Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Rheinfelden bypass + (The map of Rheinfelden bypass. New power plant designed as run-of-river type. Near-nature water course installed in the old headrace channel. (photo: Walter Binder))
- Case study:Rehabilitation of the river Segeråga + (Removing inorganic material (sludge/fine sand. Photo: Kjetil Hansen, Rødøy municipality)
- Case study:Wyhlen, nature-like pool pass and fish lift + (Fish lift (photo: Pinja Kasvio))
- Case study:International recovery of the river Minho: an example of sustainable hydraulic exploitation + (Aerial view of the restoration area)
- Case study:Dumbreck Marsh & Garrel Burn Restoration + (Fish pass (lower))
- Case study:HPP Blanca + (Fish pass after construction (Foto: HESS d. o . o. archive).)
- Case study:Mill house private hydroelectric power generation scheme and fish pass + (Fish pass construction (image courtesy of A.Girdler at A.G.A Group))
- Case study:Kirkstall Valley Weir Fish Passes Project + (Map of the area)
- Case study:Healthy Rivers + (Blockage removed from Ebbw River)
- Case study:LIFE Segura Riverlink (Through rivers) + (Scope of action)
- Case study:The Fortuna Restoration Project + (Fortuna lake location (source: www.panoramio.com))
- Case study:Creating a fishpass at Włocławek dam + (Vistula River Natural Stretch. (Katarzyna Suska SSIFI).)
- Case study:Restoring sea-trout and salmon habitat in Aurlandselva + (Gravel cover applied in the river (Check link below in "additional links and references" for source).)
- Case study:River Avon Our Water Environment + (One of two areas of sediment to be removed to re-open a secondary channel (W.Boyd-Wallis-CNPA))
- Case study:Camargue’s former saltworks + (Flamants roses sur l etang du Fangassier)
- Case study:River Valency at Boscastle + (Reference reach upstream of Boscastle)
- Case study:Saving Chiswick Eyot + (Old Chiswick Conservation Area. London borough of Hounslow)
- Case study:Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze + (The Vezouze at Lunéville before restoration work. The levee on the left bank prevents flood storage in the flood plain (Rhin-Meuse Water Agency))
- Case study:Lodge Burn Flood Alleviation Scheme + (Channel restoration in Anderson park during works. Gabion baskets installed to constrain lateral channel migration. Courtesy of Gareth Greer - Rivers Agency (Northern Ireland). See main project photo for post-restoration channel.)
- Case study:River Worfe Restoration Initiative + (APEM scientist undertaking catchment survey on the Worfe)
- Case study:Eddleston water + (Flooding from the air)
- Case study:Reopening side channels along the Saône in Jassans-Riottier + (Earthwork to restore a side channel and ponds. October 2007. (Voies navigables de France (VNF).)
- Case study:Aston Clinton River Restoration + (Flooding over BCC and ACPC land)
- Case study:River Alt at Knowsley + (River Alt prior to works)
- Case study:Eldbäcken + (Floodplain habitat during high flow conditions. Photo: Olle Calles)
- Case study:Rehabilitation of the River Brett at Shelley, Suffolk + (Composite berm consisting of a downstream flow deflector back-filled with spoil material taken from the originally over-steep embankment. The wooden toe adds stability and protection to the feature.)
- Case study:LIFE RISORGIVE – Fontane Marzare + (Fontane Marzare)
- Case study:Source to Sea Programme – 7. Beckfoot Ford, Barbon Beck + (Ford crossing - barrier to sediment and fish movement)
- Case study:Forest Halt, Saltburn Valley Gardens + (Forest Halt)
- Case study:Haltwhistle burn; a total catchment approach + (Electro-fishing with volunteers)
- Case study:River Valency at Boscastle + (Reference reach upstream of Boscastle)
- Case study:The Fortuna Restoration Project + (Fortuna lake location (source: www.panoramio.com))
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Construction of green infrastructures in the Fondazione Caetani farm – Restoration of the Fosso Epitaffio + (Restoration project)
- Case study:Pearls in Peril LIFE+ GB Project - River Dee + (Map of instream restoration sites - Aboyne & Banchory)
- Case study:West Amesbury + (From hatches facing upstream, prior to project delivery.)
- Case study:The Pow Beck Improvement Project + (Pow Beck fencing and tree planting)
- Case study:Restoration of the marsh "Gallega" + (Aerial view of Gallega marsh in October 2004)
- Case study:Dumbreck Marsh & Garrel Burn Restoration + (Fish pass (lower))
- Case study:River Stour at Glen's weir (Throop fisheries) + (Glen's Weir (EA report, 2011))
- Case study:ECOREMEDIATION SYSTEM (ERM) FOR TREATMENT OF POLLUTED TRIBUTARY OF GLINŠČICA + (Glinščica tributary (on the left) and treatment ditch (on the right) with a new river bed with meanders (Vzdrževanje …, 2009).)
- Case study:Goldrill Beck River Restoration + (Goldrill Beck pre-restoration, seen here running alongside the A592)
- Case study:River Irwell Restoration Project + (Goshan after weir removal)
- Case study:Upper Witham Restoration + (Colsterworth just after restoration.)
- Case study:Ennerdale Mill Weir Removal + (View from below the weir, highlighting the extent of the drop in water levels)
- Case study:Kvarnekulla nature like bypass channel at River Knipån + (Meandering new stream (photo. Maria Arola))
- Case study:Re-connecting Meanders at Cranebank on the River Crane + (Gravel bar installed to block old straightened channel, pushing main flow around re-connected meander)