Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Rehabilitation of Benta stream + (Benta stream_1)
- Case study:Twineham Weir Removal & In-channel Enhancements + (Twineham Tilting Gate Pre-Removal)
- Case study:Dysart Park, Grantham Habitat Improvement + (Site before works, Summer 2020. Very shaded and with a silt dominated, over widened)
- Case study:River restoration on the River Brett at Shelley + (An elongated berm feature on the River Brett near Layham)
- Case study:River Cole- Life Project + (Construction of the meanders)
- Case study:River Alt and Croxteth Brook Restoration Project. + (Original river flowing into culvert)
- Case study:Guadiato Life project Model for restoring and integrating water resources in a mining area, actions for an alternative development + (Aerial view of La Coronada, municipality where a green filter has been placed)
- Case study:Mill house private hydroelectric power generation scheme and fish pass + (Fish pass construction (image courtesy of A.Girdler at A.G.A Group))
- Case study:Rio Tepice urban restoration + (Bioengineering works)
- Case study:Segura's River Bioremediation + (Brick application system into the river mud)
- Case study:Biodiversity conservation and recovery in the river basin Asón + (Birth of Asón River in Cailagua waterfall)
- Case study:Restoration and conservation of riparian forests - habitats of European conservation importance on the territory of Dimitrovgrad municipality + (Before restoration)
- Case study:Healthy Rivers + (Blockage removed from Ebbw River)
- Case study:Langonnet river + (Examples of intervention on the Lagonnet river.)
- Case study:Restoring of ecological connectivity and implementation of activities improving functioning of the free river migration corridor + (Jankowa (km 61+160 Biala River))
- Case study:Bocq river (Walphy - LIFE project) +
- Case study:Bocq river (Walphy - LIFE project) + (Bocq: Rehabilitation projects)
- Case study:East Mascalls Fish Pass + (Bolting the Pass Together Prior to Installation)
- Case study:Borrowash fish pass + (Borrowash weir 121m long (image courtesy of J.Finnegan at the Environment Agency))
- Case study:Source to Sea Programme – 5. Borrowdale Moss, Peatland Restoration + (Exposed peat - erosion problem)
- Case study:Bow Brook Living Landscape + (Bow Brook Farm Relict Channel)
- Case study:Whit Beck River Restoration Project + (The heavily modified raised river channel)
- Case study:Eldbäcken + (Floodplain habitat during high flow conditions. Photo: Olle Calles)
- Case study:River Little Ouse at Thetford + (Reopening the meanders)
- Case study:Watercress Farm Rewetting Project + (River Restoration channel drone photography)
- Case study:Albany Park + (Drone Photograph during early phase of construction)
- Case study:River Valency at Boscastle + (Reference reach upstream of Boscastle)
- Case study:Beltringharder Koog Regulated Tidal Exchange Scheme + (View along sea wall (saline lagoon to left, fronting tidal flats with sedimentation fields to right) (Taken by: S. Armstrong, ABPmer, 2001))
- Case study:Guadiato Life project Model for restoring and integrating water resources in a mining area, actions for an alternative development + (Aerial view of La Coronada, municipality where a green filter has been placed)
- Case study:Restoration of the river continuity on the Touques Basin + (Orville dam on the upper Touques before and after its removal (Arnaud Richard, Onema).)
- Case study:Segura's River Bioremediation + (Brick application system into the river mud)
- Case study:The River Deerness Project + (Cornsay Colliery culvert)
- Case study:Babingley River at Hillington + (Before Works - April 2006)
- Case study:Syston and Barkston Restoration + (Tree works)
- Case study:Habitat enhancement of the River Waveney through Bressingham + (Looking downstream at a berm feature that was installed on the true left-hand bank of the River Waveney)
- Case study:River Varde Valley and the meadows of Ho Bay (Ho Bugt) environment improvement project + (Tarphage +Holmen25mar 005)
- Case study:Restorations of Ritobäcken brook + (Building the floodplain by the Ritobäcken Brook in 2010 (photo: Kari Koppelmäki))
- Case study:Skjern River Project + (Removal of an old pumping station)
- Case study:Oughtershaw NFM + (Scrape)
- Case study:Woughton on the Green bank stabilization + (Large log bundles at base)
- Case study:Salmonid, coarse fish and wetland bird habitat and flood plain linkage project, Hampshire Avon + (Burcombe - post works)
- Case study:Kirkstall Valley Weir Fish Passes Project + (Map of the area)