Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:New Forest LIFE project + (The old course of the stream)
- Case study:3Rivers - Lumburn:Walkham:Tavy + (Newly planted trees - Lower Tavy)
- Case study:Haltwhistle burn; a total catchment approach + (Electro-fishing with volunteers)
- Case study:The Pow Beck Improvement Project + (Pow Beck fencing and tree planting)
- Case study:Eden Crayfish Restoration Project + (Eden Catchment - ecological status)
- Case study:River Idle Restoration Project + (Aerial photo of erosion at Scaftworth)
- Case study:Bristol Frome Diffuse Pollution Project + (In-ditch wetland to seperate clean water from dirty water before entering the Ladden Brook)
- Case study:Source to Sea Programme – 3. Upper Wenning Restoration + (Crook Beck - Environment Agency inspecting new fences - where none had been before)
- Case study:Removing a weir and renaturalising the Iton River on the Plis industrial site in Hondouville + (The meadow after restoration of the wetland (2014) (SCA Tissue France).)
- Case study:Houghton 'trout stream' enhancements + (River Lamprey spawining on clean gravels)
- Case study:Whit Beck River Restoration Project + (The heavily modified raised river channel)
- Case study:Marsh restoration on the Merlue + (The Merlue just downstream the marsh in summer 2009. The bed moved [on the left] on the edge of the marsh [on the right] has been filled during the restoration works.)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (Arrival of mechanisation at the entry to the lake)
- Case study:Woughton on the Green bank stabilization + (Large log bundles at base)
- Case study:Kvarnekulla nature like bypass channel at River Knipån + (Meandering new stream (photo. Maria Arola))
- Case study:Rheinfelden bypass + (The map of Rheinfelden bypass. New power plant designed as run-of-river type. Near-nature water course installed in the old headrace channel. (photo: Walter Binder))
- Case study:LIFE Segura Riverlink (Through rivers) + (Scope of action)
- Case study:Rehabilitation of the river Segeråga + (Removing inorganic material (sludge/fine sand. Photo: Kjetil Hansen, Rødøy municipality)
- Case study:Wyhlen, nature-like pool pass and fish lift + (Fish lift (photo: Pinja Kasvio))
- Case study:International recovery of the river Minho: an example of sustainable hydraulic exploitation + (Fish lift photograph)
- Case study:Mill house private hydroelectric power generation scheme and fish pass + (Fish pass construction (image courtesy of A.Girdler at A.G.A Group))
- Case study:Dumbreck Marsh & Garrel Burn Restoration + (Fish pass (lower))
- Case study:HPP Blanca + (Fish pass after construction (Foto: HESS d. o . o. archive).)
- Case study:Kirkstall Valley Weir Fish Passes Project + (Map of the area)
- Case study:Healthy Rivers + (Blockage removed from Ebbw River)
- Case study:LIFE Segura Riverlink (Through rivers) + (Scope of action)
- Case study:The Fortuna Restoration Project + (Fortuna lake location (source: www.panoramio.com))
- Case study:Creating a fishpass at Włocławek dam + (Vistula River Natural Stretch. (Katarzyna Suska SSIFI).)
- Case study:Restoring sea-trout and salmon habitat in Aurlandselva + (Gravel cover applied in the river (Check link below in "additional links and references" for source).)
- Case study:River Avon Our Water Environment + (One of two areas of sediment to be removed to re-open a secondary channel (W.Boyd-Wallis-CNPA))
- Case study:Camargue’s former saltworks + (Flamants roses sur l etang du Fangassier)
- Case study:River Valency at Boscastle + (Reference reach upstream of Boscastle)
- Case study:Saving Chiswick Eyot + (Old Chiswick Conservation Area. London borough of Hounslow)
- Case study:Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze + (The Vezouze at Lunéville before restoration work. The levee on the left bank prevents flood storage in the flood plain (Rhin-Meuse Water Agency))
- Case study:Lodge Burn Flood Alleviation Scheme + (Channel restoration in Anderson park during works. Gabion baskets installed to constrain lateral channel migration. Courtesy of Gareth Greer - Rivers Agency (Northern Ireland). See main project photo for post-restoration channel.)
- Case study:River Worfe Restoration Initiative + (APEM scientist undertaking catchment survey on the Worfe)
- Case study:Eddleston water + (New gravel side bar. Photo: Ulrika Åberg, RRC)
- Case study:Reopening side channels along the Saône in Jassans-Riottier + (Earthwork to restore a side channel and ponds. October 2007. (Voies navigables de France (VNF).)
- Case study:Aston Clinton River Restoration + (Flooding over BCC and ACPC land)
- Case study:River Alt at Knowsley + (River Alt prior to works)
- Case study:Eldbäcken + (Floodplain habitat during high flow conditions. Photo: Olle Calles)
- Case study:Rehabilitation of the River Brett at Shelley, Suffolk + (Composite berm consisting of a downstream flow deflector back-filled with spoil material taken from the originally over-steep embankment. The wooden toe adds stability and protection to the feature.)
- Case study:LIFE RISORGIVE – Fontane Marzare + (Fontane Marzare)
- Case study:Source to Sea Programme – 7. Beckfoot Ford, Barbon Beck + (Ford crossing - barrier to sediment and fish movement)
- Case study:Forest Halt, Saltburn Valley Gardens + (Forest Halt)