Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Tall River + (Downstream bays after two years - 1998)
- Case study:Riverlands Porlock Vale Streams + (River Aller Stage 0)
- Case study:Biomura LIFE06NAT/SI/000066 + (New gravel bars)
- Case study:Shaping and protecting water-mud biotopes in Garwolin Forest division through development of small retention + (Retention reservoir (photo by: W. Mioduszewski) GWP Eastern Europe)
- Case study:Wild Wylye Phase 1 + (Large Woody Debris Secured on the inner bend propagates sedimentation, eventually leading to channel narrowing.)
- Case study:Widening and sediment reloading of the Drac riverbed in Saint-Bonneten-Champsaur + (Bed scouring of the Drac into the clay, loss of riparian vegetation and a landslide, in November 2011 (Bertrand Breilh, CEDA).)
- Case study:Allt Lorgy River Restoration + (Before - artificial embankment)
- Case study:Dumbreck Marsh & Garrel Burn Restoration + (Fish pass (lower))
- Case study:Babingley River at Hillington + (Before Works - April 2006)
- Case study:Rio Sant'Ambrogio restoration project + (Before and after restoration)
- Case study:Sågarsfors + (Before dam removal (Jukka Jormola))
- Case study:River Wye Habitat Restoration Project + (New flow deflectors (High Wycombe District Council))
- Case study:The Pow Beck Improvement Project + (Pow Beck fencing and tree planting)
- Case study:Restoration of Longinoja brook + (Longinoja after restauration may 2006 (photo: Liisa Laitinen))
- Case study:Restoration of Rusenski Lom River near Ivanovo + (Before restoration)
- Case study:Restoration, protection and sustainable development of protected area "Zlato pole" + (Before restoration)
- Case study:Restoration and conservation of riparian forests - habitats of European conservation importance on the territory of Dimitrovgrad municipality + (Before restoration)
- Case study:Restoration and conservation of the protected site "Lozenski pat" - wetland + (Before restoration)
- Case study:Restoration of Reinikkalankoski torrent + (Restoration of Reinikkalankoski torrent before restoration (photo: Jukka Jormola)_1)
- Case study:Short Heath Brook Project + (Before the project commenced)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (Arrival of mechanisation at the entry to the lake)
- Case study:Markeaton and Mackworth Brook (MMB) Project + (Before works)
- Case study:River Soar fish refuge and wetland scrape + (Before works)
- Case study:River Idle Hallcroft (Tiln) Weir Fish Pass + (Before works)
- Case study:Braid Burn at Inch Park + (Before works - April 2006)
- Case study:River rehabilitation on the River Wensum at Swanton Morley + (Newly created filled berms – August 2012 ©Environment Agency)
- Case study:Fluvial longitudinal continuity recovery in river Aguanaz, Cantabria, Spain + (Aerial view of Aguanaz River between Hoznayo and Entrambasaguas)
- Case study:Upper Witham Restoration + (Colsterworth just after restoration.)
- Case study:Mayesbrook Climate Change Park restoration project + (Jubilee planting event, March 2012 © LBBD)
- Case study:Rehabilitation of Benta stream + (Benta stream_1)
- Case study:Twineham Weir Removal & In-channel Enhancements + (Twineham Tilting Gate Pre-Removal)
- Case study:Dysart Park, Grantham Habitat Improvement + (Site before works, Summer 2020. Very shaded and with a silt dominated, over widened)
- Case study:River restoration on the River Brett at Shelley + (An elongated berm feature on the River Brett near Layham)
- Case study:River Cole- Life Project + (Construction of the meanders)
- Case study:River Alt and Croxteth Brook Restoration Project. + (Original river flowing into culvert)
- Case study:Guadiato Life project Model for restoring and integrating water resources in a mining area, actions for an alternative development + (Aerial view of La Coronada, municipality where a green filter has been placed)
- Case study:Mill house private hydroelectric power generation scheme and fish pass + (Fish pass construction (image courtesy of A.Girdler at A.G.A Group))
- Case study:Rio Tepice urban restoration + (Bioengineering works)
- Case study:Segura's River Bioremediation + (Brick application system into the river mud)
- Case study:Biodiversity conservation and recovery in the river basin Asón + (Birth of Asón River in Cailagua waterfall)
- Case study:Restoration and conservation of riparian forests - habitats of European conservation importance on the territory of Dimitrovgrad municipality +