Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Eden Crayfish Restoration Project + (Eden Catchment - ecological status)
- Case study:River Pool Linear Park Enhacement + (The restored river, complete with berms. April 2012)
- Case study:Ladywell Fields (QUERCUS) + (Ladywell Fields fully restored, August 2008)
- Case study:Dove Weir removal + (Example of an existing weir upstream of works, August 2011)
- Case study:Bleinheim Palace Project + (River Evenlode, May 2006)
- Case study:Glenbrook Wetlands + (Creating basin 1)
- Case study:Houndsden Road Rain Gardens + (Volunteers planting the swale)
- Case study:Scolo Desolino restoration project + (Creation of new meanders)
- Case study:Built Kjøsnesbekken in the river Stjørdalselva + (Creek and main river (photo: Arne Jørgen))
- Case study:Upper Witham Restoration + (Colsterworth just after restoration.)
- Case study:Source to Sea Programme – 3. Upper Wenning Restoration + (Crook Beck - Environment Agency inspecting new fences - where none had been before)
- Case study:Saltburn Gill ironstones mines + (Mine discharge point)
- Case study:Historic Mill Restoration Project + (Lateral sheet piling used to create the weir)
- Case study:Babingley River at Hillington + (Before Works - April 2006)
- Case study:Lodge Burn cascade fish pass and culvert bed restoration (as part of the Lodge Burn FAS) + (Culvert outlet pre-works was causing a major obstruction to fish passage (Rivers Agency))
- Case study:Source to Sea Programme – 6. Roeburn Ford easement + (Old river crossing - with fish passes that do not work!)
- Case study:Création d’un bras de contournement de plusieurs étangs sur le Fliez et restauration du marais de Contes + (L’un des étangs de Contes (Source: FDAAPPMA 62).)
- Case study:ReNaturalize + (Installation of flexible structure)
- Case study:Pearls in Peril LIFE+ GB Project - River Dee + (Map of instream restoration sites - Aboyne & Banchory)
- Case study:The Manzanares River Restoration: Demolition of an obsolete dam and riverine ecosystem rehabilitation + (Dam before demolition)
- Case study:Weir demolition in river Nansa, Cantabria + (Aerial view of Nansa River in Camijares)
- Case study:River Adur - Shipley weir removal + (Shipley weir in Winter)
- Case study:Shaping and protecting water-mud biotopes in Garwolin Forest division through development of small retention + (Retention reservoir (photo by: W. Mioduszewski) GWP Eastern Europe)
- Case study:Small Retention - Big Deal, A National Program on Natural Small Water Retention Measures + (Damming device on the channel constructed in the 1920s Source: Waldemar Mioduszewski and Tomasz Okruszko. GWP Poland.)
- Case study:Day Brook Restoration - Gedling + (Day Brook before)
- Case study:Day Brook Rain Gardens + (Day Brook rain garden)
- Case study:Hierdense Beek + (De beek bij Staverden)
- Case study:Dysart Park, Grantham Habitat Improvement + (Site before works, Summer 2020. Very shaded and with a silt dominated, over widened)
- Case study:River restoration project in Sella, Asturias + (Aerial view of Sella River downstream Arriondas)
- Case study:River Stour at Glen's weir (Throop fisheries) + (Glen's Weir (EA report, 2011))
- Case study:Babingley River at Hillington + (Before Works - April 2006)
- Case study:Nar SSSI project + (Deflector transformed to shoulder, March 2011)
- Case study:River Avon Our Water Environment + (One of two areas of sediment to be removed to re-open a secondary channel (W.Boyd-Wallis-CNPA))
- Case study:Deculverting Djupsund stream + (Djupsund stream after deculvering. Picture: Miguel A. Segarra Valls)
- Case study:River Dart (Totnes) hydropower + (Design plans)
- Case study:Effacement du seuil de Chelles Basse sur le Miodet + (Mise en place d’un chenal de dérivation pendant les travaux (Source: Alain Bonnet - Onema).)
- Case study:Creation and restoration of a riparian zone + (Map and aerial photograph of the area of action)
- Case study:Bio-engineering techniques for bank protection on the Moselle River in Villey-le-Sec + (Eroded sections appeared in the banks following the collapse of metal sheet piles along the Moselle River. August 2008. (Patrick Adolph – VNF).)
- Case study:Restoration of the original riverbed of the Steinbaechlein + (The Steinbaechlein in October 2007, two years after restoration.)
- Case study:Saltburn Gill ironstones mines + (Mine discharge point)
- Case study:Rehabilitation of the river Segeråga + (Removing inorganic material (sludge/fine sand. Photo: Kjetil Hansen, Rødøy municipality)
- Case study:Source to Sea Programme – 6. Roeburn Ford easement + (Old river crossing - with fish passes that do not work!)
- Case study:Eden Crayfish Restoration Project + (Eden Catchment - ecological status)
- Case study:Llobregat river restoration + (Map of the restoration area)
- Case study:Source to Sea Programme – 1. Leighton Moss Resource Protection + (New deep flow gutters needed on traditional buildings to take water to new clean water drain)