Case study:Four Rivers for LIFE

From RESTORE
Jump to navigation Jump to search
0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 52' 55.20" N, 3° 59' 2.36" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status In progress
Project web site http://https://naturalresources.wales/about-us/what-we-do/our-projects/our-nature-projects/4-rivers-for-life/?lang=en
Themes Fisheries, Habitat and biodiversity, Hydromorphology, Land use management - agriculture, Monitoring, Peat
Country Wales
Main contact forename Josh
Main contact surname Robins
Main contact user ID User:JoshRRC
Contact organisation
Contact organisation web site
Partner organisations Natural Resources Wales, River Restoration Centre, EU's LIFE Environment Fund, Welsh Water, Welsh Government, Woodland Trust, Brecon Beacons National Park Authority, Coleg Sir Gar
This is a parent project
encompassing the following
projects
Brecon Weir Modification, Llangloffan Fen Habitat Restoration, Senni Bridge Replacement, Ty Mawr
Project picture

Project summary

Edit project overview to modify the project summary.


Four Rivers for LIFE is an ambitious, large-scale river restoration project to improve the condition of four major rivers in Wales: Teifi, Cleddau, Tywi and Usk. These four rivers are classed as Special Areas of Conservation (SAC) which means they are of international importance for their wildlife and plants such as Atlantic salmon, lamprey, shad, otter and water crowfoot. All four rivers are currently in an unfavourable condition as a result of multiple pressures.

A total of 776km of river will be improved in mid and south Wales over the next four years. The project will aim to restore the rivers to a better condition. The rivers support several habitats and species from bogs and floodplains to fish, otter, freshwater pearl mussel and floating water plantain. These habitats and species are all threatened, and some are at risk of disappearing in Wales.

The project will use long term nature-based solutions to improve the ecological quality of the four rivers such as, improving accessibility for migratory fish, improving habitat structure and function, and improving water quality.

Working with partner organisations, farmers, landowners, local communities and contractors the project aims to:

  • Improve conditions for salmon, lamprey, shad, bullhead and other fish populations that have declined drastically in recent years.
  • Remove constraints to fish migration – improve fish passage at 12 sites, addressing in-river barriers such as weirs and other structures.
  • Re-naturalise rivers and restore natural processes – boulder, woody material and gravel re-introduction. Re-meandering, and floodplain reconnection along 5km of river and restoration of freshwater and wetland habitats on 136 hectares of floodplain.
  • Plant 50,000 native trees (supplied by the Woodland Trust) along river banks to create habitat, increase shading and establish buffer strips with 100km of fencing, with associated water quality and bank stability benefits.
  • Reduce the impact of invasive non-native species such as Himalayan balsam, American skunk cabbage, Japanese knotweed and giant hogweed. Trialling Rust Fungus on 8 sites to reduce Himalayan balsam, and working with contractors and volunteers to significantly reduce coverage in 15 sub-catchments.
  • Improve land management practices – reducing nutrients and sediment inputs from agricultural land by working with farmers and landowners to promote best practice farming techniques with the aim of engaging 350 farms.
  • Habitat improvement over 15km for the critically endangered Freshwater Pearl Mussel.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information