Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Wensum Rehabilitation Project - Bintree + (Wensum in February 2001)
- Case study:River Nene Nature Improvement Area + (An example of improved urban marginal river habitat on the Nene)
- Case study:Bastion Maria (QUERCUS) + (Celebration, May 2010)
- Case study:Arborfield nature like bypass and weirs project + (Small fixed-crest weir prior to lowering. Courtesy of Wild Trout Trust and the Environment Agency.)
- Case study:The Manzanares River Restoration: Demolition of an obsolete dam and riverine ecosystem rehabilitation + (Aerial view of the restoration area)
- Case study:Diversion of the River Nith + (Channel diversion in construction (2000). Courtesy of the River Restoration Centre.)
- Case study:Whit Beck River Restoration Project + (The heavily modified raised river channel)
- Case study:Test and Itchen River Restoration Strategy + (Backwater/ fish refuge on the Park Stream, Bossington Estate (tributary of the River Test) ©RRC June 2014)
- Case study:Belton Floodplain Reconnection and River Restoration + (Channel before any of the works.)
- Case study:Lodge Burn Flood Alleviation Scheme + (Channel restoration in Anderson park during works. Gabion baskets installed to constrain lateral channel migration. Courtesy of Gareth Greer - Rivers Agency (Northern Ireland). See main project photo for post-restoration channel.)
- Case study:River Restoration at Hunworth (River Glaven) + (Channel sinuosity was increased as a result of the scheme)
- Case study:Burn of Mosset, Forres + (Chapelton Dam control structure (2013))
- Case study:Haltwhistle burn; a total catchment approach + (Electro-fishing with volunteers)
- Case study:Gilev's Grove reconstruction + (Klyuchi stream rehabilitation)
- Case study:Houghton 'trout stream' enhancements + (River Lamprey spawining on clean gravels)
- Case study:Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia ) + (Chícamo headwater reach)
- Case study:The Ciobarciu Wetland Project + (Ciobarciu area - before restoration)
- Case study:Source to Sea Programme – 3. Upper Wenning Restoration + (Crook Beck - Environment Agency inspecting new fences - where none had been before)
- Case study:Dysart Park, Grantham Habitat Improvement + (Site before works, Summer 2020. Very shaded and with a silt dominated, over widened)
- Case study:Test and Itchen River Restoration Strategy + (Backwater/ fish refuge on the Park Stream, Bossington Estate (tributary of the River Test) ©RRC June 2014)
- Case study:Guadiamar Green Corridor Project + (Aerial view)
- Case study:River Avon Our Water Environment + (One of two areas of sediment to be removed to re-open a secondary channel (W.Boyd-Wallis-CNPA))
- Case study:River Keekle Restoration + (Typical condition pre-restoration)
- Case study:Welton Farm Landfill/Riverbank Works + (Historic Landfill)
- Case study:Source to Sea Programme – 5. Borrowdale Moss, Peatland Restoration + (Exposed peat - erosion problem)
- Case study:Rétablissement de la continuité écologique sur la Luire + (Un des ouvrages problématiques sur la Luire à Clos Merle (2008) (Source: SIAG).)
- Case study:Colne Water Restoration Project + (Colne Water Restoration Area)
- Case study:River restoration project in Sella, Asturias + (Aerial view of Sella River downstream Arriondas)
- Case study:Eldbäcken + (Floodplain habitat during high flow conditions. Photo: Olle Calles)
- Case study:Upper Witham Restoration + (Colsterworth just after restoration.)
- Case study:Kirkstall Valley Weir Fish Passes Project + (Map of the area)
- Case study:Creation of a Constructed Farm Wetland + (Original site: pre-construction)
- Case study:Braid Burn at Inch Park + (Before works - April 2006)
- Case study:Bourne End Recreation Ground River Enhancement Project + (View downstream before work started)
- Case study:Sunrise, River Trent, Staffordshire University + (Completed scheme 2020)
- Case study:Knepp Rewilding Project + (Completed works)
- Case study:Westborough + (Works being undertaken.)
- Case study:Rehabilitation of the River Brett at Shelley, Suffolk + (Composite berm consisting of a downstream flow deflector back-filled with spoil material taken from the originally over-steep embankment. The wooden toe adds stability and protection to the feature.)
- Case study:Skårhultsdammen bypass channel at River Knipån + (Meandering of the new stream (photo. Maria Arola))
- Case study:Reactivating river dynamics in the Vieux-Rhône River (non-navigable section) at Cornas, Roubion and Petite Île + (Old Girardon dike along the Rhône where flood debris accumulated, before the dike was opened. September 2011 (Compagnie nationale du Rhône).)
- Case study:Spring Meadow Meander Restoration + (Upstream part of the project where Himalayan Balsam will need to be managed - © Nick Elbourne (RRC), October 2013)