Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River restoration project in Congost between the torrent of Malhivern and end of the municipality of La Garriga + (Map of the restoration area)
- Case study:Ecological restoration of The Arboleda and the Meander of Santes Creus. Aiguamúrcia municipality (Alt Camp). Gaia River Basin + (Aerial view of the area)
- Case study:Restoration project of the river area of the streams of Vallmanya and Reixac + (Map of the restoration area)
- Case study:Pearls in Peril LIFE+ GB Project - Mingary Burn + (PiP - Mingarry Burn)
- Case study:Pearls in Peril LIFE+ GB Project - River Dee + (Map of instream restoration sites - Aboyne & Banchory)
- Case study:Restoration in river Tajo and tributaries after kaolin spillage + (Map of the restoration area)
- Case study:Bowston Weir Removal + (Picture by cbec)
- Case study:Route water: environmental restoration project for tourist use + (Picture of El Gollizno, a local place)
- Case study:Demolition of weir on the River Nora, Nalón Basin + (Aerial view of Guyame)
- Case study:SCI Parga-Ladra-Támoga: recovery of bog woodland and dystrophic lake + (Picture of Pozos do Ollo)
- Case study:Recovery of riparian vegetation affected by fire in Canaletes River and tributaries. Horta de San Joan + (Map of the area of action)
- Case study:Zújar river restoration in the reach between the dam and the ford of "El Espolón" , Badajoz. + (Aerial view of the restoration area)
- Case study:International recovery of the river Minho: an example of sustainable hydraulic exploitation + (Aerial view of the restoration area)
- Case study:Zújar river restoration in the reach between the ford of "El Espolón" and the Chapel of St Mary of Zújar , Badajoz. + (Aerial view of the restoration area)
- Case study:Design and Application of a Sustainable Soil Management Model for Orchard Crops in the Doñana National Park Area + (Satellite image of the area of action)
- Case study:Environmental restoration of the lower section of the river Narcea in the municipalities of Salas and Pravia (Asturias) + (Aerial view of Narcea River as it passes through Cornellana)
- Case study:Restoration of the stream of Vallicrosa in the section of the source of Pic + (Map of the restoration area)
- Case study:Environmental restoration project of the Guadajoz River (Castro del Río, Andalusia) + (Aerial view of Guadajoz River in Castro del Río (Córdoba))
- Case study:Rio San Martino and Piovega di Scandolara restoration project + (A new buffer strip inside the enlarged bed section)
- Case study:LIFE REWETLAND - A wide-area programme for improving the quality of surface water in the agro pontino by means of natural purification techniques + (LIFE REWETLAND (LIFE+08 env/it/000406))
- Case study:Source to Sea Programme – 1. Leighton Moss Resource Protection + (New deep flow gutters needed on traditional buildings to take water to new clean water drain)
- Case study:Effacement partiel du seuil Cros sur la Dunière + (Le seuil de Cros avant effacement partiel. Été 2009 (Source: Sicala))
- Case study:Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage. + (Map of the actuation area)
- Case study:River Dearne at Mexborough + (Canalised reach before restoration works)
- Case study:Llobregat river restoration + (Map of the restoration area)
- Case study:Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia ) + (Aerial view of the restoration area)
- Case study:LIFE RISORGIVE – Fontane Marzare + (Fontane Marzare)
- Case study:LIFE RISORGIVE – Roggia Girosa + (Risorgiva)
- Case study:Case study:Biological protection shield to control streambank erosion in Ätran 2 + (Plan for the restoration.)
- Case study:Fluvial river restoration of Tordera in Sant Celoni + (Aerial view of the restoration area)
- Case study:River Alt and Croxteth Brook Restoration Project. + (Original river flowing into culvert)
- Case study:Glenbrook Wetlands + (Creating basin 1)
- Case study:Eddleston water + (New gravel side bar. Photo: Ulrika Åberg, RRC)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Construction of green infrastructures in the Fondazione Caetani farm – Restoration of the Fosso Epitaffio + (Restoration project)
- Case study:Platt Brook Restoration + (Platt Brook before restoration)