Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Restorations of Ritobäcken brook + (Building the floodplain by the Ritobäcken Brook in 2010 (photo: Kari Koppelmäki))
- Case study:Skjern River Project + (Removal of an old pumping station)
- Case study:Oughtershaw NFM + (Scrape)
- Case study:Woughton on the Green bank stabilization + (Large log bundles at base)
- Case study:Salmonid, coarse fish and wetland bird habitat and flood plain linkage project, Hampshire Avon + (Burcombe - post works)
- Case study:Kirkstall Valley Weir Fish Passes Project + (Map of the area)
- Case study:Guadiato Life project Model for restoring and integrating water resources in a mining area, actions for an alternative development + (Aerial view of La Coronada, municipality where a green filter has been placed)
- Case study:River Marden at Calne + (River Marden before restoration looking downstream)
- Case study:Réduction de l’impact de trois étangs sur cours d’eau dans le bassin du Cousin + (L’étang Fortier : installation d’un moine hydraulique (Source: Pierre Durlet – PNR Morvan).)
- Case study:Irpin river restoration + (Landuse pressures will be identified and solutions proposed (photo Vasiliy Kostiushyn))
- Case study:River Dearne at Mexborough + (Canalised reach before restoration works)
- Case study:Removal of Carleton Hall weir, Eamont Bridge, Penrith, Cumbria + (Carleton Hall weir, River Eamont, Eamont Bridge, Cumbria before removal)
- Case study:Fluvial restoration in River Carrión + (Aerial view of Carrion River between Pino del Río and Fresno del Río)
- Case study:Fluvial restoration in River Carrión + (Carrión River before works)
- Case study:Restoration of the Cassaire wetland (Rhôle delta) + (Cassaire site two years after the beginning of the hydraulic management)
- Case study:QUERCUS Dee + (Castle Drive Improvements, Spring 2008)
- Case study:Restoration of Kalajoki River + (Catchment of River Kalajoki (Jouni Näpinkangas))
- Case study:Restoration of Siuruanjoki River + (Catchment of Siuruanjoki River)
- Case study:River Wensum Rehabilitation Project - Bintree + (Wensum in February 2001)
- Case study:River Nene Nature Improvement Area + (An example of improved urban marginal river habitat on the Nene)
- Case study:Bastion Maria (QUERCUS) + (Celebration, May 2010)
- Case study:Arborfield nature like bypass and weirs project + (Small fixed-crest weir prior to lowering. Courtesy of Wild Trout Trust and the Environment Agency.)
- Case study:The Manzanares River Restoration: Demolition of an obsolete dam and riverine ecosystem rehabilitation + (Aerial view of the restoration area)
- Case study:Belton Floodplain Reconnection and River Restoration + (Channel before any of the works.)
- Case study:Diversion of the River Nith + (Channel diversion in construction (2000). Courtesy of the River Restoration Centre.)
- Case study:Whit Beck River Restoration Project + (The heavily modified raised river channel)
- Case study:Test and Itchen River Restoration Strategy + (Backwater/ fish refuge on the Park Stream, Bossington Estate (tributary of the River Test) ©RRC June 2014)
- Case study:Lodge Burn Flood Alleviation Scheme + (Channel restoration in Anderson park during works. Gabion baskets installed to constrain lateral channel migration. Courtesy of Gareth Greer - Rivers Agency (Northern Ireland). See main project photo for post-restoration channel.)
- Case study:River Restoration at Hunworth (River Glaven) + (Channel sinuosity was increased as a result of the scheme)
- Case study:Burn of Mosset, Forres + (Chapelton Dam control structure (2013))
- Case study:Haltwhistle burn; a total catchment approach + (Electro-fishing with volunteers)
- Case study:Gilev's Grove reconstruction + (Klyuchi stream rehabilitation)
- Case study:Houghton 'trout stream' enhancements + (River Lamprey spawining on clean gravels)
- Case study:Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia ) + (Aerial view of the restoration area)
- Case study:The Ciobarciu Wetland Project + (Ciobarciu area - before restoration)
- Case study:Source to Sea Programme – 3. Upper Wenning Restoration + (Crook Beck - Environment Agency inspecting new fences - where none had been before)
- Case study:Dysart Park, Grantham Habitat Improvement + (Site before works, Summer 2020. Very shaded and with a silt dominated, over widened)
- Case study:Guadiamar Green Corridor Project + (Aerial view)
- Case study:River Avon Our Water Environment + (One of two areas of sediment to be removed to re-open a secondary channel (W.Boyd-Wallis-CNPA))