Search results
Jump to navigation
Jump to search
- |Contact organisation=cbec eco engineering |Picture description=Mains of Dyce, newly completed. Photograph courtesy of cbec eco engineering2 KB (312 words) - 06:31, 6 September 2013
- ...cal survey, geomorphological assessment,fluvial audit carried out in 2018 (cbec); Hydromorphological survey in 2019 (EnviroCentre). Post-restoration monito |Investigation and design Lead organisation=CBec Eco Engineering8 KB (1,010 words) - 14:25, 21 June 2021
- ...anisations=South Lanarkshire Council, River Restoration Centre, WSP group, cbec eco engineering,3 KB (380 words) - 13:54, 28 June 2017
- |Investigation and design Lead organisation=WSP/CBEC |Works and supervision Lead organisation=George Leslie/WSP/CBEC8 KB (1,097 words) - 14:32, 14 July 2022
- ...eloped based on detailed 2D flood modelling undertaken in conjunction with cbec eco-engineering. Practical works were delivered during Summer 2014 with app4 KB (489 words) - 15:30, 6 June 2017
- |Investigation and design Lead organisation=CBec Eco Engineering5 KB (663 words) - 13:08, 26 August 2021
- ...onstructed where the river was showing signs of partially formed features. Cbec eco-engineering were contracted to do the initial survey and design, and lo5 KB (701 words) - 12:12, 29 January 2021
- |Name=cbec eco-engineering |Notes=cbec has substantial experience with assessment, design and implementation of ri15 KB (2,271 words) - 10:57, 21 February 2014
- |Investigation and design Lead organisation=cbec eco-engineering UK Ltd |Monitoring Lead organisation=cbec eco-engineering UK Ltd13 KB (1,778 words) - 10:39, 25 March 2019
- |Caption=Picture by cbec7 KB (856 words) - 10:29, 6 July 2023