Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Idle Restoration Project + (Aerial photo of erosion at Scaftworth)
- Case study:Ennerdale Mill Weir Removal + (View from below the weir, highlighting the extent of the drop in water levels)
- Case study:Austria/Slovenia cross-border section - Interreg IIIa Project "Maßnahmen Unteres Murtal" 2003-2008 + (Interreg IIIa Project "Maßnahmen Unteres Murtal" 2003-2008 - project overview)
- Case study:Restoration of the Pantanello wetland area (Fondazione Caetani) + (Pantanello)
- Case study:The Fortuna Restoration Project + (Fortuna lake location (source: www.panoramio.com))
- Case study:Dove Weir removal + (Example of an existing weir upstream of works, August 2011)
- Case study:Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia ) + (Aerial view of the restoration area)
- Case study:Isar-Plan + (Isar river in Munich 2013)
- Case study:River Nar Restoration Project + (LWD - River Nar, West Acre)
- Case study:River Alt at Knowsley + (River Alt prior to works)
- Case study:Saving Chiswick Eyot + (Old Chiswick Conservation Area. London borough of Hounslow)
- Case study:Restoring of ecological connectivity and implementation of activities improving functioning of the free river migration corridor + (Jankowa (km 61+160 Biala River))
- Case study:River Seaton: Abandoned Metal Mines + (Jopes Adit, South Caradon mine)
- Case study:Mayesbrook Climate Change Park restoration project + (Jubilee planting event, March 2012 © LBBD)
- Case study:River Alt and Croxteth Brook Restoration Project. + (Original river flowing into culvert)
- Case study:Logie Burn Restoration Project + (July 2011)
- Case study:Logie Burn Restoration Project +
- Case study:Restoration of Juottimenoja Brook + (Juottimenoja before restoration (2-stage drainage channel) (photo: Auri Sarvilinna).jpg)
- Case study:Source to Sea Programme – 3. Upper Wenning Restoration + (Crook Beck - Environment Agency inspecting new fences - where none had been before)
- Case study:Removal of the Kernansquillec dam over the River Léguer + (Kernansquillec dam and its reservoir in the last century.)
- Case study:Kirkstone Beck River Restoration + (Kirkstone Beck pre-restoration, a snarrow, single thread channel with revetments, embankments and little diversity)
- Case study:Gilev's Grove reconstruction + (Klyuchi stream rehabilitation)
- Case study:Restoration of Ingarskilanjoki River + (Ingarskilanjoki River before restoration (photo: Harri Aulaskari))
- Case study:Restoration of Kocksbybäcken brook + (Kocsbybäcken brook before restoration (photo: Liisa Hämäläinen))
- Case study:River restoration project in Congost between the torrent of Malhivern and end of the municipality of La Garriga + (Map of the restoration area)
- Case study:Kuuskoski-Fishway + (Kuuskoski Torrent fishway (photo:Pasi Lempinen))
- Case study:Austria Upper Mur - LIFE III (LIFE03 NAT/A/000011) „Inner-Alpine river basin management – Upper River Mur - murerleben I" 2003-2007 + (LIFE III (LIFE03 NAT/A/000011) „Inner-Alpine river basin management – Upper River Mur - murerleben I" 2003-2007 and LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-2015 ©freiland)
- Case study:Austria Upper Mur - LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-2015 + (LIFE III (LIFE03 NAT/A/000011) „Inner-Alpine river basin management – Upper River Mur - murerleben I" 2003-2007 and LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-2015 ©freiland)
- Case study:LIFE REWETLAND - A wide-area programme for improving the quality of surface water in the agro pontino by means of natural purification techniques + (LIFE REWETLAND (LIFE+08 env/it/000406))
- Case study:LIFE Saramugo + (LIFE Saramugo)
- Case study:River Nar Restoration Project + (LWD - River Nar, West Acre)
- Case study:Arasement du vannage du moulin de Réveillon et réaménagement du lit mineur de la Blaise + (Le seuil du moulin de Réveillon, vue de l’amont avant effacement (Source: SIVB).)
- Case study:Restauration du matelas alluvial de la Clouère par recharge granulométrique + (La Clouère, secteur L, avant les travaux (Source: Michel Bramard – Onema).)
- Case study:Rétablissement de la continuité écologique sur la Luire + (Un des ouvrages problématiques sur la Luire à Clos Merle (2008) (Source: SIAG).)
- Case study:Removal and opening of sluice gates on the Vence River + (The sluice gate of Saint-Marceau in March 2007, three years after its opening.)
- Case study:Reconstitution du matelas alluvial de la Vesgre à Houdan + (La Vesgre sur le secteur restauré en amont, avant travaux en 2011 (Source: Alexandra Guibert ; Yann Guso, CCPH))
- Case study:Suppression de l’étang de Condé-sur-Iton et restauration de zones humides + (L’étang de Condé dans les années 1910 (Source: Onema).)
- Case study:Effacement du seuil du moulin du Bourg sur le Vicoin + (Vue aval du seuil du moulin du Bourg avec le déversoir central. Juin 2011 (Source: Olivier Leroyer – AFB).)
- Case study:Effacement partiel du seuil Cros sur la Dunière + (Le seuil de Cros avant effacement partiel. Été 2009 (Source: Sicala))
- Case study:Arasement du seuil des Treize Saules sur la Quilienne + (Le seuil des Treize Saules avant ouverture de la vanne. Printemps 2008 (Source: FDPPMA du Pas-de-Calais))
- Case study:The River Ravensbourne (submission for UK Rivers Prize 2016 + (Ladywell Fields following regneration)