Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Eau Blanche River (Walphy - LIFE project) + (Straightening of the Eau blanche river)
- Case study:Source to Sea Programme – 7. Beckfoot Ford, Barbon Beck + (Ford crossing - barrier to sediment and fish movement)
- Case study:Resilient River + (Barnwell Backchannel Interpretation Panel)
- Case study:Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros + (Aerial view of Guadalquivir River and Montaña del Río town. 2005)
- Case study:Improved longitudinal continuity of the Lozoya River, upstream the Pinilla dam (Madrid) + (Aerial view of the restoration area)
- Case study:Effacement partiel de 14 seuils sur le Mutterbach et l’Hosterbach à Holving et Hoste + (Surélargissement du cours d’eau au niveau d’un seuil sur le Mutterbach. Janvier 2009 (Source: Patrice Muller, AFB).)
- Case study:Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia ) + (Aerial view of the restoration area)
- Case study:Restoration of Enningdalsälv River + (Enningdalsälv River_after restoration)
- Case study:Saving Chiswick Eyot + (Old Chiswick Conservation Area. London borough of Hounslow)
- Case study:Mayesbrook Climate Change Park restoration project + (Jubilee planting event, March 2012 © LBBD)
- Case study:Environment-friendly Reduction of Flood Risk in the Multi-thread Reach of the Czarny Dunajec River + (Environment-friendly Reduction of Flood Risk in the Multi-thread Reach of the Czarny Dunajec River landscape at Czarny Dunajec River)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Environmental restoration of the wet ecosystem along the Ufente river + (Environmental restoration of the wet ecosystem along the Ufente river)
- Case study:River restoration project in Sella, Asturias + (Aerial view of Sella River downstream Arriondas)
- Case study:Bio-engineering techniques for bank protection on the Moselle River in Villey-le-Sec + (Eroded sections appeared in the banks following the collapse of metal sheet piles along the Moselle River. August 2008. (Patrick Adolph – VNF).)
- Case study:Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras + (Banks protected by sheet piles prior to the restoration works. Autumn 2010. (Communauté urbaine d’Arras).)
- Case study:River Alt and Croxteth Brook Restoration Project. + (Original river flowing into culvert)
- Case study:Restoration of a stretch of the river of Santa Coloma + (Erosion control on slopes)
- Case study:Ecological restoration of The Arboleda and the Meander of Santes Creus. Aiguamúrcia municipality (Alt Camp). Gaia River Basin + (Aerial view of the area)
- Case study:River Idle Restoration Project + (Aerial photo of erosion at Scaftworth)
- Case study:River Little Ouse at Thetford + (Reopening the meanders)
- Case study:Environmental restoration of the lower section of the river Narcea in the municipalities of Salas and Pravia (Asturias) + (Aerial view of Narcea River as it passes through Cornellana)
- Case study:Meades water garden regeneration project + (Downstream of the bridge during construction (top) and post-restoration (below))
- Case study:Restoration of Kalajoki River + (Catchment of River Kalajoki (Jouni Näpinkangas))
- Case study:The Babina Restoration Project + (The Babina polder before restoration)
- Case study:Toce River: conservation of riparian habitats for breeding and migratory birds - LIFE02 NAT/IT/008572 + (Eutrophic lake before the activities.)
- Case study:Mayesbrook Climate Change Park restoration project + (Jubilee planting event, March 2012 © LBBD)
- Case study:Restoration of the surface flows of two temporary tributaries of the upstream Clauge + (The straight bed of a tributary of the Clauge in 2005, prior to the remeandering works.)
- Case study:Dove Weir removal + (Example of an existing weir upstream of works, August 2011)
- Case study:Houghton 'trout stream' enhancements + (River Lamprey spawining on clean gravels)
- Case study:East Tullos Burn Environment Improvements Project + (Selection of images of site before construction phase of project.)
- Case study:Langonnet river + (Examples of intervention on the Lagonnet river.)
- Case study:Creation of spawning ground for Baltic salmon, anadromous brown trout and river lamprey at Veneküla rapid, river Pirita + (Groundbreaking work in process)
- Case study:Source to Sea Programme – 1. Leighton Moss Resource Protection + (New deep flow gutters needed on traditional buildings to take water to new clean water drain)
- Case study:River Valency at Boscastle + (Reference reach upstream of Boscastle)
- Case study:Rehabilitation of the river Segeråga + (Removing inorganic material (sludge/fine sand. Photo: Kjetil Hansen, Rødøy municipality)
- Case study:Skjern River Project + (Removal of an old pumping station)
- Case study:River Darent at Hawley Manor + (River Darent at Hawley Manor before works)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (Arrival of mechanisation at the entry to the lake)
- Case study:Retour dans son talweg d’origine de la Souffel à Reichstett et création de mares + (Exemple d’un secteur rectifié sur la Souffel [mars 2012] (Source: Rémy Gentner, Eurométropole de Strasbourg).)
- Case study:Restoration of R. Odelouca 2 + (restored section: invasive species were erradicated and replaced by a willow after a cribwall structure)
- Case study:River Alt and Croxteth Brook Restoration Project. + (Original river flowing into culvert)
- Case study:Source to Sea Programme – 5. Borrowdale Moss, Peatland Restoration + (Exposed peat - erosion problem)