Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Syston and Barkston Restoration + (Tree works)
- Case study:Resilient River + (Barnwell Backchannel Interpretation Panel)
- Case study:Brook Ramlösa-Restoration of agricultural stream + (Restored stream (photo. Outi Laamanen))
- Case study:River Keekle Restoration + (Typical condition pre-restoration)
- Case study:Trees on the River Uck + (Trees on the River Uck Project catchment map)
- Case study:Fluvial river restoration of Tordera in Sant Celoni + (Aerial view of the restoration area)
- Case study:Ruppoldingen + (The map and plan of Ruppoldingen fishpass.)
- Case study:Rheinfelden bypass + (The map of Rheinfelden bypass. New power plant designed as run-of-river type. Near-nature water course installed in the old headrace channel. (photo: Walter Binder))
- Case study:Wettingen, nature-like fish pass + (Nature-like bypass channel: River Limmat, Wettingen (photo: Walter Binder))
- Case study:Elgin Flood Alleviation Scheme + (Pansport Bridge aerial photograph - September 2014 © Royal HaskoningDHV)
- Case study:Improving the ecological status of the Black River and tributaries (Zamora) + (Map of the restoration area)
- Case study:Dumbreck Marsh & Garrel Burn Restoration + (Fish pass (lower))
- Case study:Gilev's Grove reconstruction + (Klyuchi stream rehabilitation)
- Case study:Wyhlen, nature-like pool pass and fish lift + (Fish lift (photo: Pinja Kasvio))
- Case study:Swindale Beck Restoration + (Swindale Beck restoration work in progress)
- Case study:Manthorpe Floodplain Reconnection + (New channel evolving.)
- Case study:Stainby Road, Colsterworth + (Newly installed Lincs Limestone Gravel Feature)
- Case study:Lodge Burn cascade fish pass and culvert bed restoration (as part of the Lodge Burn FAS) + (Culvert outlet pre-works was causing a major obstruction to fish passage (Rivers Agency))
- Case study:Source to Sea Programme – 6. Roeburn Ford easement + (Old river crossing - with fish passes that do not work!)
- Case study:Source to Sea Programme – 1. Leighton Moss Resource Protection + (New deep flow gutters needed on traditional buildings to take water to new clean water drain)
- Case study:River Wye Habitat Restoration Project + (New flow deflectors (High Wycombe District Council))
- Case study:Biomura LIFE06NAT/SI/000066 + (New gravel bars)
- Case study:Eddleston water + (New gravel side bar. Photo: Ulrika Åberg, RRC)
- Case study:Source to Sea Programme – 1. Leighton Moss Resource Protection + (New deep flow gutters needed on traditional buildings to take water to new clean water drain)
- Case study:Ålgårda nature-like bypass channel at River Rolfsån + (Ålgårda Hyro power plant (photo. Outi Laamanen))
- Case study:Source to Sea Programme – 6. Roeburn Ford easement + (Old river crossing - with fish passes that do not work!)
- Case study:Source to Sea Programme – 7. Beckfoot Ford, Barbon Beck + (Ford crossing - barrier to sediment and fish movement)
- Case study:Deculverting Djupsund stream + (Djupsund stream after deculvering. Picture: Miguel A. Segarra Valls)
- Case study:New Forest LIFE project + (The old course of the stream)
- Case study:Restoration of Wandle Park + (During works)
- Case study:Elgin Flood Alleviation Scheme + (Pansport Bridge aerial photograph - September 2014 © Royal HaskoningDHV)
- Case study:River Dearne at Mexborough + (Canalised reach before restoration works)
- Case study:Kvarnekulla nature like bypass channel at River Knipån + (Meandering new stream (photo. Maria Arola))
- Case study:Long Preston Deeps Flood Plain Project + (Laser Scanner)
- Case study:Saving Chiswick Eyot + (Old Chiswick Conservation Area. London borough of Hounslow)
- Case study:Wyndham Park, Grantham + (Newly installed berm)
- Case study:Zero river restoration project + (Zero river after restoration)
- Case study:River rehabilitation on the River Wensum at Swanton Morley + (Newly created filled berms – August 2012 ©Environment Agency)
- Case study:Eden Crayfish Restoration Project + (Eden Catchment - ecological status)
- Case study:Grantham Blue Green - Urban Reach + (Gravel being added to channel.)
- Case study:River Alt at Knowsley + (River Alt prior to works)
- Case study:CASE STUDY OF QUALITY IMPROVEMENT IN SHROPSHIRE WILDLIFE TRUST AREA + (Original external pesticide handling area)
- Case study:Stainby Road, Colsterworth + (Newly installed Lincs Limestone Gravel Feature)
- Case study:3Rivers - Lumburn:Walkham:Tavy + (Newly planted trees - Lower Tavy)
- Case study:River Keekle Restoration + (Typical condition pre-restoration)
- Case study:Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas + (L’un des étangs de Branguily en avril 2008 (Source: Althis).)
- Case study:River Alt and Croxteth Brook Restoration Project. + (Original river flowing into culvert)