Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Restoration of the surface flows of two temporary tributaries of the upstream Clauge + (The straight bed of a tributary of the Clauge in 2005, prior to the remeandering works.)
- Case study:Dove Weir removal + (Example of an existing weir upstream of works, August 2011)
- Case study:Houghton 'trout stream' enhancements + (River Lamprey spawining on clean gravels)
- Case study:East Tullos Burn Environment Improvements Project + (Selection of images of site before construction phase of project.)
- Case study:Langonnet river + (Examples of intervention on the Lagonnet river.)
- Case study:Creation of spawning ground for Baltic salmon, anadromous brown trout and river lamprey at Veneküla rapid, river Pirita + (Groundbreaking work in process)
- Case study:Source to Sea Programme – 1. Leighton Moss Resource Protection + (New deep flow gutters needed on traditional buildings to take water to new clean water drain)
- Case study:River Valency at Boscastle + (Reference reach upstream of Boscastle)
- Case study:Rehabilitation of the river Segeråga + (Removing inorganic material (sludge/fine sand. Photo: Kjetil Hansen, Rødøy municipality)
- Case study:Skjern River Project + (Removal of an old pumping station)
- Case study:River Darent at Hawley Manor + (River Darent at Hawley Manor before works)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (Arrival of mechanisation at the entry to the lake)
- Case study:Retour dans son talweg d’origine de la Souffel à Reichstett et création de mares + (Exemple d’un secteur rectifié sur la Souffel [mars 2012] (Source: Rémy Gentner, Eurométropole de Strasbourg).)
- Case study:Restoration of R. Odelouca 2 + (restored section: invasive species were erradicated and replaced by a willow after a cribwall structure)
- Case study:Ecological restoration of The Arboleda and the Meander of Santes Creus. Aiguamúrcia municipality (Alt Camp). Gaia River Basin + (Aerial view of the area)
- Case study:River Alt and Croxteth Brook Restoration Project. + (Original river flowing into culvert)
- Case study:Source to Sea Programme – 5. Borrowdale Moss, Peatland Restoration + (Exposed peat - erosion problem)
- Case study:ReNaturalize + (Faggot bundles)
- Case study:Source to Sea Programme – 2. Pan-Morecambe Bay Wetlands and Waterbodies Restoration + (Savinhill Moss - tree clearance and abstraction by horse)
- Case study:Eddleston water + (New gravel side bar. Photo: Ulrika Åberg, RRC)
- Case study:New Forest LIFE project + (The old course of the stream)
- Case study:3Rivers - Lumburn:Walkham:Tavy + (Newly planted trees - Lower Tavy)
- Case study:Haltwhistle burn; a total catchment approach + (Electro-fishing with volunteers)
- Case study:The Pow Beck Improvement Project + (Pow Beck fencing and tree planting)
- Case study:Eden Crayfish Restoration Project + (Eden Catchment - ecological status)
- Case study:River Idle Restoration Project + (Aerial photo of erosion at Scaftworth)
- Case study:Bristol Frome Diffuse Pollution Project + (In-ditch wetland to seperate clean water from dirty water before entering the Ladden Brook)
- Case study:Source to Sea Programme – 3. Upper Wenning Restoration + (Crook Beck - Environment Agency inspecting new fences - where none had been before)
- Case study:Removing a weir and renaturalising the Iton River on the Plis industrial site in Hondouville + (The meadow after restoration of the wetland (2014) (SCA Tissue France).)
- Case study:Houghton 'trout stream' enhancements + (River Lamprey spawining on clean gravels)
- Case study:Whit Beck River Restoration Project + (The heavily modified raised river channel)
- Case study:Marsh restoration on the Merlue + (The Merlue just downstream the marsh in summer 2009. The bed moved [on the left] on the edge of the marsh [on the right] has been filled during the restoration works.)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (Arrival of mechanisation at the entry to the lake)
- Case study:Woughton on the Green bank stabilization + (Large log bundles at base)
- Case study:Wyhlen, nature-like pool pass and fish lift + (Fish lift (photo: Pinja Kasvio))
- Case study:Kvarnekulla nature like bypass channel at River Knipån + (Meandering new stream (photo. Maria Arola))
- Case study:Rheinfelden bypass + (The map of Rheinfelden bypass. New power plant designed as run-of-river type. Near-nature water course installed in the old headrace channel. (photo: Walter Binder))
- Case study:LIFE Segura Riverlink (Through rivers) + (Scope of action)
- Case study:Rehabilitation of the river Segeråga + (Removing inorganic material (sludge/fine sand. Photo: Kjetil Hansen, Rødøy municipality)
- Case study:International recovery of the river Minho: an example of sustainable hydraulic exploitation + (Aerial view of the restoration area)
- Case study:Mill house private hydroelectric power generation scheme and fish pass + (Fish pass construction (image courtesy of A.Girdler at A.G.A Group))
- Case study:Dumbreck Marsh & Garrel Burn Restoration + (Fish pass (lower))
- Case study:HPP Blanca + (Fish pass after construction (Foto: HESS d. o . o. archive).)