Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Salmonid, coarse fish and wetland bird habitat and flood plain linkage project, Hampshire Avon + (Burcombe - post works)
- Case study:Creation and restoration of a riparian zone + (Map and aerial photograph of the area of action)
- Case study:River Alt and Croxteth Brook Restoration Project. + (Original river flowing into culvert)
- Case study:ReNaturalize + (Installation of flexible structure)
- Case study:River Varde Valley and the meadows of Ho Bay (Ho Bugt) environment improvement project + (Tarphage +Holmen25mar 005)
- Case study:Enhancement of the River Crouch following a pollution incident + (The existing river had a straight planform)
- Case study:Telford Catchment Restoration Project + (Areas of reed plantng acting as biological filters)
- Case study:River Worfe Restoration Initiative + (APEM scientist undertaking catchment survey on the Worfe)
- Case study:Small Retention - Big Deal, A National Program on Natural Small Water Retention Measures + (Damming device on the channel constructed in the 1920s Source: Waldemar Mioduszewski and Tomasz Okruszko. GWP Poland.)
- Case study:River Glyme Stratford Restoration + (Stone to raise levels by Vaughan Lewis)
- Case study:Eau Blanche River (Walphy - LIFE project) + (Straightening of the Eau blanche river)
- Case study:Austria River Mur - Strategic river management for considerations in the power and water management sector in Styria/Austria + (Strategic river management for considerations in the power and water management sector in Styria/Austria - Overview Strategic river management in Styria/Austria ©freiland)
- Case study:Restoration of Longinoja brook + (Longinoja after restauration may 2006 (photo: Liisa Laitinen))
- Case study:Remeandering of the Mardereau stream at Sorigny + (The Mardereau stream before restoration, in January 2009.)
- Case study:Hierdense Beek + (De beek bij Staverden)
- Case study:Rétablissement de la continuité écologique sur la Luire + (Un des ouvrages problématiques sur la Luire à Clos Merle (2008) (Source: SIAG).)
- Case study:Day Brook Rain Gardens + (Summer 2013)
- Case study:Day Brook Rain Gardens + (Day Brook rain garden)
- Case study:Restoration, protection and sustainable development of protected area "Zlato pole" + (Before restoration)
- Case study:Source to Sea Programme – 2. Pan-Morecambe Bay Wetlands and Waterbodies Restoration + (Savinhill Moss - tree clearance and abstraction by horse)
- Case study:River of Life + (River of Life pre-works (River Restoration Centre))
- Case study:Effacement partiel de 14 seuils sur le Mutterbach et l’Hosterbach à Holving et Hoste + (Surélargissement du cours d’eau au niveau d’un seuil sur le Mutterbach. Janvier 2009 (Source: Patrice Muller, AFB).)
- Case study:Mayesbrook Climate Change Park restoration project + (Jubilee planting event, March 2012 © LBBD)
- Case study:Quaggy Flood Alleviation Scheme + (Overview of the Quaggy Flood lleviation Scheme)
- Case study:Sutcliffe Park + (Sutcliffe Park Flood defence aspects)
- Case study:Swindale Beck Restoration + (Swindale Beck restoration work in progress)
- Case study:Conservation of alluvial + (The Danube River)
- Case study:Rottal Burn + (Prior to restoration - channel had been straightened)
- Case study:River Varde Valley and the meadows of Ho Bay (Ho Bugt) environment improvement project + (Tarphage +Holmen25mar 005)
- Case study:Rheinfelden bypass + (The map of Rheinfelden bypass. New power plant designed as run-of-river type. Near-nature water course installed in the old headrace channel. (photo: Walter Binder))
- Case study:Saving Chiswick Eyot + (Old Chiswick Conservation Area. London borough of Hounslow)
- Case study:Agreed definition of mobility area for the Adour + (The Adour at Izotges (Gers).)
- Case study:The Babina Restoration Project + (The Babina polder before restoration)
- Case study:Removal of the Fatou dam on the Beaume river + (The Fatou dam in April 2004.)
- Case study:Restoration of the Bellegarde hydraulic annex and sediment recharge of the Ain River + (The Bellegarde pond, before restoration: heavily wooded and almost dry.)
- Case study:Reopening of a section of the River Bièvre in an urban environment + (Work in progress on the park in Fresnes in 2003.)
- Case study:Bures Mill fish by-pass + (The Bures Mill Automatic Gate)
- Case study:Burn of Mosset, Forres + (Chapelton Dam control structure (2013))
- Case study:Restoration of the longitudinal continuity along the Canche and its classified tributaries + (The Canche at Conchy-sur-Canche before dismantling of the sluice.)
- Case study:Refilling the meanders of the Colostre + (The Colostre canalised before restoration (1999).)
- Case study:Removal of the Coupeau impoundment on Vicoin River and riverbed restoration + (The coupeau impoundment.)
- Case study:Removal of the Cussy weir on the Maria stream + (The Cussy weir.)