Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Bourne End Recreation Ground River Enhancement Project + (View downstream before work started)
- Case study:Westborough + (Works being undertaken.)
- Case study:Knepp Rewilding Project + (Completed works)
- Case study:Welton Farm Landfill/Riverbank Works + (Historic Landfill)
- Case study:Rehabilitation of the River Brett at Shelley, Suffolk + (Composite berm consisting of a downstream flow deflector back-filled with spoil material taken from the originally over-steep embankment. The wooden toe adds stability and protection to the feature.)
- Case study:Reactivating river dynamics in the Vieux-Rhône River (non-navigable section) at Cornas, Roubion and Petite Île + (Old Girardon dike along the Rhône where flood debris accumulated, before the dike was opened. September 2011 (Compagnie nationale du Rhône).)
- Case study:Skårhultsdammen bypass channel at River Knipån + (Meandering of the new stream (photo. Maria Arola))
- Case study:Spring Meadow Meander Restoration + (Upstream part of the project where Himalayan Balsam will need to be managed - © Nick Elbourne (RRC), October 2013)
- Case study:Restoration of Siuruanjoki River + (Catchment of Siuruanjoki River)
- Case study:Wallasea (North) Managed Realignment + (Dredge sediment recharging in November 2005)
- Case study:Elgin Flood Alleviation Scheme + (Pansport Bridge aerial photograph - September 2014 © Royal HaskoningDHV)
- Case study:Restoration of the river area of the section of Betzuca stream + (Aerial view of the restoration area)
- Case study:Prologis Midpoint Park river restoration scheme + (River Tame pre-restoration)
- Case study:Rehabilitation of the river Segeråga + (Removing inorganic material (sludge/fine sand. Photo: Kjetil Hansen, Rødøy municipality)
- Case study:Restoration of Vakkolankoski Torrent + (Construction of the fishway)
- Case study:River Cole- Life Project + (Construction of the meanders)
- Case study:Small Retention - Big Deal, A National Program on Natural Small Water Retention Measures + (Damming device on the channel constructed in the 1920s Source: Waldemar Mioduszewski and Tomasz Okruszko. GWP Poland.)
- Case study:River of Life + (River of Life pre-works (River Restoration Centre))
- Case study:Effacement du seuil de Carayon sur le Thoré + (Vue aval du seuil de Carayon, avant effacement, ponctué par plusieurs brèches sur le déversoir. Juillet 2011 (Source: Yannick Ramadier – Onema).)
- Case study:Minsterley Brook Abandoned Metal Mines + (Copyright Ian Watson Coal Authority)
- Case study:QUERCUS Ravensbourne + (Cornmill Gardens, facing upstream)
- Case study:The River Deerness Project + (Cornsay Colliery culvert)
- Case study:River Cole- Life Project +
- Case study:Eden Crayfish Restoration Project + (Eden Catchment - ecological status)
- Case study:Ladywell Fields (QUERCUS) + (Ladywell Fields fully restored, August 2008)
- Case study:River Pool Linear Park Enhacement + (The restored river, complete with berms. April 2012)
- Case study:Dove Weir removal + (Example of an existing weir upstream of works, August 2011)
- Case study:Bleinheim Palace Project + (River Evenlode, May 2006)
- Case study:Glenbrook Wetlands + (Creating basin 1)
- Case study:Houndsden Road Rain Gardens + (Volunteers planting the swale)
- Case study:Scolo Desolino restoration project + (Creation of new meanders)
- Case study:Built Kjøsnesbekken in the river Stjørdalselva + (Creek and main river (photo: Arne Jørgen))
- Case study:Upper Witham Restoration + (Colsterworth just after restoration.)
- Case study:Source to Sea Programme – 3. Upper Wenning Restoration + (Crook Beck - Environment Agency inspecting new fences - where none had been before)
- Case study:Saltburn Gill ironstones mines + (Mine discharge point)
- Case study:Création d’un bras de contournement de plusieurs étangs sur le Fliez et restauration du marais de Contes + (L’un des étangs de Contes (Source: FDAAPPMA 62).)
- Case study:Historic Mill Restoration Project + (Lateral sheet piling used to create the weir)
- Case study:Babingley River at Hillington + (Before Works - April 2006)
- Case study:Lodge Burn cascade fish pass and culvert bed restoration (as part of the Lodge Burn FAS) + (Culvert outlet pre-works was causing a major obstruction to fish passage (Rivers Agency))
- Case study:Source to Sea Programme – 6. Roeburn Ford easement + (Old river crossing - with fish passes that do not work!)
- Case study:ReNaturalize + (Installation of flexible structure)