Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Roding at Ray Lodge Park + (River Roding prior to the project)
- Case study:River Rhee + (The created backwater, April 2004)
- Case study:Removal of a dam on the Allier river in Saint-Etienne-du-Vigan + (The dam site of Saint-Étienne-du-Vigan in 1996, after the plant demolition.)
- Case study:Enhancement of the River Crouch following a pollution incident + (The existing river had a straight planform)
- Case study:Inchewan Burn Bed restoration + (The degraded reno mattresses)
- Case study:Removal of a dam on the Allier river in Saint-Etienne-du-Vigan + (The dam site of Saint-Étienne-du-Vigan in 1996, after the plant demolition.)
- Case study:Restoring the river continuity of the Bresle River by returning it to its original bed in Sénarpont + (The Sénarpont weir, a total barrier for fish, in 2012 prior to the works (Stéphane Forgeois, Onema).)
- Case study:Albbruck-Dogern (bypass and nature-like pool pass) + (River Rhine, Albruck / Dogern (D): Diversion of the discharge into two courses: rock cascade pass, vertical slot pass with collection gallery.)
- Case study:The Holbina-Dunavat Restoration Project + (The entrance in Holbina area (source:www.info-delta.ro))
- Case study:River Rhee + (The created backwater, April 2004)
- Case study:Enhancement of the River Crouch following a pollution incident + (The existing river had a straight planform)
- Case study:Reactivating river dynamics in the Vieux-Rhône River (non-navigable section) at Cornas, Roubion and Petite Île + (Old Girardon dike along the Rhône where flood debris accumulated, before the dike was opened. September 2011 (Compagnie nationale du Rhône).)
- Case study:Returning the Fontenelle to its original bed at Saint-Wandrille-Rançon + (Aerial view of the renatured Fontenelle. Spring 2011 (Arnaud Rosan, SMBVCS))
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (Arrival of mechanisation at the entry to the lake)
- Case study:Fish pass in Las Librerías weir on the Guadiela River + (The fishpass built in Las Librerías weir on the Guadiela River. Photo credits: Europa press/JCCM.)
- Case study:Removal of Maisons-Rouges dam over the River Vienne + (Maisons Rouges dam before the removal.)
- Case study:River Restoration at Hunworth (River Glaven) + (Channel sinuosity was increased as a result of the scheme)
- Case study:Whit Beck River Restoration Project + (The heavily modified raised river channel)
- Case study:Marsh protection in Egyek–Pusztakócs + (The hydrological reconstruction has caused the rapid regeneration of the marshes, with their areal extent increasing to 26-28% (habitat map from 2001) (Source: GWP Eastern Europe, See file in references).)
- Case study:Lippenbroek Regulated Tidal Exchange Scheme + (The inlet structure at high tide)
- Case study:River Idle Restoration Project + (Aerial photo of erosion at Scaftworth)
- Case study:Removal and opening of sluice gates on the Vence River + (The sluice gate of Saint-Marceau in March 2007, three years after its opening.)
- Case study:Nine Chalk Rivers Project - Babingley Catchment + (The location of Babingley River)
- Case study:Nine Chalk Rivers Project - Burn Catchment + (The location of Burn River)
- Case study:Nine Chalk Rivers Project - Glaven Catchment + (The location of Glaven Catchment)
- Case study:Nine Chalk Rivers Project - Heacham Catchment + (The location of Heacham River)
- Case study:Nine Chalk Rivers Project - Hun Catchment + (The location of Hun River)
- Case study:Nine Chalk Rivers Project - Ingol Catchment + (The location of Ingol River)
- Case study:Nine Chalk Rivers Project - Mun Catchment + (The location of Mun River)
- Case study:Nine Chalk Rivers Project - Gaywood Catchment + (The location of River Gaywood)