouverture de la vanne. Printemps 2008 (Source: FDPPMA du Pas-de-Calais))
- Case study:Effacement du seuil de Carayon sur le Thoré + (Vue aval du seuil de Carayon, avant effacement, ponctué par plusieurs brèches sur le déversoir. Juillet 2011 (Source: Yannick Ramadier – Onema).)
- Case study:Wensum River Restoration Strategy + (WRS River Tat (Environment Agency))
- Case study:Llobregat river restoration + (Map of the restoration area)
- Case study:Gilev's Grove reconstruction + (Klyuchi stream rehabilitation)
- Case study:3Rivers - Lumburn:Walkham:Tavy + (Newly planted trees - Lower Tavy)
- Case study:Bleinheim Palace Project + (River Evenlode, May 2006)
- Case study:Water and Life for Drava and Vuka + (Water and Life for Drava and Vuka_1)
- Case study:Shaping and protecting water-mud biotopes in Garwolin Forest division through development of small retention + (Retention reservoir (photo by: W. Mioduszewski) GWP Eastern Europe)
- Case study:Letting the Dove Flow + (An example of weir breaching)
- Case study:Abbotts Hall Managed Realignment Scheme + (The managed realignment at Abbotts Hall (shortly after first inundation;breaches circled in pink) - Google Earth derived aerial view)
- Case study:Beltringharder Koog Regulated Tidal Exchange Scheme + (View along sea wall (saline lagoon to left, fronting tidal flats with sedimentation fields to right) (Taken by: S. Armstrong, ABPmer, 2001))
- Case study:Small Retention - Big Deal, A National Program on Natural Small Water Retention Measures + (Damming device on the channel constructed in the 1920s Source: Waldemar Mioduszewski and Tomasz Okruszko. GWP Poland.)
- Case study:River Stour at Glen's weir (Throop fisheries) + (Glen's Weir (EA report, 2011))
- Case study:Aubourn Rock Ramp and Habitat Works + (Weir Pre-works)
- Case study:Conservation the public water domain in the Tajo basin, t. m. Alcocer, province of Guadalajara. + (Aerial view of the area)
- Case study:Conservation the public water domain in the Tajo basin, t. m. Alcocer, province of Guadalajara. + (Weir before works)
- Case study:Improved longitudinal continuity of the Lozoya River, upstream the Pinilla dam (Madrid) + (Weir before works)
- Case study:Improving the ecological status of the Black River and tributaries (Zamora) + (Map of the restoration area)
- Case study:Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage. + (Map of the actuation area)
- Case study:Restoration of Viejas River from the outlet of the fish farm to its mouth + (Map of the restoration area)
- Case study:Clayton Vale + (Weir prior to works)
- Case study:Welland for People and Wildlife Project + (Welland catchment)
- Case study:Welwick Managed Realignment Scheme + (Rear embankment construction and re-profiling at Welwick in 2005)
- Case study:Wensum River Restoration Strategy + (WRS River Tat (Environment Agency))
- Case study:River Wensum Rehabilitation Project - Bintree + (Wensum in February 2001)
- Case study:Manthorpe Floodplain Reconnection + (New channel evolving.)
- Case study:Belton Floodplain Reconnection and River Restoration + (Channel before any of the works.)
- Case study:Braid Burn at Inch Park + (Before works - April 2006)
- Case study:Eddleston water + (New gravel side bar. Photo: Ulrika Åberg, RRC)
- Case study:Rewilding Enfield's Urban Rivers + (Wetlands, rain gardens, rain planters in Enfield)
- Case study:Carnon River: Abandoned Metal Mines + (Wheal Maid tailings dam, looking east (July 2013))
- Case study:Gilev's Grove reconstruction + (Klyuchi stream rehabilitation)
- Case study:Haltwhistle burn; a total catchment approach + (Electro-fishing with volunteers)
- Case study:Resilient River + (Barnwell Backchannel Interpretation Panel)
- Case study:Pearls in Peril LIFE+ GB Project - River Dee + (Map of instream restoration sites - Aboyne & Banchory)
- Case study:River Rhee + (The created backwater, April 2004)
- Case study:River Idle Restoration Project + (Aerial photo of erosion at Scaftworth)
- Case study:Twineham Weir Removal & In-channel Enhancements + (Twineham Tilting Gate Pre-Removal)
- Case study:Restoration of Kalajoki River + (Catchment of River Kalajoki (Jouni Näpinkangas))
- Case study:Trees on the River Uck + (Trees on the River Uck Project catchment map)
- Case study:LIFE RISORGIVE – Roggia Girosa + (Risorgiva)