Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Source to Sea Programme – 1. Leighton Moss Resource Protection + (New deep flow gutters needed on traditional buildings to take water to new clean water drain)
- Case study:Pearls in Peril LIFE+ GB Project - River Oykel + (Ditch blocking on the River Oykel (A2168792))
- Case study:River Alt at Knowsley + (River Alt prior to works)
- Case study:Diversion of the River Nith + (Channel diversion in construction (2000). Courtesy of the River Restoration Centre.)
- Case study:Deculverting Djupsund stream + (Djupsund stream after deculvering. Picture: Miguel A. Segarra Valls)
- Case study:Restore riparian floodplain habitats maintained in reserve "Dolna topchia" and run off on his sleeve "Malka Tundzha" + (Dolna topchia Reserve_1)
- Case study:Tall River + (Downstream bays after two years - 1998)
- Case study:Prologis Midpoint Park river restoration scheme + (River Tame pre-restoration)
- Case study:Meades water garden regeneration project + (Downstream of the bridge during construction (top) and post-restoration (below))
- Case study:Wettingen, nature-like fish pass + (Nature-like bypass channel: River Limmat, Wettingen (photo: Walter Binder))
- Case study:Ouzel habitat improvement + (Upstream deflector installation)
- Case study:Allt Lorgy River Restoration + (Before - artificial embankment)
- Case study:Dam removal at Grönkullen, River Rolfsån + (Downstreams from the dam(photo. Maria Arola))
- Case study:Glenbrook Wetlands + (Creating basin 1)
- Case study:The Pow Beck Improvement Project + (Pow Beck fencing and tree planting)
- Case study:SEE River Project + (Drava_Austria)
- Case study:SEE River Project +
- Case study:Wallasea (North) Managed Realignment + (Dredge sediment recharging in November 2005)
- Case study:Welton Farm Landfill/Riverbank Works + (Historic Landfill)
- Case study:Albany Park + (Drone Photograph during early phase of construction)
- Case study:Eddleston water + (New gravel side bar. Photo: Ulrika Åberg, RRC)
- Case study:Ruppoldingen + (The map and plan of Ruppoldingen fishpass.)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (Arrival of mechanisation at the entry to the lake)
- Case study:River Dulais Restoration Project + (Root wad being installed in the bank)
- Case study:The Holbina-Dunavat Restoration Project + (The entrance in Holbina area (source:www.info-delta.ro))
- Case study:Chowder Ness Managed Realignment Scheme + (Aerial view of site in December 2006 (5 months post realignment) (taken by ABP))
- Case study:Rio Tepice urban restoration + (Bioengineering works)
- Case study:Barking Creek near A13 + (During construction)
- Case study:Bakenhof Dyke reconstruction + (During construction)
- Case study:Salmons Brook Flood Alleviation Scheme, Montagu Recreation Ground site + (Scheme plan)
- Case study:Whit Beck River Restoration Project + (The heavily modified raised river channel)
- Case study:Restoration, protection and sustainable development of protected area "Zlato pole" + (Before restoration)
- Case study:Pow Burn Restoration Project + (Pre-restoration location B showing straight incised channel with disconneted riparian zone)
- Case study:Wild Wylye Phase 1 + (Large Woody Debris Secured on the inner bend propagates sedimentation, eventually leading to channel narrowing.)
- Case study:River Darent at Hawley Manor + (River Darent at Hawley Manor before works)
- Case study:Wansbeck 100 + (During works)
- Case study:Habitat improvements in the upper Kennet + (During works)
- Case study:Restoration of Wandle Park + (During works)
- Case study:River Soar fish refuge and wetland scrape + (Before works)
- Case study:Conservation of alluvial + (The Danube River)
- Case study:Alkborough tidal defence scheme + (During works_1)