Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Wandle Restoration Project + (Trout spawning on the Carshalton arm, November 2012, © T. Longstaff (Wandle Trust))
- Case study:Restore riparian floodplain habitats maintained in reserve "Dolna topchia" and run off on his sleeve "Malka Tundzha" + (Dolna topchia Reserve_1)
- Case study:Demolition of weir on the River Nora, Nalón Basin + (Aerial view of Guyame)
- Case study:Twineham Weir Removal & In-channel Enhancements + (Twineham Tilting Gate Pre-Removal)
- Case study:Braid Burn at Inch Park + (Before works - April 2006)
- Case study:River Keekle Restoration + (Typical condition pre-restoration)
- Case study:Ullswater Catchment Restoration + (Ullswater CIC hedgerow creation)
- Case study:Rétablissement de la continuité écologique sur la Luire + (Un des ouvrages problématiques sur la Luire à Clos Merle (2008) (Source: SIAG).)
- Case study:Whit Beck River Restoration Project + (The heavily modified raised river channel)
- Case study:Source to Sea Programme – 10. River Gilpin, Foulshaw and Winster Restoration + (Underbarrow Beck - New fence line)
- Case study:River Avon Habitat Enhancement, Fifield + (Undertaking in-channel works)
- Case study:River restoration project in Sella, Asturias + (Aerial view of Sella River downstream Arriondas)
- Case study:Pearls in Peril LIFE+ GB Project - River Dee + (Map of instream restoration sites - Aboyne & Banchory)
- Case study:Upper Emscher + (Upper Emscher in Dortmund Schüren during construction)
- Case study:Hull and East Riding Catchment Partnership + (Upper Hull (map))
- Hull and East Riding Catchment Partnership + (Upper Hull (map))
- Case study:Dumbreck Marsh & Garrel Burn Restoration + (Fish pass (lower))
- Case study:Small water retention measures in Haluzice Gorge + (Lower part of the Haluzice Gorge with 4 m high stone weir (Source Richard Muller, GWP Eastern Europe))
- Case study:Marsh restoration on the Merlue + (The Merlue just downstream the marsh in summer 2009. The bed moved [on the left] on the edge of the marsh [on the right] has been filled during the restoration works.)
- Case study:Twineham Weir Removal & In-channel Enhancements + (Twineham Tilting Gate Pre-Removal)
- Case study:Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia ) + (Aerial view of the restoration area)
- Case study:Ouzel habitat improvement + (Upstream deflector installation)
- Case study:Prologis Midpoint Park river restoration scheme + (River Tame pre-restoration)
- Case study:River Alt and Croxteth Brook Restoration Project. + (Original river flowing into culvert)
- Case study:Gunville Phase I + (Upstream of Gunville hatches, prior to project delivery)
- Case study:Meades water garden regeneration project + (Downstream of the bridge during construction (top) and post-restoration (below))
- Case study:Spring Meadow Meander Restoration + (Upstream part of the project where Himalayan Balsam will need to be managed - © Nick Elbourne (RRC), October 2013)
- Case study:Restoration of Viejas River from the outlet of the fish farm to its mouth + (Map of the restoration area)
- Case study:Restorations of River Nolån-Hulta dam removal + (Upstreams from the dam (photo. Maria Arola))
- Case study:Austria Urban River Landscape - Urban River Landscape Graz + (Urban River Landscape Graz - Recreation and chilling areas at the waterfront (Capital of Styria) 2004 – ongoing ©freiland)
- Case study:Restoration, protection and sustainable development of protected area "Zlato pole" + (Before restoration)
- Case study:River Pool Linear Park Enhacement + (The restored river, complete with berms. April 2012)
- Case study:Restoration of Vantaanjoki River + (Vantaanjoki River after restoration (photo: Olli Toivonen).)
- Case study:River rehabilitation on the River Wensum at Swanton Morley + (Newly created filled berms – August 2012 ©Environment Agency)
- Case study:River Alt at Knowsley + (River Alt prior to works)
- Case study:River Nent: Abandoned Metal Mines + (Vertical Flow Pond diagram)
- Case study:Reactivating river dynamics in the Vieux-Rhône River (non-navigable section) at Cornas, Roubion and Petite Île + (Old Girardon dike along the Rhône where flood debris accumulated, before the dike was opened. September 2011 (Compagnie nationale du Rhône).)
- Case study:Restoration of Vesselina River + (Vesselina River - before restoration)
- Case study:Ullswater Catchment Restoration + (Ullswater CIC hedgerow creation)
- Case study:Beltringharder Koog Regulated Tidal Exchange Scheme + (View along sea wall (saline lagoon to left, fronting tidal flats with sedimentation fields to right) (Taken by: S. Armstrong, ABPmer, 2001))