Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Wettingen, nature-like fish pass + (Nature-like bypass channel: River Limmat, Wettingen (photo: Walter Binder))
- Case study:Rodley weir by pass channel + (Rodley weir bypass channel)
- Case study:Source to Sea Programme – 6. Roeburn Ford easement + (Old river crossing - with fish passes that do not work!)
- Case study:LIFE RISORGIVE – Roggia Tergola Sud + (Roggia Tergola Poster)
- Case study:Guadiato Life project Model for restoring and integrating water resources in a mining area, actions for an alternative development + (Aerial view of La Coronada, municipality where a green filter has been placed)
- Case study:Welton Farm Landfill/Riverbank Works + (Historic Landfill)
- Case study:River Dulais Restoration Project + (Root wad being installed in the bank)
- Case study:Meander reinstatement on the River Wensum at the Ryburgh Loop + (Ryburgh Common pre works)
- Case study:Démantèlement de l’ouvrage du Pont Fourneau sur la Selle + (L’ouvrage du Pont Fourneau sur la Selle. Mars 2005 (Source: SIAHSA).)
- Case study:The Pow Beck Improvement Project + (Pow Beck fencing and tree planting)
- Case study:Mayesbrook Climate Change Park restoration project + (Jubilee planting event, March 2012 © LBBD)
- Case study:Saltburn Gill ironstones mines + (Mine discharge point)
- Case study:Fluvial longitudinal continuity recovery in river Aguanaz, Cantabria, Spain + (Santa Marina village)
- Case study:The Babina Restoration Project + (The Babina polder before restoration)
- Case study:The Cernovca Restoration Project + (Satellite image of Cernovca area (1993))
- Case study:Design and Application of a Sustainable Soil Management Model for Orchard Crops in the Doñana National Park Area + (Satellite image of the area of action)
- Case study:Prologis Midpoint Park river restoration scheme + (River Tame pre-restoration)
- Case study:Removal of Maisons-Rouges dam over the River Vienne + (Maisons Rouges dam before the removal.)
- Case study:Source to Sea Programme – 2. Pan-Morecambe Bay Wetlands and Waterbodies Restoration + (Savinhill Moss - tree clearance and abstraction by horse)
- Case study:Gilev's Grove reconstruction + (Klyuchi stream rehabilitation)
- Case study:Creating a fishpass at Włocławek dam + (Vistula River Natural Stretch. (Katarzyna Suska SSIFI).)
- Case study:Aesthetic vs. functional restoration of urban and peri-urban rivers: the Manzanares River in Madrid + (The Manzanares River near the historical Toledo Bridge by the early 20th century, showing the characteristic patterns of the near-natural multi-thread river channel (Photo source: Madrid City Council and CEDEX).)
- Case study:River Marden at Calne + (River Marden before restoration looking downstream)
- Case study:Restoration in the lower reach of the Cinca River + (Aerial view of the area of action)
- Case study:Basic proposals for restoration and enhancement of the stream of Vilamajor in Sant Antoni de Vilamajor + (Map of the area of action)
- Case study:Restoration of the stream of Vallicrosa in the section of the source of Pic + (Map of the restoration area)
- Case study:Salmons Brook Flood Alleviation Scheme, Montagu Recreation Ground site + (Scheme plan)
- Case study:Strengthening associated biodiversity of habitat 92A0 and control of Invasive Alien Species in the Segura River (LIFE + Ripisilvanatura) + (Scope of action)
- Case study:LIFE Segura Riverlink (Through rivers) + (Scope of action)
- Case study:River Nene Nature Improvement Area + (An example of improved urban marginal river habitat on the Nene)
- Case study:Oughtershaw NFM + (Scrape)
- Case study:Nigg Bay Managed Realignment Scheme + (Sea aster in bloom; view across site towards one of the breaches (Taken by: K. Chisolm, RSPB, 2007))
- Case study:Deculverting Djupsund stream + (Djupsund stream after deculvering. Picture: Miguel A. Segarra Valls)
- Case study:LIFE RISORGIVE – Fontane Marzare + (Fontane Marzare)
- Case study:East Tullos Burn Environment Improvements Project + (Selection of images of site before construction phase of project.)
- Case study:Wild Wylye Phase 1 + (Large Woody Debris Secured on the inner bend propagates sedimentation, eventually leading to channel narrowing.)
- Case study:River Nar Restoration Project + (LWD - River Nar, West Acre)
- Case study:Rehabilitation of the river Segeråga + (Removing inorganic material (sludge/fine sand. Photo: Kjetil Hansen, Rødøy municipality)