Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Wallasea (North) Managed Realignment + (Dredge sediment recharging in November 2005)
- Case study:Welton Farm Landfill/Riverbank Works + (Historic Landfill)
- Case study:Eddleston water + (New gravel side bar. Photo: Ulrika Åberg, RRC)
- Case study:Ruppoldingen + (The map and plan of Ruppoldingen fishpass.)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (Arrival of mechanisation at the entry to the lake)
- Case study:River Dulais Restoration Project + (Root wad being installed in the bank)
- Case study:The Holbina-Dunavat Restoration Project + (The entrance in Holbina area (source:www.info-delta.ro))
- Case study:Chowder Ness Managed Realignment Scheme + (Aerial view of site in December 2006 (5 months post realignment) (taken by ABP))
- Case study:Rio Tepice urban restoration + (Bioengineering works)
- Case study:Barking Creek near A13 + (During construction)
- Case study:Bakenhof Dyke reconstruction + (During construction)
- Case study:Salmons Brook Flood Alleviation Scheme, Montagu Recreation Ground site + (Scheme plan)
- Case study:Whit Beck River Restoration Project + (The heavily modified raised river channel)
- Case study:Albany Park + (Drone Photograph during early phase of construction)
- Case study:Restoration, protection and sustainable development of protected area "Zlato pole" + (Before restoration)
- Case study:Pow Burn Restoration Project + (Pre-restoration location B showing straight incised channel with disconneted riparian zone)
- Case study:Wild Wylye Phase 1 + (Large Woody Debris Secured on the inner bend propagates sedimentation, eventually leading to channel narrowing.)
- Case study:River Darent at Hawley Manor + (During works)
- Case study:Wansbeck 100 + (During works)
- Case study:Habitat improvements in the upper Kennet + (During works)
- Case study:Restoration of Wandle Park + (During works)
- Case study:River Soar fish refuge and wetland scrape + (During works)
- Case study:Conservation of alluvial + (The Danube River)
- Case study:Alkborough tidal defence scheme + (During works_1)
- Case study:Effacement du seuil de Chelles Basse sur le Miodet + (Mise en place d’un chenal de dérivation pendant les travaux (Source: Alain Bonnet - Onema).)
- Case study:Arasement du seuil des Treize Saules sur la Quilienne + (Le seuil des Treize Saules avant ouverture de la vanne. Printemps 2008 (Source: FDPPMA du Pas-de-Calais))
- Case study:Effacement du seuil du moulin du Bourg sur le Vicoin + (Vue aval du seuil du moulin du Bourg avec le déversoir central. Juin 2011 (Source: Olivier Leroyer – AFB).)
- Case study:Création d’un bras de contournement de plusieurs étangs sur le Fliez et restauration du marais de Contes + (L’un des étangs de Contes (Source: FDAAPPMA 62).)
- Case study:Austria/Slovenia cross-border section - ETZ-Project “DraMurCi” 2009-2013 + (ETZ-Project “DraMurCi” 2009-2013 - Overview project)
- Case study:Reopening side channels along the Saône in Jassans-Riottier + (Earthwork to restore a side channel and ponds. October 2007. (Voies navigables de France (VNF).)
- Case study:Watercress Farm Rewetting Project + (River Restoration channel drone photography)
- Case study:Effacement du seuil du Moulin d’Hatrize sur l’Orne + (Apparition d’une brèche dans la digue en 2008 (Source: Agence de l’eau Rhin-Meuse).)
- Case study:Eden Crayfish Restoration Project + (Eden Catchment - ecological status)
- Case study:Eau Blanche River (Walphy - LIFE project) + (Straightening of the Eau blanche river)
- Case study:Haltwhistle burn; a total catchment approach + (Electro-fishing with volunteers)
- Case study:HPP Blanca + (Fish pass after construction (Foto: HESS d. o . o. archive).)
- Case study:Source to Sea Programme – 7. Beckfoot Ford, Barbon Beck + (Ford crossing - barrier to sediment and fish movement)
- Case study:Resilient River + (Barnwell Backchannel Interpretation Panel)
- Case study:Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros + (Aerial view of Guadalquivir River and Montaña del Río town. 2005)
- Case study:Improved longitudinal continuity of the Lozoya River, upstream the Pinilla dam (Madrid) + (Aerial view of the restoration area)
- Case study:Effacement partiel de 14 seuils sur le Mutterbach et l’Hosterbach à Holving et Hoste + (Surélargissement du cours d’eau au niveau d’un seuil sur le Mutterbach. Janvier 2009 (Source: Patrice Muller, AFB).)
- Case study:Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia ) + (Aerial view of the restoration area)
- Case study:Restoration of Enningdalsälv River + (Enningdalsälv River_after restoration)
- Case study:Saving Chiswick Eyot + (Old Chiswick Conservation Area. London borough of Hounslow)
- Case study:Mayesbrook Climate Change Park restoration project + (Jubilee planting event, March 2012 © LBBD)