Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Sutcliffe Park + (Sutcliffe Park Flood defence aspects)
- Case study:Swindale Beck Restoration + (Swindale Beck restoration work in progress)
- Case study:Conservation of alluvial +
- Case study:Rottal Burn + (Prior to restoration - channel had been straightened)
- Case study:River Varde Valley and the meadows of Ho Bay (Ho Bugt) environment improvement project + (Tarphage +Holmen25mar 005)
- Case study:Rheinfelden bypass + (The map of Rheinfelden bypass. New power plant designed as run-of-river type. Near-nature water course installed in the old headrace channel. (photo: Walter Binder))
- Case study:Saving Chiswick Eyot + (Old Chiswick Conservation Area. London borough of Hounslow)
- Case study:Agreed definition of mobility area for the Adour + (The Adour at Izotges (Gers).)
- Case study:The Babina Restoration Project + (The Babina polder before restoration)
- Case study:Removal of the Fatou dam on the Beaume river + (The Fatou dam in April 2004.)
- Case study:Restoration of the Bellegarde hydraulic annex and sediment recharge of the Ain River + (The Bellegarde pond, before restoration: heavily wooded and almost dry.)
- Case study:Reopening of a section of the River Bièvre in an urban environment + (Work in progress on the park in Fresnes in 2003.)
- Case study:Bures Mill fish by-pass + (The Bures Mill Automatic Gate)
- Case study:Burn of Mosset, Forres + (Chapelton Dam control structure (2013))
- Case study:Restoration of the longitudinal continuity along the Canche and its classified tributaries + (The Canche at Conchy-sur-Canche before dismantling of the sluice.)
- Case study:Refilling the meanders of the Colostre + (The Colostre canalised before restoration (1999).)
- Case study:Removal of the Coupeau impoundment on Vicoin River and riverbed restoration + (The coupeau impoundment.)
- Case study:Removal of the Cussy weir on the Maria stream + (The Cussy weir.)
- Case study:Restoration of the previous riverbed of the Dadon + (The Dadon riverbed, before restoration, in June 2004.)
- Case study:Conservation of alluvial + (The Danube River)
- Case study:Restoring the River Doquette to its original bed + (The Doquette in June 2008, prior to restoration with its raised bed (on the left) and its natural bed now used as a drainage ditch (on the right).)
- Case study:Widening and sediment reloading of the Drac riverbed in Saint-Bonneten-Champsaur + (Bed scouring of the Drac into the clay, loss of riparian vegetation and a landslide, in November 2011 (Bertrand Breilh, CEDA).)
- Case study:Remeandering of the Drugeon and integrated management of its catchment + (A distribution weir allows to get water into the meander (October 2008).)
- Case study:Remeandering of the Drésine and of the Remoray stream + (View on the marsh of the Remoray Lake, in October 2008.)
- Case study:Removal of the Fatou dam on the Beaume river + (The Fatou dam in April 2004.)
- Case study:LIFE 06 NAT/SLO/000069 Intermittent Lake Cerknica + (Lake Cerknica in autumn (Photo: Notranjska Regional Park archive))
- Case study:Removal of the Kernansquillec dam over the River Léguer + (Kernansquillec dam and its reservoir in the last century.)
- Case study:Gilev's Grove reconstruction + (Klyuchi stream rehabilitation)
- Case study:Restoration of Porvoonjoki + (The Koskela rapids before the restoration (photo:Vainio))
- Case study:Adaptive management of hydraulic structures in the Sèvre nantaise and Thouet basins + (The La Motte reservoir, on the Sanguèze river, in 2003, before works.)
- Case study:Partial removal of weir on the Sanguèze at Mouzillon + (The La Motte reservoir, on the Sanguèze river, in 2003, before works.)
- Case study:Removal of Maisons-Rouges dam over the River Vienne + (Maisons Rouges dam before the removal.)
- Case study:Aesthetic vs. functional restoration of urban and peri-urban rivers: the Manzanares River in Madrid + (The Manzanares River near the historical Toledo Bridge by the early 20th century, showing the characteristic patterns of the near-natural multi-thread river channel (Photo source: Madrid City Council and CEDEX).)
- Case study:Remeandering of the Mardereau stream at Sorigny + (The Mardereau stream before restoration, in January 2009.)
- Case study:Removal of the Cussy weir on the Maria stream + (The Cussy weir.)
- Case study:Recreation of a sinuous low-flow channel in the Merloz + (The channelized Merloz presents a very poor habitat diversity (September 2004).)
- Case study:Marsh restoration on the Merlue + (The Merlue just downstream the marsh in summer 2009. The bed moved [on the left] on the edge of the marsh [on the right] has been filled during the restoration works.)
- Case study:Recreation of a low-flow sinuous channel in an urban stretch of the Montvaux stream + (The Montvaux stream in Châtel-Saint-Germain, before the restoration works.)
- Case study:The Podspády – Protected Area Bor – natural water retention by beaver weir + (The Natural water measures in basin Javorinka 2014 (photo by Mosny) GWP Eastern Europe)
- Case study:Land acquisition on the banks of the Ouche River + (The Ouche River in 1995 in a portion where the river is calibrated, rectified and with banks protected.)
- Case study:Removing a weir and renaturalising the Iton River on the Plis industrial site in Hondouville + (The meadow after restoration of the wetland (2014) (SCA Tissue France).)
- Case study:Reopening of the culverted Redon river + (Overview of the quarry before restoration work - 2007 (Symasol))
- Case study:Rio Mareta restoration at Stanghe (Sterzing-Vipiteno) + (Rio Mareta in 2005, before restoration works.)
- Case study:River Hogsmill Restoration Project + (The River Hogsmill at Watersedge - February 2007)
- Case study:River Idle Restoration Project + (Aerial photo of erosion at Scaftworth)