Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Nar Restoration Project + (Awaiting results)
- Case study:The River Deerness Project 2 + (Awaiting results)
- Case study:Wild Wylye Phase 1 + (Awaiting results)
- Case study:Restoration of the Bellegarde hydraulic annex and sediment recharge of the Ain River + (Awaiting results)
- Flood detention basin (HRB) Ickern-Mengede + (Awaiting results)
- Case study:Removal of the Fatou dam on the Beaume river + (Awaiting results)
- Case study:Soaring connections: restoring people, wildlife & place + (Awaiting results)
- Case study:Manor Road Park + (Awaiting results)
- Case study:River Don Restoration project + (Awaiting results)
- Case study:Strengthening associated biodiversity of habitat 92A0 and control of Invasive Alien Species in the Segura River (LIFE + Ripisilvanatura) + (Awaiting results)
- Case study:Habitat measures in Strynevassdraget + (Awaiting results)
- Case study:Nursery habitat for the freshwater pearl mussel in Haukåsvassdraget + (Awaiting results)
- Case study:Habitat measures Hollundbekken + (Awaiting results)
- Case study:Rehabilitation of the river Segeråga + (Awaiting results)
- Case study:Upper Cringle Floodplain Restoration Project + (Awaiting results)
- Case study:River Little Ouse at Thetford + (Deterioration)
- Case study:Alkborough tidal defence scheme + (Deterioration)
- Case study:Restoration of the surface flows of two temporary tributaries of the upstream Clauge + (Improvement)
- Case study:Refilling the meanders of the Colostre + (Improvement)
- Case study:Removal of Maisons-Rouges dam over the River Vienne + (Improvement)
- Case study:Removal of five Lakes on the Val des Choues stream + (Improvement)
- Case study:Reopening of a section of the River Bièvre in an urban environment + (Improvement)
- Case study:Ritobäcken-environmentally preferable two-stage drainage channels + (Improvement)
- Case study:Silverån övre + (Improvement)
- Case study:Timber float restorations at River Iijoki + (Improvement)
- Case study:Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia ) + (Improvement)
- Case study:Fluvial restoration in River Carrión + (Improvement)
- Case study:SCI Parga-Ladra-Támoga: recovery of bog woodland and dystrophic lake + (Improvement)
- Case study:Stora, Holstebro HEP station + (Improvement)
- Case study:Ems floodplain + (Improvement)
- Case study:River Skerne- Life project + (Inconclusive)
- Case study:River Quaggy- Chinbrook meadows + (Improvement)
- Case study:River Cole- Life Project + (Improvement)
- Case study:River Dee + (Improvement)
- Case study:Vester Nebel Restoration + (Improvement)
- Case study:River Kennet Restoration at Durnsford + (Improvement)
- Case study:River Avon at East Chisenbury + (Improvement)
- Case study:Rother meander reconnection + (Inconclusive)
- Case study:RSPB Fowlmere Nature Reserve + (Improvement)
- Case study:Inchewan Burn Bed restoration + (Improvement)
- Case study:Meades water garden regeneration project + (Improvement)